基智科技 結構化佈線系統測試 基智科技 銅線部分 基智科技 Test Standard Requirements.

Slides:



Advertisements
Similar presentations
Cabling system components
Advertisements

Cable Testing.
CCNA 1 v3.1 Module 4 Cable Testing. Purpose of This PowerPoint This PowerPoint primarily consists of the Target Indicators (TIs) of this module in CCNA.
Copper Cable Transmission Characteristics
111 © 2002, Cisco Systems, Inc. All rights reserved. Finish Phase Overview Testing Troubleshooting Certification Documentation.
DCN286 Introduction to Data Communication Technology Session 5.
Session 4: Termination and Splices. 2 FO Connectors Specifications Specifications Loss Repeatability Environment (temp, humidity, vibration, etc.) Reliability.
Category 6 Solutions Category 6 Solutions. Intent Category 6 Cabling Where it came from What it is Why you need it How you use it.
+ Straight-Through Cable Construction Lab 4. + Data Transmission In data transmission system, the transmission medium is the physical path between transmitter.
Testing.
Physical Transmission Media 8 5/9/ Modified by: Brierley.
Copyright Kenneth M. Chipps Ph.D. Testing Copper Media Last Update
Pursuit of Better testing Instrument Let's go in the grandway......
Infrastructure and components. Cable The cable and components used in structured cabling systems is defined in the standards –EIA/TIA 568 x There are.
Optical Interfaces Lab Last Update Copyright 2014 Kenneth M. Chipps Ph.D. 1.
1 Telecom Cabling Testing and cable certification.
CS335 Networking & Network Administration Thursday April 1.
Oct-03 ©Cisco Systems CCNA Semester 1 Version 3 Comp11 Mod4 – St. Lawrence College – Cornwall Campus, ON, Canada – Clark slide 1 Cisco Systems CCNA Version.
Institute of Technology Sligo - Dept of Computing Many Roads To Home Paul Flynn.
寬頻通訊系統基礎教育計畫 分項計畫二 寬頻網路通訊 主要參與人員 黎碧煌 教 授 鍾順平 副教授
WXES2106 Network Technology Semester /2005 Chapter 2 Networking Media CCNA1: Module 3, 4 and 5.
Cabling!. Types of cable Cat 5/5e Plenum Coating Plenum Coating PVC PVC Cat 6/6e Fiber.
1 Version 3.0 Module 4 Cable Testing. 2 Version 3.0 Waves Networking professionals are interested in voltage waves on copper media, light waves in optical.
Measuring Frequency The amplitude of an electrical signal represents height and is measured in volts. The period is the amount of time to complete one.
Testing Optical Fiber Links
1 Fiber Optic Measurement Technique Piotr Turowicz Poznan Supercomputing and Networking Center Training Session Kiev 9-10 October.
Many Roads To Home. LAN Roads UTP STP Coaxial Fiber Optics.
Media Chapter 2. Two types of Cables Baseband Broadband.
Copyright CCNA 1 Chapter 4, Part 1 Cable Testing By Your Name.
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
Installation and testing
1 Guide to Network Cabling Fundamentals Chapter 8.
4 Semester 1 CHAPTER 4 REVIEW JEOPARDY Presented by: Terren L. Bichard.
CCNA 1 Module 4: Cable Testing.
1 Semester 1 Module 4 Cable Testing Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
Fiber Optics LINK LOSS BUDGET.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID Physical Layer Protocols.
DCN286 INTRODUCTION TO DATA COMMUNICATION TECHNOLOGY Network Cable Testers and Tests.
Mod 4 – Cable Testing CCNA 1.
1 CCNA SEMESTER 1 V 3.0 CHAPTER 4 – Cable testing.
1 Ch 5 Local Asynchronous Communication (RS-232).
NESCOT CATC1 Cable Testing CCNA 1 v3 – Module 4. NESCOT CATC2 Waves 1. The _________ of the waves is the amount of time between each wave, measured in.
1 CISCO NETWORKING ACADEMY PROGRAM (CNAP) SEMESTER 1/ MODULE 4 Cable Testing.
Networking Fundamentals Copper Core Cable as Network Media.
Copper Media Describe the specifications and performances of different types of cable. Describe coaxial cable and its advantages and disadvantages over.
資料通訊與電腦網路原理 資料傳輸線路的傳遞模式 資料於傳輸線路的移動 並列傳輸、序列傳輸 基頻、寬頻.
Advantages of the One-Jumper Reference Method 15 July The Advantages of the One-Jumper Reference Method Over the Two-Jumper Reference Method when.
CABLING SYSTEM CERTIFICATION TESTING. TWISTED-PAIR CABLING TESTING.
CCNA 1 Module 4 Cable Testing. 2 Waves Frequency: Frequency: –the number of waves per second Period: Period: –the amount of time that it takes to complete.
Sep-03 ©Cisco SystemsCCNA Semester 1 Version 3 Comp11 Mod4 – St. Lawrence College – Cornwall Campus – Clark slide 1.
1 Discovery 2, Ch 4 Notes. 222 Cabling Standards Standards ensure that networks perform to expectations US—IEEE & ANSI/TIA/EIA Canada—CSA (Canadian Standards.
Electrons travel at approx. constant speed (  20 cm or 8” per ns, 1 ns = s NVP * speed of light) Propagation.
CCNA 1 v3.0 Module 4 Cable Testing. Objectives Waves.
CCNA1 v3 Module 4 v3 CCNA 1 Module 4 JEOPARDY S Dow.
COPPER AND FIBER REVIEW
Cisco Semester 1 Chapter 4 Slides Cable Testing
CABLING SYSTEM CERTIFICATION TESTING. TWISTED-PAIR CABLING TESTING.
By: Thomas Olivotti.  PSNEXT stands for Power Sum Near End Crosstalk and is calculated by transmitting a signal down each wire pair in turn and summing.
Developing Cabling Module Situation at August 2006 Vello Vanem.
Discovery Internetworking Module 4 JEOPARDY K. Martin.
Physical Transmission Media Chapter 8. Objectives In this chapter, you will learn to: Identify the characteristics of wireline transmission Describe the.
Slide 0 Testing Patch Cords Why Bother ? Christian Schillab Product Manager Media Test Fluke Networks Europe
Understand Network Media Types Part 2 LESSON 2.3_B Networking Fundamentals.
Pertemuan 10 Signal & Noise
Ethernet Cable Installation and Troubleshooting
Networking TRANSMISSION MEDIA.
Module 4 Cable Testing.
Introduction to Computers
James Chen Module 4: Cable Testing James Chen 2018/11/10 Yuda college of business.
Wired and Wireless Troubleshooting
Presentation transcript:

