The Next Generation of Sub- Millimeter Receiver Control Steward Observatory Symposium Feb 26-27, 2008 Steward Observatory Symposium Feb 26-27, 2008 Thomas.

Slides:



Advertisements
Similar presentations
Chapter 8: Operating Systems and Utility Programs
Advertisements

Ascendent's Fusion 360 hybrid platform creates a true hybrid surveillance system by utilizing the advantages of Analog, Megapixel, and IP technologies.
User Input Session Presented by: Dan Davis Global Field Solution.
CENTURION™ (C4-SERIES) Erin Cox, Market Research Analyst, Natural Gas Production Controls - Presenter Sanjay Kumar, Market Research Specialist & Product.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Introduction to Computer Administration Introduction.
Computer Parts Assignment
Linux Migration GBT e2e Software Review May 3, 2005 Ramon Creager Melinda Mello
A.R. Hertneky J.W. O’Brien J.T. Shin C.S. Wessels Laser Controller One (LC1)
Networked HVAC Controller Bradley University Department of Electrical & Computer Engineering By: Ed Siok Advisor: Dr. Malinowski.
Guitar Effects Processor Critical Design Review October, 07, 2003 Groups Members: Adam Bernstein Hosam Ghaith Jasenko Alagic Matthew Iyer Yousef Alyousef.
Climate Monitoring WEB Interface Using 1_Wire™ Sensors Imad Hoteit Hassan Wehbe.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
1-1 Embedded Software Development Tools and Processes Hardware & Software Hardware – Host development system Software – Compilers, simulators etc. Target.
MCDST : Supporting Users and Troubleshooting a Microsoft Windows XP Operating System Chapter 9: Troubleshooting Power Management and I/O Devices.
Final Presentation Spring 2003 Project ID: D0822 Project Name: WinCE integrating BT media share application Supervisor: Evgeny Rivkin Performed by: Maya.
Elliot Buller Luke Ciavonne Mehdi Mehrpartou Advisor: Dr. Steven Reising.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
Using FPGAs with Embedded Processors for Complete Hardware and Software Systems Jonah Weber May 2, 2006.
CCNA 1 Module1. Objectives Internet Connections Physical – NIC card to connect to local net Logical – Use a standard set of protocols (TCP/IP) Applications.
1 Semester 2 Module 2 Introduction to Routers Yuda college of business James Chen
Hard&Soft Contest, Suceava Timisoara ONE recycling team 2HandyDokcTOr: 2-nd Hand computer system Diagnostic and monitoring kit created by the 'Timisoara.
Chapter 2: Installing and Upgrading to Windows Server 2008 R2 BAI617.
Your Interactive Guide to the Digital World Discovering Computers 2012.
Final Year Project Presentation A Remote FPGA Laboratory Environment David Hehir 4 th Year EE Supervisor: Fearghal Morgan.
Ken Dorsey KA8OAD. What is EchoLink? The simple answer is EchoLink software uses VoIP technology to link ham radio stations together around the world.
Mark Recoskie November 14, Agenda  Quick review of value proposition  Review of Warp r1v2 hardware and software  What’s new in Warp 3.0 hardware?
PHP With Oracle 11g XE By Shyam Gurram Eastern Illinois University.
Section 2 Software.
Alex Apel Stephen Rashid Justin Robinson. Overview System Architecture PC Software Design Block Diagram GUI Design Digital Hardware Design Description.
ECE415 Senior Design Project Spring 2009 FPR Presentation Robert Basile Rowan Oberski Qiaowen Zheng Danxiang Li Faculty Advisor: Russell Tessier Enjoy.
Concept of Modular Design Module Carriers Embedded or PC-Host Modules A/D,D/A,I/O DSP,FPGA IMAGING,MEMORY Systems Data Acquisition Medical Industrial Control.
Section 2 Section 2.1 Identify hardware Describe processing components Compare and contrast input and output devices Compare and contrast storage devices.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Wireless Sensor Networks MOTE-KITS TinyOS Crossbow UC Berkeley.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Xilinx LogiCore Animation and Connect6 game development on Remote FPGA Student - Stephen Conway Supervisor - Fearghal Morgan Co-Supervisor – Martin Glavin.
MACCE and Real-Time Schedulers Steve Roberts EEL 6897.
SMT Control System Steward Observatory Faculty MeetingMay 02, 2003 A rizona R adio O bservatory Thomas W. Folkers.
Hands-on Teleoperation TARET Winter School Villach, February 5 –16, 2007 Darko Hercog.
Representing Numerical Data Analog Any signal that varies continuously over time Mechanical Pneumatic Hydraulic Electrical Digital Quantities are represented.
The Break-Through in Communication
ALMA Science WorkshopMay 14, 2004 Present and Future Thomas W. Folkers Arizona Radio Observatory.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Introducing Software Computer Concepts Unit A. Introducing Software What is an Operating System? OS is the master controller for all the activities that.
Experiment Management System CSE 423 Aaron Kloc Jordan Harstad Robert Sorensen Robert Trevino Nicolas Tjioe Status Report Presentation Industry Mentor:
Introduction to Computer Operating Systems
Operating System Basics
Introduction to Routers
Internet FTP to network. Preliminary Steps a FTP program is used and executed such as WS_FTP LE Information needed –host name –user id –password.
“We watch so you don’t have to.” Midterm Presentation Tuesday, February 05, 2002.
17 Establishing Dial-up Connection to the Internet Using Windows 9x 1.Install and configure the modem 2.Configure Dial-Up Adapter 3.Configure Dial-Up Networking.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Router Initialization steps.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
COMPUTER ARCHITECTURE & OPERATIONS I Instructor: Yaohang Li.
IBM Express Runtime Quick Start Workshop © 2007 IBM Corporation Deploying a Solution.
1 Emulab's Current Support For IXPs: An example of support for non-PCs.
CHAPTER 2 COMPUTER SOFTWARE. LEARNING OUTCOMES At the end of this class, students should be able to:  Explain the significance of software  Define and.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
Timothy Kritzler and Joseph Mintun Sponsor: Martin Engineering, Illinois Advisors: Dr. Malinowski and Dr. Ahn Bradley University Electrical and Computer.
Do you Have a Problem For- For-. Techiezoncall.com Techiezoncall.com Offers Online Technical Support To Global Customers, Just
A. Aloisio, R. Giordano Univ. of Naples ‘Federico II’
Computer Architecture & Operations I
Building a Wireless Recomposible and Reconfigurable Embedded System
TYPES OFF OPERATING SYSTEM
AQT90 FLEX Service Training
David Nicholls, Hitex (UK) Ltd.
Nat 4/5 Computing Science Operating Systems
Online software and backups
A Bare PC Text Based Browser
Presentation transcript:

