1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.

Slides:



Advertisements
Similar presentations
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Advertisements

Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Critical Facilities, Data Center,& IT Regional Seminar Series Mike.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Energy Efficiency Office, EMSD
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Spring 2006  Harvard Science, A 52 FHA+MBM Lecture 18, 1 Science A 52 Lecture 18; April 17, 2006 Refrigeration a)Technical background b)Visit to the Chilled.
SWAAAE Tim Holmes Kenwood Energy January 30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
Green Building Demonstration Project Adam Saling City of San Diego.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
N O R T H A M E R I C A C O M M E R C I A L TDP
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
Marriott Corporate Headquarters
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.
North Coast Wind Farm Tolano Environmental Consulting.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David Dale Procurement Manager CFAC Status Meeting May 8, 2008.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Introduction to Mechanical Engineering
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Energy Savings Projects
Grunenwald Science and Technology Building
FRESNO COUNTY WEST ANNEX JAIL
Site Plan Requirements
Far Experimental Hall Hutches Civil Construction
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES Outline CCW Plant Expansion (WBS ) Construction Package Scope Construction Package Schedule Construction Package Management/Oversight CCW Piping (WBS ) Construction Package Scope Construction Package Schedule Construction package Management/Oversignt

3 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion Scope (WBS ) Five (5) bay expansion to the existing CCWF (B-0600), Central Chilled Water (CCW) Plant expansion shared between NSLS-II and BNL NSLS-II share is 3 bays & two chillers+- Expansion of the CCW Pump House (B-0600A) by five (5) pump bays Installation of two (2) 1,250-ton electric centrifugal chillers & associated pumps Addition of two (2) cooling tower cells (cooling tower basin construction for 5 cells) Addition to existing electrical substation Associated electrical, mechanical, HVAC infrastructure and site work.

4 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion Construction Package ScheduleBaselineCWE Bid Package available (design pkg)12/10/0811/19/08(A) Bid Solicitation (IFB in DOE review)1/29/093/13/09 Bids Returned3/3/094/26/09 Contract Award4/28/095/29/09 Notice to Proceed (Construction Start)6/4/097/06/09 Construction Complete (Beneficial Occupancy)3/24/111/31/11 Operations (CCWF added capacity available)3/24/112/28/11 Procurement process is lagging by ~1+ month but have ~3 months float before CCW is needed

5 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion Construction Package Management/Oversight Design Design by Giffels Partnership (consultant A/E) Design management by BNL Energy Management Division (EMD) Design review by NSLS-II Procurement Bid solicitation by BNL Procurement & Property Management Division (PPM) with BNL Modernization Program Office (MPO) (*) Review by NSLS-II (*) Construction Construction management/oversight by BNL MPO (*) Review by NSLS-II (*) * - These activities performed in accordance with a CCW Expansion Project Management Plan to be issued by NSLS-II

6 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion North

7 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion B-600 Operating Floor Plan Existing New North 3 Additional Bays & 2 Chillers for NSLS-II 2 Additional Bays for BNL

8 BROOKHAVEN SCIENCE ASSOCIATES CCW Piping Scope (WBS ) New 24” diameter CCW Supply, 24” diameter CCW Return & 3” diameter Compressed Air piping New piping extends between the existing CCW/CA mains on Rochester Street to a point at the edge of the NSLS-II Ring Building Construction site Total distance of approximately 1,100 feet Includes all excavation/backfill, valves, appurtenances and connections to existing CCW and CA mains and site restoration.

9 BROOKHAVEN SCIENCE ASSOCIATES CCW Piping Construction Package ScheduleBaselineCWE Bid Package Ready2/26/093/23/09 Bid Solicitation4/20/094/17/09 Bids Returned5/4/095/08/09 Contract Award6/1/095/22/09 Notice to Proceed (Construction Start)6/29/096/19/09 Construction Complete12/31/0912/18/09

10 BROOKHAVEN SCIENCE ASSOCIATES CCW Piping Construction Package Management/Oversight Design Design by Giffels Partnership (consultant A/E) Design management by BNL Energy Management Division (EMD) Design review by NSLS-II Procurement Bid solicitation by BNL/ NSLS-II PPM Construction Construction management/oversight by NSLS-II

11 BROOKHAVEN SCIENCE ASSOCIATES CCW Piping CCW Piping Plan – Part 1 North Upton Gas Station Existing CCW/CA Mains (Rochester Street) B-0452

12 BROOKHAVEN SCIENCE ASSOCIATES CCW Piping North CCW Piping Plan – Part 2 Existing Drainage Swale & Culverts Interface with Ring Building Piping Intersection Rowland St. & Groves Street