PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

Software Quality Assurance Plan
Roadmap for Sourcing Decision Review Board (DRB)
Ch-2 Proposals and Contracts. Introduction Many issues have to be handled in a contract and a proposal including legal concerns, commercial arrangements.
Chapter 2 Analyzing the Business Case.
1 Requirements and the Software Lifecycle The traditional software process models Waterfall model Spiral model The iterative approach Chapter 3.
More CMM Part Two : Details.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
Government Services How to Respond to a Request for Proposal (RFP) 2006.
Chapter 3 Project Initiation
System Analysis and Design
The System Development Life Cycle
Writing winning proposals. Why write proposals? Work in industry and business is done through proposals The process: ▫Requests for Proposals (RFPs) identify.
Chapter 6. Explain the process a HCO generally goes through in selecting a HCIS. Describe the SDLC and its four major stages. Discuss the various stages.
Project Management.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Systems Analysis and Design 9th Edition
Chapter 2.
What is a project? Project Management Institute definition
Fundamentals of Information Systems, Second Edition
Analyzing the Business Case
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Release & Deployment ITIL Version 3
Documenting Network Design
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
9 Closing the Project Teaching Strategies
Chapter 1 Project Management Concepts
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Chapter 1 Project Management Concepts. 22 Learning Objectives Definition of a project and its attributes Key constraints within which a project must be.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Computers Are Your Future © 2006 Prentice Hall, Inc.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Chapter 10 Information Systems Analysis and Design
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Welcome to Session 3 – Project Management Process Overview
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
Computers Are Your Future © 2008 Prentice Hall, Inc.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Chapter 1 Project Management Concepts
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Software Engineering Lecture # 1.
Define Research Problem. 2 Management objectives: –To solve current problem facing company –To improve efficiency –To plan for future Current problems.
What is project management?
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Systems Analysis & Design 7 th Edition Chapter 2.
Fall CS-EE 480 Lillevik 480f06-l4 University of Portland School of Engineering Senior Design Lecture 4 Definition phase Design phase.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 8 Moving from Analysis to Design Design Strategies.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Fundamentals of Information Systems, Sixth Edition
Chapter 3 Managing the Information Systems Project
Chapter 4 Systems Planning and Selection
Nada Al Dosary Edited By: Maysoon AlDuwais
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Chapter 2 Managing the Information Systems Project
Presentation transcript:

PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT

Topics Covered  Project Life Cycle  Project Phase Activities  Request for Proposal (RFP)  Proposal  Recommended Proposal Format 2

PROJECT LIFE CYCLE 3 A project is by definition a temporary endeavor, which means it has its own life cycle.

StepsTwo (Generic) PhasesFour (Generic) StagesFive to Ten or More (Industry Specific) TasksMany (Project Specific) 4 Macro view Micro view Generic means applicable to any sort of project Micro and Macro Views

5 Project Steps The PM process, over the course of this life cycle, can be grouped into two sequential yet overlapping steps 1. Planning 2. Accomplishment

6 Project Phases The sequential steps can be further broken down into four distinct phases in time through which any project passes. 1. Concept 2. Development 3. Implementation 4. Termination

PROJECT PHASE ACTIVITIES 7 Concept Phase The concept phase is when a need is identified and background data are collected. At this point in a project, there is an attempt to determine if a problem exists. Goals and objectives are developed during this phase, and initial plans are developed as well. Some field work can be done in this phase i.e. data collection, market surveys

8 Important Note: It should be noted that the project can be terminated within this or any other phase of the project. For instance, an environmental project could be terminated at the concept phase because contamination was not found at the site.

9 Development Phase In development phase more detailed planning occurs. By this point, the problem has been identified and a need has been established. The question at this point is: What is the best manner to go about solving this problem or satisfying our need? Economic studies are often performed in this phase, as well as an evaluation of alternatives. Detailed design will also be performed in this phase.

10 Implementation Phase Construction activities often occur and the detailed design plans are implemented in this phase.

11 Termination Phase The termination phase is the point where the results of the project are documented, resources are released, and responsibility for the newly developed product is transferred. For example, if the project were to build a new chemical manufacturing plant, it is at the termination phase that the plant would be placed in the hands of the new operators.

12 Project Stages and Tasks In practice, on most projects, the four phases need to be broken down into greater detail. Each phase can be broken into a number of stages and further broken down into tasks.

Request For Proposal (RFP) A request for proposal (RFP) is a document that an organization posts to obtain bids from potential vendors for a product or service. For example, a new business or a business moving from a paper-based system to a computer-based system might request proposals for all the hardware, software, and user training required to establish and integrate the new system into the organization. 13

RFP Response Time The Typical Response time allotted in most RFPs is two weeks. This is relatively a short amount of time when one considers the significant amount of work that must be accomplished. 14

Within the RFP response time:  The information in the RFP must be fully understood  A strategic approach must be developed and estimated (schedule and cost)  The approach must be clearly articulated (expressed)  A sales theme must be woven throughout the text of the proposal 15

Importance of Proposal A proposal is a major tool by which a service company secures new business. A Successful proposal meets two primary criteria: 1) The proposal is approved by the customer’s review process 2) The proposal is executable as specified 16

Proposal is a Project Developing a proposal is a project in itself. This idea can clearly be seen by the definition of a project. Developing a proposal involves the completion of a series of tasks which have their objective the submission of a successful proposal. There is a defined scope of work for the completion of the proposal, which involves determining the technical approach, developing a work breakdown structure, designing a network schedule, estimating costs, and the actual writing of the proposal. 17

These tasks must occur within a schedule for completion as defined by the RFP. There is a definite cost for preparing a proposal, such as the base salary of the personnel working on the proposal and the cost of the materials, equipment and subcontractors. Although many companies neglect to consider the cost of proposal preparation, prudence requires developing a budget for proposal preparation and tracking preparation costs. Finally, resources are required for completion of a proposal, many of which are limited. 18

Proposal Cost A general rule of thumb is that the cost to prepare a proposal should not be more than 10% of the estimated gross cost of a project. (cost refers to the amount that will be incurred by the service company in completing the project, not the price the customer will be charged) 19

Recommended Proposal Format The recommended proposal format is as follows: 1. Introduction 2. Background information 3. Objectives 4. Technical approach 5. Scope of work 6. Project team and related experience 7. Schedule 8. Costs 9. Assumptions and terms and conditions NOTE: The proposal format should reflect both project criteria and the project planning and control cycle. 20

1. Introduction The introduction is used to briefly describe the events that led up to the submission of the proposal, as well as to introduce the service company. 2. Background Information The background information provides the opportunity for the service company to demonstrate its understanding of the project. Additionally this section should call out any gaps in data that will need to be addressed by the detailed scope of work, enabling cost effective completion of the project. 21

3. Objectives This section is used to restate the objectives as identified by the customer and more importantly, to state the long and short term objectives for the project as identified by the company. 4. Technical Approach The technical approach presents the basic strategy that has been developed in order to meet the objectives. 22

5. Scope of Work The scope of work provides a discussion of the details of how the technical approach will be implemented. 6. Project Team This section provides the company with the opportunity to introduce the selected personnel and their experience on related projects. 23

7. Schedule The schedule section of the proposal should present the duration of the project and various tasks, while showing how these tasks are linked and interdependent. 8. Cost This section should illustrate the cost of the various tasks, the cost of the project as a whole, and the cumulative cost over time curve. 24

9. Assumptions and Terms and Conditions Provide the boundaries for the project scope of work. This section tightens up the details of the scope of work and, if well written, protects both the company and the customer. Note that the assumptions are typically developed and recorded throughout the planning of the project, whereas the terms and conditions are often based on company policy. 25

In this section care should be taken to inform the customer that the assumptions and terms and conditions are based on the project scope. If new information gained during execution of the project, indicates that an assumption as invalid or a change in terms and conditions is required, the project scope of work will be affected, thereby making a change order necessary. 26

RFP vs Tender Notice 27 An RFP is used when the purchaser is looking for the best value solution to resolve a problem or to deliver a good or service, but is not exactly sure how to achieve it. A tender notice is used when the purchaser knows exactly what good or service they want and is looking for the best price to deliver it. A tender is an offer to do work or supply goods at a fixed price.

28