基智科技 結構化佈線系統測試

基智科技 銅線部分

基智科技 Test Standard Requirements

基智科技 PERFORMANCE COMPARISON

基智科技 Link Definition: Basic Link

基智科技 High quality measurement ports of the field tester A detailed look at the basic link Telecommunication RoomWork Area Patch panel TO End of the basic link 90 meter (328 ft) max

基智科技 Link Definition: Channel Link

基智科技 Link Definition: Permanent Link

基智科技 High quality measurement ports of the field tester A detailed look at the permanent link End of the permanent link Telecommunication RoomWork Area Patch panel Consolidation Point (optional) TO

基智科技 –Wire map –Length –Attenuation –Near-end crosstalk (NEXT) loss –Power sum near-end crosstalk (PSNEXT) loss –Equal-level far-end crosstalk (ELFEXT) –Power sum equal-level far-end crosstalk (PSELFEXT) –Return loss –Propogation delay –Delay skew –ACR PRIMARY TEST PARAMETERS

基智科技 –Measures the continuity of the link/channel –Open circuits –Short circuits –Reversed pairs –Transposed pairs –Split pairs –Any other miswires … WIRE MAP

基智科技 CORRECT PAIR WIRING Wire Map Results

基智科技 PIN 4 OPEN WIRING Wire Map Results 4

基智科技 REVERSED PAIR Wire Map Results

基智科技 TRANSPOSED PAIRS Wire Map Results Example: mix T568A and T568B wiring standards = Trouble

