Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.

Slides:



Advertisements
Similar presentations
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Advertisements

Bid Bonds 23 January What is a Bid Bond? Stepping stone to full performance bond (or letters of credit). Value is based on cost of running the.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Transfer & Trades Special Transmission Workstream
Review Group 0221: User Commitment Best Practise guidelines for Gas and Electricity Network Operators Credit Cover (2005)
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Classification: Statoil Internal Status: Draft Mod 156/156a Questions regarding the proposals…
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Review Group 221: Security provision timing options and other supporting info.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Industry Dialogue on xoserve Services 14 th September 2007.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Shipper Termination Rules
Exit Capacity User Commitment – Transmission Workstream update
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Transmission Workgroup June 7th 2012
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
QSEC auction timetable
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Further Credit Modification Proposals
Optimisation of Entry Capacity Modification Proposal
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Modification 0043 – Limitation on offering for sale unsold capacity
Review Group Action November 2008.
Presentation transcript:

Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley

2 Modification Proposal 0246: Entry Capacity User Commitment – “The Concept” Long Term Entry Capacity Car Value - £1.3bnValue - £40,000 Security - £?Deposit - £1000

3 Timeline  RG221 was established in September 2008  Main questions:  Is the balance of investment risk right between existing and new shippers and National Grid NTS?  How do you mitigate the risk of “default”*.  Modification Proposal 0246 to the UNC Panel in March  Aim is to put new arrangements in place prior to the next Long Term Entry Capacity Auction (QSEC)  Ofgem Impact Assessment is highly likely. * “default” = payment for allocated capacity is not received at the time expected

4 Issues discussed by Review Group  Currently no security required at time of long term capacity auction.  Security called for 12 months prior to the start date of the entry capacity – potentially long after system investment made.  User currently able to defer capacity commitments 12 months prior to use and keep deferring without penalty.  Incremental Capacity auction allocations lead to fixed additional allowed revenue to National Grid.  If a User “defaults” = Allowed revenue shortfall is recovered through wider Transportation charges

5 Proposal – General terms agreed  Provision of security  To cover auction allocations – inc. past auctions  Amount of security – sufficient to deter speculative auction bidding  Aspiration for annual cost of security to be proportionate to the risk to the Shipper Community of a User Default  Security tools  Only Letter of Credit (LoC) or deposit allowed.  Default rules  Y2 to Y16 Entry Capacity at all ASEPs is withdrawn from User and User incurs cancellation fee equivalent to security provided by that User

6 Allocated Capacity Value (ACV) – Options considered

7 Entry Capacity Risk Assessment  ACV = Years Y2 to Y16 * [0.1]  Modification 0246 proposes that the ACV derived will be further reduced depending on the Users credit rating risk (between 30% and 100% of the ACV)  User Security Value (USV) = ACV * UCR + VAT  During legal drafting for Mod 0246 concerns have been raised by our Legal representatives  Charging a different cancellation fee when cancelling the same quantity of capacity, could be considered as unduly discriminatory  We propose to remove UCR  User Security Value (USV) = ACV + VAT

8 Barrier to Entry ‘vs’ Community Risk Proposal seeks to strike a balance  LoC costs to cover aggregate USV estimated at around £4m per annum  Risk of a project or major User failure has been estimated at ~£20m per year – this figure is based on current levels of capacity holdings and not historic defaults  Views are sought on whether an appropriate balance has been met, i.e. should the 10% ACV figure be amended or not?

9 Security Tools and Operating Costs For the purposes of long term entry capacity, only the following types of security shall apply : “ Deposit Deed” “Letter of Credit” Note: Users with poor credit ratings may choose to use a deposit deed as a cheaper option

10 Security Required – Across Users

11 When should security be put in place? – Options Considered

12 Options - Pros and Cons  No consensus reached  Option One – 14 days before auction proposed within Mod 0246  Option Three - Post auction favoured by some Review Group Members AdvantagesDisadvantages Option 1 No impact on current auction processes or timetables Removes unsecured bids prior to allocation. Involves estimating the value of your successful auction bids Potential barrier to entry for smaller developers due to financing difficulties Option 3Provisional Allocations known before security is called for Aligns better with project financing processes. “default” = Potential effect on other bidders at multi user ASEPs

13 QSEC – Bid Window Amendment  Issues identified with removing a Users bids prior to allocation (option 1) - potential effect on other bidders at multi user ASEPs Current QSEC Bid window:  Opens at 08:00 and closes at 17:00. Bid Windows must be held between 1st Sept - 30th Sept.  Open for 10 consecutive Business Days (stability can be met from day 2 and auction closes early).  The bid window closes 17:00 and auction information is sent to Users by 20:00 on each day  Now proposing that we check the security after each bid window and remove any bids where the USV > security provided.  This will require us to amend the QSEC auction to have a day between each bid window and reduce the number of windows to 8.

14 Example of a User’s Security Value QSEC ACV = Years Y2 to Y16 * [0.1]

15 Example of a User’s Security Value QSEC ACV = Years Y2 to Y16 * [0.1]

16 Default Rules  Long term entry capacity “events of default” will be:  Security < USV  The security tool (LOC/Bank Deed) is about to expire (less than 28 days).  The User is Terminated (UNC Section V4) for other reasons under UNC.

17 Default Rules - process  User will be notified and given 10 business days to rectify (except where Termination is for other reasons under UNC).  If not rectified: Invoice will be raised for the Secured amount (cancellation fee) NG will call on the USV pending payment of the above invoice. The User loses the right to acquire entry capacity NG will re-call the User’s QSEC capacity at all entry points across all years (Y2 – Y16). NG offer Capacity to trading party (UNC B5.4) NG will resell the capacity in subsequent auctions