The Next Generation of Sub- Millimeter Receiver Control Steward Observatory Symposium Feb 26-27, 2008 Steward Observatory Symposium Feb 26-27, 2008 Thomas Folkers David Forbes Arizona Radio Observatory

Why Remote Receiver Control? ◊Allows: Remote Tuning Remote Diagnosis & Debugging Consistency in Training and Operation Faster Frequency Changes and Setup ◊Allows: Remote Tuning Remote Diagnosis & Debugging Consistency in Training and Operation Faster Frequency Changes and Setup

Receiver Control Design History ◊Designed in 1989 by NRAO for the 12 Meter VxWorks VME Computer ($10,000) ◊DOS Based Interface One User Interface Session Supported Card Cage Interface to Hardware Updated to SunOS/X11 Interface in 1992 ◊Design Revision in 2004 for JT System Embedded Computer ($1,000) ◊PC104 I/O Cards (2 x $400) Linux RH90 ◊Unlimited Number on User Interfaces Supported Used Same Card Cage I/O Design GTK User Interface ◊Designed in 1989 by NRAO for the 12 Meter VxWorks VME Computer ($10,000) ◊DOS Based Interface One User Interface Session Supported Card Cage Interface to Hardware Updated to SunOS/X11 Interface in 1992 ◊Design Revision in 2004 for JT System Embedded Computer ($1,000) ◊PC104 I/O Cards (2 x $400) Linux RH90 ◊Unlimited Number on User Interfaces Supported Used Same Card Cage I/O Design GTK User Interface

NRAO Designed Receiver Control

NRAO Design Receiver Control VxWorks VME Computer

NRAO Design Receiver Control Card Cage

NRAO Design Receiver Control Card Cage Computer Connections

NRAO Design Receiver Control Card Cage Hardware Connections

“JT” Design Receiver Control

“JT” Control Design ◊Based on the NRAO Design Separate Computer and Card Cage ◊Used Complete Linux Embedded System PC104 I/O Cards ◊Active File System Powering Off Caused Problems ◊11 Processes Running in System ◊Required UPS Backup System ◊X11 User Interface can run on any Local host ◊Based on the NRAO Design Separate Computer and Card Cage ◊Used Complete Linux Embedded System PC104 I/O Cards ◊Active File System Powering Off Caused Problems ◊11 Processes Running in System ◊Required UPS Backup System ◊X11 User Interface can run on any Local host

“JT” Receiver Design Embedded Linux Computer

“JT” Receiver Design Connections

“JT” 230 GHz Installation

Latest Receiver Control Design

New Integrated Design ◊Custom Embedded Controller Cards ◊No Active File-System ◊Only 2 Processes on Host Computer Serial Comm Task Interface Daemon ◊Share a Common Global Memory ◊Standardized Design Used in the 345 & Future 650 and 950 GHz Systems. Plans to retrofit 230 GHz “JT” system ◊Custom Embedded Controller Cards ◊No Active File-System ◊Only 2 Processes on Host Computer Serial Comm Task Interface Daemon ◊Share a Common Global Memory ◊Standardized Design Used in the 345 & Future 650 and 950 GHz Systems. Plans to retrofit 230 GHz “JT” system

Fully Integrated Card Cage System (345 GHz System Front View)

Fully Integrated Card Cage System (Block Diagram)

Fully Integrated Card Cage System (Analog - Digital I/O Card)

Fully Integrated Card Cage System (Serial Card)

Fully Integrated Card Cage System (Rear View)

User Tuning Interface GUI

For Further Information: ◊ARO Web Site: ◊ARO Web Site: