MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Advertisements

Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Controls and Monitoring Implementation Plan J. Leaver 03/06/2009.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
1 Configuration Database Review David Forrest University of Glasgow RAL :: 1 st June 2009.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
MICE Online Linda R. Coney UCR MICE CM30 Oxford July 2011.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
Controls and Monitoring Status Update J. Leaver 29/05/2009.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
Imperial College Tracker Slow Control & Monitoring.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
1.Overview 2. Hardware 3. Software Interface 4. Triggering 5. Installation 6. Configuring.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
Offline Software Summary 1M.Ellis - CM25 - 6th November 2009  Release Schedule  Simulation and Analysis Update  Detector software: u CKOV u EMR u KL.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CMPB Alain Blondel 1 Highlights on MICE.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Controls & Monitoring Status Update J. Leaver 05/11/2009.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
1 Configuration Database David Forrest University of Glasgow RAL :: 31 May 2009.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Jean-Sebastien Graulich, Geneva
Database High-Level Overview
Controls & Monitoring in MICE
Presentation transcript:

MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary of the summary Jean-Sebastien Graulich, Geneva

MICE CM June 2009Jean-Sebastien GraulichSlide 2 Achievements since CM23  Network in MLCR redesigned  Target DAQ integrated into Detector DAQ  EPICS Archiver and Alarm Handler implemented  EPICS Client Server installed in MLCR First steps toward Unified Control System First steps toward Unified Control System  Progress in Control and DAQ Interface  Progress in CAM and DAQ Interface with Configuration DataBase  Interface between DAQ and G4MICE improved  Problem with Event building understood

MICE CM June 2009Jean-Sebastien GraulichSlide 3 MLCR Network upgrade   Craig McWaters and Mike Courthold sorted out the chaotic situation   MiceNet: XXX used for both DAQ: > CAM: >   All DAQ machines moved to MiceNet   Structure created for all future machines   Strong safety policy enforced Strong passwords (ask your MOM) Non standard port for ssh No root ssh   + We have now a printer in MLCR !

MICE CM June 2009Jean-Sebastien GraulichSlide 4 EPICS Client / Server Overview

03/06/2016Imperial College 5 Network Status Currently have working prototype –EPICS server connects to PCs via SSH, checks contents of ‘key’ ID file –Client displays status of all PCs, scans at user-specified period (with ‘check now’ override) Need to add service checking & ‘hard’ IOC support Responsible for SystemResponsible for EPICS C&MDate Due Anyone with a PC/IOC in the MLCR/HallJames Leaver (IC)Aug 2009

MICE CM June 2009Jean-Sebastien GraulichSlide 6 CAM/DAQ Special Case:   Target DAQ   Target data is really both CAM and DAQ Double flow is implemented Based on a single I/O software -> No issue with format change   Waiting for the target to be online for final tests   Will require dedicated testing runs

MICE CM June 2009Jean-Sebastien GraulichSlide 7 Archiver and Alarm Handler

MICE CM June 2009Jean-Sebastien GraulichSlide 8 EPICS Client Server Installed   All client-side applications run on miceecserv Central installation repository greatly simplifies configuration/maintenance/backup MOG collates individual applications, applies updates when available from control system ‘owners’   Client control/monitoring GUIs viewed directly on miceecserv, or one of 2 ‘Operator Interface’ PCs OPI PCs act as ‘dumb terminals’, running displays from miceecserv via SSH miceecservmiceopi1miceopi2 EPICS IOC Portable CA Server EPICS IOC Controls Network EPICS server applications EPICS client applications

03/06/2016Imperial College 9 Unified User Interface Large wall-mounted display Alarm Handler Message log Client application launcher 3 Standard desktop monitors Client GUI Connected to miceecserv Connected to miceopi1 Connected to miceopi2

03/06/2016Imperial College 10 C&M Systems Overview

03/06/2016Imperial College 11 Tracker: Spectrometer Solenoids Work currently halted due to budget constraints 3 options –Allow DL to complete project Requires ~£18K capital man years effort –Take DL’s current design & complete within the collaboration Requires ~£18K capital + ~£15.2K vxWorks developer licence man years effort Insufficient MICE manpower available… –Discard DL’s design & start over within the collaboration Unknown capital requirements (likely ~£18K) Requires ~1.5 man years effort Insufficient MICE manpower available… Responsible for SystemResponsible for EPICS C&MDate Due Steve Virostek (LBNL)Adrian Oates; Graham Cox (DL)Possibly Sep 2009

MICE CM June 2009Jean-Sebastien GraulichSlide 12 Detector DAQ Issues   Three priorities were defined in CM23 Limit on Data Size Event Building CAM/DAQ Interface   Limit on Data Size From both DAQ and Monitoring First action on the data size itself ! Simply reducing the number of samples per fADC channel -> factor of ~5 Requires fADC firmware upgrade First attempt failed

MICE CM June 2009Jean-Sebastien GraulichSlide 13 Event building problem   Vassil Verguilov developed software to investigate the problem The Trigger Time Tag and Bunch ID from the TDC can be used to understand what happened   Each TDC records Trigger Time Tag (TTT) 27 bits 800 ns LSB ~ 100 s full range Bunch ID (BID) 12 bits 25 ns LSB ~ 50  s full range Clock running Independently   It is possible to retrieve the absolute time of the particle trigger W.r.t. to board reset (boards not yet synchronized) With some ambiguities… and complications …

MICE CM June 2009Jean-Sebastien GraulichSlide 14 CAM/DAQ Interface   Two ways link EPICS should know the DATE status A summary of EPICS data should be inserted in the online data stream The run should stop automatically when the CAM goes in severe alarm state   Date Status Monitoring James Leaver has provided EPICS Server, EPICS Client,Test Software, Status Display Next step: A small piece of code reading real status from DATE

MICE CM June 2009Jean-Sebastien GraulichSlide 15 CAM data Online   Principle re-discussed CAM data appended at the end of the run file vs CAM data inside the Spill Data   The issue: backward/forward compatibility of data format Solved by James Leaver An XML format description file will be provided and appended to the run file Require some “intelligent” unpacking code   CAM data will be stored Spill by Spill (Took just ~4 years to understand that AB was right…:-)

MICE CM June 2009Jean-Sebastien GraulichSlide 16 Trigger Issues  No modification since last CM  The effect of trigger condition choice on TOF calibration has been clearly understood Flexibility has a huge cost ! Flexibility has a huge cost ! TOF Calibration constants depend on the trigger source TOF Calibration constants depend on the trigger source Do we really need so many trigger conditions ? Do we really need so many trigger conditions ?  Decision on the future of GVA1 It will stay in place at least until Step 2 is complete

MICE CM June 2009Jean-Sebastien GraulichSlide 17 Online Software  Unpacking library has been upgraded New fADC (V1731) for CKOV Some bug fixed  Interface with G4MICE Vassil Verguilov has optimized the Date Reader for both clarity and efficiency Spill structure implemented in G4MICE (for scalar data, number of particle triggers per DAQ event, etc.) David Adey reproduced online histograms with G4MICE. Analysis is under way See Software session for more details  Know issues (No change since CM23) Online monitoring GUI tends to get stalled at the end of a run Need better Online plots for fADC Current plots found not efficient in detecting broken channels

MICE CM June 2009Jean-Sebastien GraulichSlide 18 Front End Electronics  TOF Cabling for TOF TDCs synchronization is finished (Internal clock and trigger distribution). Will need some dedicated beam time for testing TOF2: We miss some electronics. Shapers/Splitters: Production finished. Under evaluation TDC: One board missing FADC: 3 boards missing  EMR: Electron Muon Ranger (aka SW) Prototype being tested by Michela Prest and Erik Valaza

MICE CM June 2009Jean-Sebastien GraulichSlide 19 Schedule Milestones  For DDAQ  Target DAQ included in Detector DAQmid February  DAQ migration to the DAQ/Control networkMarch 06  Installation of the Online Reconstruction FarmMarch 06  Upgrade of fADC firmwareMarch 06 -> July 09  TOF2 Shaper/Splitter Productionmid March need testing  CAM data in Online Data Streamend of April -> June 09  Tracker integrated in DAQ and OLMend of April -> July 09  TOF TDC Clock Synchronizationend of April -> July 09  DAQ review May > June 09  Burst Gate Signal in the Trigger Systemneed beam  Approval of SW/EMR Front End ElectronicsIn Proto phase  Production of SW/EMR Front End ElectronicsSeptember 2009

03/06/2016Imperial College 20 Items Which Require Action! Must find resources within MICE community to complete EPICS C&M systems for –Time of Flight System –Diffuser –Calorimeter system Must resolve issue of funding for DL’s work on the Spectrometer Solenoids PH’s contract expires very soon… –He is essential to success of Online Group –If he is not reemployed, we won’t have: Alarm Handler, Channel Archiver, remote parameter monitoring, C&M systems for CKOV, Focus Coils, Coupling Coils, etc.

MICE CM June 2009Jean-Sebastien GraulichSlide 21 Summary DDAQ  Network in MLCR is under Control  Target DAQ is integrated into online data stream  Interface between DAQ and G4MICE improved  Problem with Event building understood  DAQ review will happen on Thursday June 4 *2009* CAM  Infrastructure design has been re-exanimated  EPICS Client Server installed in MLCR  EPICS Archiver and Alarm Handler implemented First steps toward Unified Control System First steps toward Unified Control System  Progress in Control and DAQ Interface  Man power is critical – we should not let go the rare & precious expertise we have now