基智科技 SPLIT PAIRS Wire Map Results

基智科技 –Equals the length of the cable jacket -Physically measure cable jacket length -Use length markings on cable jacket or -Use field tester to estimate cable length electrically -Use length measurement from shortest cable pair –Basic link < 94 m* –Permanent link < 90 m –Channel < 100 m * Inclusive of 2 m Tester Cords at each endLENGTH

基智科技 Test Parameters 訊號傳輸 – 電氣訊號行走在崎嶇不平的路上

基智科技 電子在線路上以趨近定速行進 (  20 cm or 8” per ns, 1 ns = s 額定傳輸速度 (NVP) Nominal Velocity of Propagation 在區域網路上為光速的 60-80% 此速度視電纜的絕緣材料而定 (max 555 ns later..) Propagation delay ( 傳輸延遲 )

基智科技 The length of every electronic road in a cable is slightly different because of twist rates Delay Skew( 不對稱延遲 ) (max 50 ns differences..) But every cable has at least 4 electronic highways

基智科技 is represented by the electrons that get stuck Fewer electrons show up! heat! Attenuation( 衰減 ) There are potholes in the road

基智科技 Attenuation( 衰減 ) 傳輸中訊號損失的總數 以 dB(decibel) 表示 RatioDecibel 1/10dB 1/2-6dB 1/5-14dB 1/10-20dB dB Loss Signal Source Signal Receiver

基智科技 A bump in the road that causes some electrons to go back Return Loss Test ( 回流損失 )

基智科技 A level problem in the electronic road will cause some electrons to fall on an adjacent road Crosstalk ( 串音 )

基智科技 “Stray” Electrons return back to the beginning On a different pair Near End Crosstalk (NEXT) 近端串音

基智科技 Far End Crosstalk is by the electrons that continue to the far end Far end crosstalk(FEXT) 遠端串音

基智科技 Electrons in the air may be picked up by your radio or TV antenna and cause interference! Electromagnetic Interference (EMI) Some electrons may fly into the air and eventually land on earth !

基智科技 The “New” Transmission Model Horizontal Cabling Workstation Switch Four wire pairs – Full duplex on each pair Example: Gigabit Ethernet (1000BASE-T)

基智科技 Power sum takes crosstalk from all 4 pairs into consideration. Remember it can happen at both ends. The concept of “power sum”

基智科技 光纖部分

基智科技 Example 1: Multimode at 1300 nm per TIA Limit per item Qty. Loss Fiber loss ( i.e. 1/2 Km) 1.5 dB /Km 0.5 Km 0.75dB Loss from connectors 0.75 dB dB Loss from splices 0.3 dB dB Total : 2.25 dB LINK LOSS BUDGET

基智科技 Example 2: Multimode at 1300 nm per TIA Limit per item Qty. Loss Fiber loss 1.5 dB /Km 1.5 Km 2.25 dB Loss from connectors 0.75 dB dB Loss from splices 0.3 dB dB Total : 4.35 dB LINK LOSS BUDGET

基智科技 Optical loss test set ·Used for field testing of installed links ·Includes power meter & light source ·Verify that loss is less than “specified” loss budget ·Include 3 dB allowance due to aging to guarantee 11 dB link margin at all times TEST EQUIPMENT & PROCEDURE

基智科技 Fiber scopes ·Used to inspect ends of connectorised fibers for polish and cleanliness ·More than 80% of installers use fiber scopes… sometimes in lieu of testing ·Cleaning and visual inspection with scope is often first step in troubleshooting TEST EQUIPMENT & PROCEDURE

基智科技 A BA B FJ PlugFJ Jack Ensure polarity is correct - connect your plugs and jacks A to B and B to A TEST EQUIPMENT & PROCEDURE

基智科技 Step 1: Set your Reference value Fiber #1 Fiber #2 B A A B Light Source Power Meter SC-SC Adapter Ref Lead SC-SC Step 2: Record the value as your reference power level Ref Lead SC-SC TEST EQUIPMENT & PROCEDURE

基智科技 Fiber #1 Fiber #2 B AAB Light Source Power Meter Cable link being tested 850nm Step 3: “Insert” link being test Step 4: Subtract power level reading from reference power level to get the “Link power budget” Ref Lead SC-SC Ref Lead SC-SC TEST EQUIPMENT & PROCEDURE