Proposed Generation Expansion Process For Review and Discussion March 1, 2011.

Slides:



Advertisements
Similar presentations
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
Advertisements

Software Analysis Tools
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
GPA Renewable Energy Resource for Guam Power Authority
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Technical Conference Avoided Cost Modeling January 6, 2015.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Least Cost System Operation: Economic Dispatch 1
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Production Cost Model Fundamentals
Avoided Costs of Generation
Estonian energy scenarios The first Balmorel model runs.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Network Customer Meeting Access Metric Update November 16, 2006.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1 ERCOT 2007 Strategic Financial Plan & Budget Proposal _____________________ Board of Directors November 14, 2006.
Cork June Dynamic modelling of transmission systems: costs of seasonal-zonal transmission loss factor charging and the impact of large-scale offshore.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
1 WMS Report TO TAC April 2007 (which is in March)
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla,
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
“Other” Cost Estimates
Status Update for Reliability/Market Power Mitigation Assessment
GENESYS Redevelopment Strawman Proposal
Calculation of Payments for Renewable Energy Systems
Status Update for Reliability/Market Power Mitigation Assessment
penetration of wind power
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Security of supply - deriving a winter energy standard using the DOASA model EPOC Winter Workshop September 2018.
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Software Analysis Tools
Presentation transcript:

Proposed Generation Expansion Process For Review and Discussion March 1, 2011

2 Agenda Goal of Generation Expansion Process Overview of Process Details of Iterative Process Next Steps March 1, 2011

3 Goal To create a market-like expansion plan through 2030 When evaluating transmission needs through 2030, we will need additional generation to serve forecasted loads Intent is to select generation technologies consistent with what the market would be likely to develop, given specific conditions in each scenario March 1, 2011

4 Overview of Process March 1, 2011 Base Case Generation Add increment of renewable capacity Run Promod Evaluate Promod Results Run MP Insert MP expansion into Promod Insert Adjusted load shape into MarketPower (MP) Run MP Re-run Promod Add/Subtract increment renewable capacity Finalize Promod Expansion Plan Transmission Evaluation Generation Siting Pass Fail After Year +20 run and Pass Fail Repeated Every 3 Years

5 Starting Case Information Latest load forecast developed by the load forecasting group Existing generation as listed in the 2010 CDR Winter Update –For discussion: Two potential options for future units that currently have signed Interconnection Agreements Include all units with signed Interconnection Agreements as of March 1, 2011 Do not include any units with signed Interconnection Agreements – let expansion process evaluate all future units March 1, 2011

6 Iterative Process Using Promod and MarketPower together –Use strengths of both software packages to develop a generation expansion plan for each scenario –MarketPower is fast and evaluates multiple dispatchable technologies at the same time. MarketPower does not evaluate hours in chonological order. –Promod evaluates system commitment and dispatch across all hours - it maintains chronology of hourly patterns and provides unit-specific output data Promod will be run without transmission topology to see market-wide opportunities March 1, 2011

7 How Does MarketPower Work? Compares existing (base case generation) resources to peak load on an annual basis Evaluates technologies on a financial basis to determine its viability in the market –The equations for this calculation is listed in the appendix MarketPower will build a unit if the unit will operate at or above its calculated minimum capacity requirement when compared to an Advanced Combustion Turbine unit. Unit operations are based on estimates of market prices. March 1, 2011

8 What Information Does the Model Use? Created generic categories for each technology Generic operating and financial characteristics –Heat rate –Min up and down times –O&M costs –Capital costs –Capacity –Etc. The financial characteristics may change by scenario March 1, 2011

9 Promod Run to Evaluate Renewables with Diurnal Pattern Begin with Year + 3 (2014) –Insert an initial increment of renewable capacity into Promod Evaluate all potential renewable technologies –Run Promod for Year + 3 Evaluate model results using financial criteria –Marginal generator revenue »Also review avg. system production cost savings per MWh –Others If units are profitable (i.e., revenue stream supports adequate IRR), add a second increment of capacity If units are not profitable, decrease initial increment of capacity and re-run Promod Continue the Promod runs at Year + 3 until a final capacity for each renewable technology has been determined March 1, 2011

10 Using Promod Results in MarketPower Adjust forecasted load shape to reflect net load with the renewable expansion units from Promod runs –Insert new load shape into MarketPower –Run MarketPower for Year + 3 through Year + 20 –Take MarketPower expansion plan from Year + 3 to Year + 6 and insert into Promod March 1, 2011

11 Iterative Process Contd. Run Promod at Year + 6 –Includes Promod renewable expansion plan from Year + 3 and MarketPower thermal expansion plan from Year + 3 through Year +6 –Evaluate existing and expansion plan units using financial criteria Candidacy for mothball status will be assessed using operating hours, capacity factor, number of starts, etc. A mothballed unit will have the ability to be restarted within succeeding MarketPower analysis –Begin adding initial increment of renewable capacity at Year + 6 –Repeat process 3 year increments Until final expansion plan through Year +20 has been developed March 1, 2011

12 Next Steps Generation Expansion plan will go through the generation siting process –Dispatchable siting will use geographic databases Develop lists of acceptable siting locations by fuel by county Rank these buses by LMP’s Site based on LMP rankings –Renewable siting will evaluate both capacity factors and LMP’s Proceed with transmission evaluation –Existing and expansion units will be reassessed during the transmission evaluation process Financial criteria developed during generation expansion plan Candidacy for mothball status Re-evaluate expansion plan if unserved energy is not able to be solved with transmission projects March 1, 2011

13 Results This process will be repeated for each scenario Plan is to provide expansion results for BAU scenario at April LTSTF meeting –Capacity additions by prototype for each year –Reserve margin by year –Etc. March 1, 2011

14 QUESTIONS??? March 1, 2011

15 Appendix: MarketPower Build Decision Calculations March 1, 2011 Total Fixed t = Capital t + Fixed t Total Energy t = Fuel t + Variable t Avg Fixed t = Total Fixed t / Generation t Avg Variable t = Total Energy t / Generation t (Avg Fixed 1 – Avg Fixed 2 ) / (Avg Var 1 –Avg Var 2 ) = %

16 Generic Generating Resource Assumptions (2010$) Operating characteristics for existing generating resources March 1, 2011

17 Generic Generating Resource Assumptions (2010$) Operating characteristics for new generating resources March 1, 2011