CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Master Plan. Citizens’ Health Care Working Group Master Plan November 2005.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Update on the SKA R. T. Schilizzi AA 13 December 2011.
Update on the SKA R. T. Schilizzi East-Asia SKA Workshop 30 November 2011.
Project Kick-off 14-Jan-09.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
ATUC, Marsfield Phil Diamond, Chief of Division 28 June 2011 CSIRO Astronomy and Space Science ATNF: Director’s Update.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Social Inclusion by Proactive Design InclusiveByDesign Second project meeting June 2001 Florence, Italy.
Work Package 6: Performance Specification Ian McCrea.
Server Virtualization: Navy Network Operations Centers
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Work breakdown structure
1 | CSIRO ASKAP Science Data Archive (CASDA) – Stage 0 Project Intent Statement Confirm the necessary requirements, use cases, workflows, business processes,
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
An Integrated Project under EU 6th Framework Programme Kick-off meeting, Hamburg September 2004 Chris Hewitt, Met Office Hadley Centre, UK
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Contracting Process Overview Agenda Item #12 July 2007.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Power of Choice (PoC) Program Overview
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Preparation of the Self-Study and Documentation
WGARM Appraisal Decision Assistance Phase 1, Dec. 2002
Development and Energy in Africa
Global Standards Collaboration (GSC) GSC-15
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
TTC Activities on IPR in Standards
PROGRAM CONSULTATIVE FORUM Meeting pack
PM view of SAFe SAFe Construction Planning Workshop A J Casson
Francesco Forti University and INFN, Pisa
Enterprise Content Management Owners Representative Contract Approval
WGARM Appraisal Decision Assistance Phase 1, Dec. 2002
DIISR and the Pre-construction Phase October 2011
IEEE IMT-Advanced Review Process
<month year> doc.: IEEE ptc November 2012
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Greater Kaweah GSA Board Meeting
CoDR Scope Definition, Objectives & Agenda Jodrell Bank
Preliminary Project Execution Plan
Presentation transcript:

CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?

Outcomes from recent SKA Founding Board Met at LHR on 29 September FB appointments: Michiel van Haarlem (ASTRON) Exec Officer until legal entity est. Select Interim Director by 1 November Proceed with appointment of D-G, but will not appoint until after site decision Site Selection Advisory Cmte: Evaluation plan approved Legal Entity: Incorporation by mid-November 2011 Members, at minimum: UK, NL, IT, AU, NZ, RSA, CA, China Resourcing: Committed cash for SPO < required (16.6MEuro vs. 27.5MEuro) Enough for Year 1 plan Work on basis others will join and funding will ramp up Business Plan group draft a revised plan to reflect expected growth in membership

Outcomes from recent SKA Founding Board SPO Building: To be located at Jodrell Bank Planning application to be submitted on 14 Oct Contractor appointed by 31 Jan 2012

CSIRO: PEP PEP Overview Work PackageDescription 1Management (€16.8m) 2Science (€1.3m) 3System Design (€2.3m) 4Maintenance and Support (€0.3m) 5Dish Arrays (€15.3m) 6Aperture Arrays (€22.7m) 7Signal Transport & Networks (€3.7m) 8Central Signal Processing (€11.9m) 9Software & Computing (€11.3m) 10Power (€2.8m) 11Site engineering and site office (€2.5m)

Stage 1 engineering work in the Pre- Construction Phase SPDO FB meeting, 29 September 2011

Context for Pre-Construction Phase PEP Stage 1 PEP Stage 2

Stage 1: System and Element Work in Technical Requirements Stage 2 Detailed Work Breakdown Structure Stage 1 Element Work Finish CoDRs SR R System level Stage 1 Stage 2 Work Package definition and contracting Planning Element SRR Science Requirements Planning RFP Bid Contract Element level Stage 1 Apr12 Q4/ SPDO/SPO WPCs

Conceptual Design Reviews in 2011  Feb System delta-CoDR on SKA 1  Apr Signal Processing  Apr Aperture Arrays  Jun Signal Transport & Networks  July Dish and Dish Arrays  2-3 Feb CoDR Dish Verification Antenna #1  5-7 Oct PDR Dish Verification Antenna #1  9-11 Nov Monitor & Control  Dec Software & Computing

