Figure 1: 2007 Cape Town Ministerial Summit. Source: GEO Secretariat.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop: Portals Ingo Simonis iGSI
Advertisements

SUGGESTIONS ON A DRAFT FRAMEWORK OUTLINE Presented to the Ad Hoc Inter-governmental Group on Earth Observations Gregory W. Withee U.S. Delegation August.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
ID-06 Building a User-Driven GEOSS Essential Components of User Management for GEO Tasks.
GEOSS Mid-term Evaluation Architecture and Data Committee – March 2010 Yana Gevorgyan GEOSS Evaluation Team.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
IN-05 Gap Analysis Definition Identify and address critical gaps in observational networks that reflect, in particular, the needs of developing countries,
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Overview of the Summary Plan for the First Evaluation of GEOSS Implementation Craig Larlee (Canada) M&E WG Co-Chair Joint meeting of M&E WG and ET January.
GEOSS Monitoring and Evaluation Charles S. Baker (USA) M&E WG Co-Chair Joint meeting of M&E WG and ET January 20, 2010 Geneva, Switzerland 1.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Digital Earth Communities GEOSS Interoperability for Weather Ocean and Water GEOSS Common Infrastructure Evolution Roberto Cossu ESA
The GEO Web Portal New Interface Guido Colangeli.
The IGWCO Transition into GEO August 2007 IGWCO Secretariat 7bis, avenue de la paix CH-1211 Geneva 2.
Chapter Understanding Customer Expectations and Perceptions Through Marketing Research Donna J. Hill, Ph.D. Fall 2000.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
How GEO works  Coordinating activities of Members and Participating Organisations  Supporting the development of capabilities for Observations, Processing.
GEOSS AIP-5 for World Water Online Registry An attempt to Integrate WaterML2 services in GEOSS.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
The Group on Earth Observations (GEO): An Introduction.
McGraw-Hill/Irwin ©2003. The McGraw-Hill Companies. All Rights Reserved Part 2 LISTENING TO CUSTOMER REQUIREMENTS.
McGraw-Hill © 2000 The McGraw-Hill Companies 1 S M S M McGraw-Hill © 2000 The McGraw-Hill Companies Part 2 LISTENING TO CUSTOMER REQUIREMENTS.
GEOSS Midterm Evaluation User Interface Committee – March 2010 John Adamec & Yana Gevorgyan GEOSS Evaluation Team.
Building GEOSS Trying to communicate the vision and a coherent work plan.
D. R. Fraser Taylor, FRSC Distinguished Research Professor Carleton University, Ottawa, Canada Presentation to the OGC Korea Interoperability Day Workshop.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
GEOSS Survey Design Draft John Adamec. Survey Design Schematic Substance Question Sections Sorting Questions Are you familiar with GEO/GEOSS? YN Which,
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
EPA’s Strength in Both GEOSS & ESIP; Environmental Health Decisionmaking January 10, 2008 George Gray, Ph.D. Assistant Administrator EPA Office of Research.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
DA Sensor Web Enablement for In-Situ Observing Network Facilitation.
Group on Earth Observations (GEO) & Global Earth Observation System of Systems (GEOSS) A ten year GEOSS plan ( )
GEOSS Evaluation Task Analysis John Adamec GEOSS ET Meeting, Geneva, Switzerand March 22-25, 2010.
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
GEOSS Mid-Term Evaluation Detailed Framework. Issues with Plan Clear Direction on Scoping Data Issues- Made explicit so as not to raise expectations or.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
Mapping (EGIDA/GEOSS) Stakeholders and STC Road Map Hans-Peter Plag Michael Nyenhuis.
Preparation of the 2010 GEO Ministerial Summit GEO Science and Technology Committee Preparation of the 2010 GEO Ministerial Summit Gilles OLLIER Head of.
Gilles OLLIER Head of Sector “Earth Observation” Management of Natural Resources – RTD.I.4 Research Directorate General - Environment - RTD.I EUROPEAN.
Task ID_01 “Advancing GEOSS Data Sharing Principles” The Group on Earth Observations Data Sharing Activities for 2013 Reported by Lerato Senoko 29 th EXCOM:
3rd STC Meeting, Brussels, 31May – 1June 07 © GEO Secretariat Venue: Cape Town, South Africa Date: November 30th, 2007 The Summit will allow to: Report.
Group on Earth Observations (GEO) & Global Earth Observation System of Systems (GEOSS) A ten year GEOSS plan ( )
Core Task Status, AR Doug Nebert September 22, 2008.
Report of the 6 th GEOSS Evaluation Presentation to GEO-XII 11 November 2015 John Adamec Co-Chair GEO Monitoring & Evaluation Working Group.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-6 prepared by Hans-Peter Plag (IAG/GGOS)‏ Nevada Bureau of Mines and Geology and Seismological.
Science and Technology Roadmap - current progress 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, GEOSS Midterm Evaluation Team GEO Executive.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, Evaluation Team GEO Executive Committee Meeting.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
INTRODUCTION: This report contains the results of the International Council on System Engineering (INCOSE) UML/SySML Team efforts to produce UML/SySML.
GEO’s Need for Non-space Based Observations and the GEO Vision for GD6 Osamu Ochiai GEO Secretariat November 10 Mexico City.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, GEOSS Midterm Evaluation Team GEO Executive.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Work Plan Work Plan Management (Document 21)
GEO Strategic Plan : Implementing GEOSS Douglas Cripe GEO Work Programme Symposium 2-4 May 2016, Geneva.
GCI Architecture GEOSS Information System Meeting 20 September 2013, ESA/ESRIN (Frascati, Italy) M.Albani (ESA), D.Nebert (USGS/FGDC), S.Nativi (CNR)
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Overview of GEOSS Data Sharing Principles and Implementation GEO-XIII Plenary Side Event Towards Open Earth Observation Data Policies Wenbo Chu GEO.
Overview of Documents for Third Earth Observation Summit
Oceans and Society: Blue Planet
GEOSS Web Portal Working Group
Enabling Climate Services – The Group on Earth Observations (GEO) Barbara J. Ryan Director, GEO Secretariat GFCS Dialogue Geneva, Switzerland 01 July.
Links with GEO.
Presentation transcript:

Figure 1: 2007 Cape Town Ministerial Summit. Source: GEO Secretariat

Figure 2: GEOSS works in nine Societal Benefit Areas and five Transverse Areas which support all of the SBAs. Source: Y. Gevorgyan; GEOSS Evaluation Team

Figure 3: A GEOSS logic model would show how the application of resources are expected to bring about change. Monitoring and evaluation test the model and provide feedback for improvement. Source: M. O’Har, Y. Gevorgyan, J. Adamec; GEOSS Evaluation Team

Figure 4: Gaps in GEOSS implementation specified by survey respondents.

a b Figure 5: Overall ratings of implementation progress by (a) key informants and (b) survey respondents.

Figure 6: There are currently 3 pilot portals for accessing the GEOSS architecture. Many respondents identified the GEO Portal as an area in need of improvement. Source: Online GEO Portal pilot pages by ESRI, Compusult, and ESA

Figure 7: Survey respondents’ patterns of use of GEOSS components and standards for Earth observations.

Figure 8: Survey respondents perception of specific impacts from GEOSS. Because GEOSS is still relatively new and impacts are generally “long term” effects, it was expected that many more respondents would have selected “Not at All.”

Figure 9: The prevalence of each task rating category as a percentage of all tasks in the Work Plan at time of rating. The total number and composition of tasks in the work plans varied from year to year.

Figure 10: The most important accomplishments of GEOSS so far according to (a) key informants and (b) survey respondents. Wedges and associated values represent response frequencies rather than proportion of total responses. Respondents could provide more than one answer. a b

Figure 11: The “First 100 Steps” report from the Cape Town Ministerial was the only major attempt to market results of GEOSS that the Team found. Respondents and key informants both identified a need for better communication of the value-added results of GEOSS.