CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Radiopharmaceutical Production
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Trimble  Quantm  Haul Road Optimization Presenters Name.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
What is a project? Project Management Institute definition
ABET 1 SAYS - Your Senior Design Course Should Include Engineering design is the process of devising a system, component, or process to meet desired needs.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Tom & Cindy’s Home 3915 West 89 th Street, Prairie Village, KS Project Purpose: To irrigate extensive landscape and provide irrigation for a large open.
Safety and Health Programs
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
The Importance of the Qualifications Based Selection (QBS) Process
Server Virtualization: Navy Network Operations Centers
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
Industrial Engineering Roles In Industry
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
BUSINESS PLUG-IN B15 Project Management.
Capital Project Process
Tom MAZOUR IAEA, Division of Nuclear Power
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
OSHA Office of Training and Education1 Safety and Health Programs.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Historical Aspects Origin of software engineering –NATO study group coined the term in 1967 Software crisis –Low quality, schedule delay, and cost overrun.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Systems Analysis and Design in a Changing World, Fourth Edition
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Process of Planning, Designing and Financing a Hospital
Contractor Alternate Design Serving the Public’s Best Interest.
Quality Management Theory Terms, Concepts, & Principles.
US Army Corps of Engineers BUILDING STRONG ® Greg Mellema Hydropower Master Plan (HMP) Operations Division Omaha District 08 Dec 2015.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Project Budget Review _ Control Developed by: Daniel J. Renna 3/16/20161.
Office of Major Project Development (OMPD) Overview November 2015.
INTRODUCTION Mehmet Sait Andaç Web: Office: 431.
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
TD Government Solutions
TD Government Solutions
Fort Stanwix National Monument Energy Audit Contract
Systems Analysis and Design in a Changing World, 4th Edition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Civic Center Sports Field Study Session & Quarterly Update
Project Management.
Enterprise Content Management Owners Representative Contract Approval
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Management Breakout: MREFC Budget Summary Victor L
Lockheed Martin Canada’s SMB Mentoring Program
Manajemen Konstruksi Project Life Cycle
Controlling Project Cost and Schedule
Anatomy of a Project A project has a beginning and an end.
Competency: Create site plan drawings
SOFTWARE PROJECT MANAGEMENT KEY TOPICS
Directed Change Constructive Change
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

CENE 386 Engineering Design: The Methods

Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the project –Anticipate constraints, standards, working relationships –Research - become knowledgeable about that type of project Don’t judge the information (yet) Requirements capture –Use checklists (memory aid) –Many other tools & techniques available

CENE 386 Engineering Design: The Methods Problem Definition Checklists “The direction of the engineering effort is totally dependent on the project’s scope definition…engineering organizations should develop checklists for use in extracting needed scope information and design criteria from owners.” taken from the Manual for Special Project Management by The Construction Industry Institute Publication

CENE 386 Engineering Design: The Methods Generic Questions for Problem Definition How big is the problem? What is distinct about the problem? What makes this a problem? What events caused this problem? How long has it existed? Why is it a problem? How did the problem get started? Who has been involved? In what way and why? Where is it located? Does the problem pose a threat to people, the community, the organization? In what way? Does the problem have long-term or only short-term effects? How complex is the problem? How are the different aspects related? Can some factors be handled separately? Adapted from E. Lumsdaine & M. Lumsdaine, Creative Problem Solving

CENE 386 Engineering Design: The Methods Specific Problem Definition Checklist General conditions –summary of work owner obligations working relationship between all project people authority and responsibility of engineer project description contradictions –allowances extension for time delays tolerances changed conditions (unforseen conditions)

CENE 386 Engineering Design: The Methods Problem Definition Checklist General conditions –fully defined scope of work pre-design, design, construction? –measurement and payment –field engineering services –regulatory requirements –special project procedures –project meetings –submittals/deliverables –quality control

CENE 386 Engineering Design: The Methods Problem Definition Checklist General conditions –materials and equipment –commissioning –contract closeout contract termination rights final payment –maintenance –temporary facilities and controls

CENE 386 Engineering Design: The Methods Problem Definition Checklists Sitework –subsurface investigations –topographic surveys –property boundaries –unusual/special features –site preparations –site improvements –landscaping

CENE 386 Engineering Design: The Methods Proposal phase planning –define the problem through strategic planning goals, objectives, criteria –develop alternative preliminary design solutions –select a design concept –scope out the work anticipate staffing build a design schedule estimate your budget –identify what you will deliver –contract negotiations

CENE 386 Engineering Design: The Methods Strategic Planning Establish design goals –state what the system (design) is to accomplish –how other systems and the environment will affect the project –generalized, brief statements “Design a branch post-office building with 100 employees that is to be constructed on a site owned by the client. The building should harmonize with neighboring structures. Design must be completed within 90 days and construction within 1 year. Construction cost is not to exceed $500,000.” taken from Merritt, Loftin, & Ricketts, Standard handbook for Civil Engineers

CENE 386 Engineering Design: The Methods Strategic Planning Objectives –Provide the details –What the system must satisfy to meet the goals –Should include constraints and applicable standards –In example: Minimize fire exposure Minimize life-cycle costs Maintain quality design

CENE 386 Engineering Design: The Methods Strategic Planning Establish criteria –At least on criterion per objective –A range of values that the performance must lie to insure that the objective is met. –In example: minimize fire exposure - use 2-hr rated building systems maintain quality design - conform to the 1997 UBC

CENE 386 Engineering Design: The Methods Seba Dalkai School Reconstruction A Quest for Tradition

CENE 386 Engineering Design: The Methods Background Located on Navajo Reservation north of Winslow BIA school, K-12 Board is on-track to reconstruct with traditional values & elements incorporated Full Design Approval and Funding Will be competing for BIA construction $

CENE 386 Engineering Design: The Methods Master Plan Demolish and rebuild –save traditional structures –utilized main building as museum/community center –new classrooms, dorm, 7 residential housing Traditional Elements (examples) –circular design –east main entrance

CENE 386 Engineering Design: The Methods Master Plan Additional Elements –reintroduce indigenous plants –sustainability energy efficient water reuse –multiple land uses (examples) instructional agricultural spiritual

CENE 386 Engineering Design: The Methods Project Concept: Integrated Water System Design and cost feasibility Optimization of available water resources Simple to operate and maintain Safe Reliable Complies with applicable codes/regulations

CENE 386 Engineering Design: The Methods A Discussion Preliminary Project Definition. A Discussion What is an integrated water system? What are its elements of design? What determines its feasibility? –Cost feasibility –Design feasibility What information is needed to design it?