Allocation of Requirements from System to Element level Pre-Stage 1 Apr/12 System RR Element SRR Q4/12 (resource dependent) 1st allocation is science requirements, operations requirements (Instrument Requirements Review). Later allocations are extensibility requirements and non-functional requirements. System Level (SPDO/SPO) Element Level (WPCs) 1 2

WPC Element Work in Analysis of CoDRs Element SRR Planning CoDR => SRR Work (See next slide) Allocated Requirements Stage 1 Pre-Stage 1 Verificatio n Work Element Requirements, WBS Development and Design studies

Assembling Element Level RFPs for Stage 1 Work SoWs Pre-Stage 1 Planning Element 1 CoDR-SRR Work Planning Element 2 CoDR-SRR Work Planning Element N CoDR-SRR Work RFPsBid Define Top-level WBS Develop Stage 1 Legal, Bid Policy, T&C Contract Templates Stage 1 Element Contracts Nov/11 Apr/12 Assemble Work Package Contractor Consortia

Pre-Stage 1 : Planning Element CoDR-SRR Work  Purpose of Work o Planning next phase – to Element SRR  What needs to be done?  Which options are to be carried forward?  How much effort?  How much time?  What is the outcome to be presented at the SRR? o Preparation of Statement of Work to reach SRR.  Contract Phases and Milestones o Familiarisation with tasks and inputs o Analysis of input data, identify gaps o 1 st draft plan o Presentation and review o Decisions on how to handle gaps and missing information o Finalize plan o Final presentation, review and delivery.  Deliverables o Reports  Scope of requirements analysis for the element level.  Consolidation and recommendation of viable technical options  Architecture documents for viable options.  Outline of work to be done on requirements, and other items identified in the SEMP for the SRR level.  Identification of resources and time to complete actual work to SRR.  Preliminary estimate of work needed to complete detailed design.  Review of gaps or missing information needed to proceed. o Prepared Statement of Work for the period up to SRR.

Assembling Element Level RFPs for Stage 1 Work SoWs Pre-Stage 1 Planning Element 1 CoDR-SRR Work Planning Element 2 CoDR-SRR Work Planning Element N CoDR-SRR Work RFPsBid Define Top-level WBS Develop Stage 1 Legal, Bid Policy, T&C Contract Templates Stage 1 Element Contracts Nov/11 Apr/12 Assemble Work Package Contractor Consortia

Assembling Element Level RFPs for Stage 1 Work SoWs Pre-Stage 1 Planning Element 1 CoDR-SRR Work Planning Element 2 CoDR-SRR Work Planning Element N CoDR-SRR Work RFPsBid Define Top-level WBS Develop Stage 1 Legal, Bid Policy, T&C Contract Templates Stage 1 Element Contracts Nov/11 Apr/12 Assemble Work Package Contractor Consortia

Resources for Planning, Requirements Development, WBS, Stage 1 work  Pre-Stage 1 Planning (Nov11-Apr12)  Assuming 5-8 Elements  3 people/element from PrepSKA Lead Institutes => persons for 5 months ( PMs)  SPDO/SPO Domain specialists at 30% (5 persons) (8 PMs)  System Requirements Development (Nov11-Oct12)  SPO Domain specialists at 30% (5 people) (20 PMs)  Three additional System Engineers at SPO, assumed available immediately (36 PMs)  SPDO/SPO will need TBD assistance with specific tasks during the SRR preparation  Element level Requirements Development (Apr12-Mar13, PEP Table 2)  WPC s: 15 FTE/ WP on average (total: 90 FTEs)

Where are we, and what are we trying to achieve? Still at planning stages SPDO/SPO plan for process is solidifying Method of interaction with SPDO/SPO not yet established Key triggers: Appointment of Interim Director Possibly allows formation of consortia Site decision: Releases funding D-G appointed We establish a model for Australian participation We talk to international partners about the formation of potential consortia We be ready to go as soon as possible.

Contact Us Phone: or Web: Thank you CSIRO Astronomy and Space Science Philip Diamond Chief Phone: Web: