Power Systems Conference 2005 Clemson University Doug Staszesky Director – Product Management Automation Systems Division S&C Electric Company Automatic.

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

Page 1 Outage Management Roy Hoffman 29 Jan 2001.
LOGO Safety Through Prevention – Safe Switching Using Smart Key Technology Shuqiang Jin, Unitech, Zhuhai, China Nan Liu Youru Huang, SERCC EPRI's 14th.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
© Southwest Electrical Distribution Exchange (SWEDE) May 2, 2008 Materials and Equipment John Macek Application Director, S&C Electric.
Distributed Intelligence Provides Self-Healing for the Grid
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Page 1Smart Grid Research Consortium – October 20-21, 2011 Distribution Automation Technical Background & Current Trends Dan Murray Siemens Energy, Inc.
Microgrids and Infrastructure Resiliency RPI Microgrid Workshop Stuart Nachmias October 10, 2013.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
Distribution Automation Plans in AEP Texas. Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr.
Fault Hunting Using Three-Phase Reclosers Michael S. CostaJerome V. JoskenDennis A. Walder Eversource EnergyUC SynergeticEaton IEEE Rural Electric Power.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
FRIENDS and WAR The mission of the Power Center for Utility Explorations is to explore all energy issues holistically and to develop innovative solutions.
Manaen Srigiri James Abhilash DEMAND RESPONSE ___________________________ OUR RESPONSE TO CRITICAL CHALLENGES.
Chapter 7 SYSTEM PROTECTION
12/10/14 Advanced Metering Infrastructure Smart Grid Boot Camp IIT Delhi Oct 12, 2014 bindoo srivastava.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
Smart Grid Technologies Damon Dougherty – Industry Manager.
Distribution Automation: Fault Detection, Isolation, and Restoration
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Smart Grid- An Introduction
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
APS and Its Smart Grid Initiatives September 26, 2012 Tony J. Tewelis Director, Technology Innovation.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
LAFA Food Distribution
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
Manjula Dewadasa Arindam Ghosh Gerard Ledwich
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Doc.: IEEE /0121r1 Submission January 2010 Craig Rodine, Electric Power Research InstituteSlide 1 Some High-Level Smart Grid Requirements Date:
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
1 A Case Study of Extensive Automation in London Cliff Walton & Bob Jackson.
NERC Lessons Learned Summary LLs Published in September 2015.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Smart Grid Schneider Electric Javier Orellana
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Metering Americas April 24, 2006 Advanced Metering.
ECE 498HZ: Power Distribution System Analysis
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
A smart grid delivers electricity from suppliers to consumers using two-way digital technology to control appliances at consumers' homes to save energy,
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
Utility Needs and Smart Grid for Major Storm Events
Overhead Distribution Systems
Advanced Fuse-Saving Techniques
35kV Assessment SWEDE 2007 May 10, 2007.
Smart Grid Developments in Alberta
Presented by: LADWP November 14, 2017
Presentation transcript:

Power Systems Conference 2005 Clemson University Doug Staszesky Director – Product Management Automation Systems Division S&C Electric Company Automatic Reconfiguration Schemes to Improve Reliability

Overview High-Reliability Distribution SystemHigh-Reliability Distribution System IntelliTEAM IIIntelliTEAM II

High-Reliability Distribution System High-speed fault clearingHigh-speed fault clearing Open or closed loop applicationOpen or closed loop application “No outage” operation in closed loop mode“No outage” operation in closed loop mode Up and runningUp and running –International Drive – Orlando –UCSB – California –Danvers – Virginia –Greater Toronto Airport

Power System One-Line Substation B Substation A 3 miles

UG Primary Network (closed loop) Normal Condition T = 0 sec Each loop can have any number of switches

UG Primary Network (closed loop) Fault Condition T <.10 sec RFFRRF

UG Primary Network (closed loop) Fault Cleared T =.10 sec

IntelliTEAM II Automatic fault isolation and load restorationAutomatic fault isolation and load restoration Distributed intelligence – utilizing “agents”Distributed intelligence – utilizing “agents” Scalable, building block approachScalable, building block approach Supports complex systems of virtually any sizeSupports complex systems of virtually any size Does not require SCADA – but supports integration with SCADA systemsDoes not require SCADA – but supports integration with SCADA systems Utilizes peer-to-peer mesh communication networkUtilizes peer-to-peer mesh communication network Builds on legacy IntelliTEAM system which has been installed at utilities since 1997Builds on legacy IntelliTEAM system which has been installed at utilities since 1997

From one switch – to eight source line segmentsFrom one switch – to eight source line segments Build to meet any desired circuit / system configurationBuild to meet any desired circuit / system configuration Defined as automated switch Simplest segment Up to (8) switches Scalable, Building Block Approach

A “Simple” IT-II System

Maximize Assets System uses real-time load monitoring to prevent overloading during restoration switching.System uses real-time load monitoring to prevent overloading during restoration switching. Enables higher normal circuit loadingEnables higher normal circuit loading The excess capacity of adjacent sources can be used to restore service to unfaulted segments, helping defer the need for system upgrades and allowing your customer to tie circuits that traditional planning criteria would not permitThe excess capacity of adjacent sources can be used to restore service to unfaulted segments, helping defer the need for system upgrades and allowing your customer to tie circuits that traditional planning criteria would not permit

IT-II at a Co-op

Fully Scalable IntelliTEAM II monitors real-time current and voltage throughout the system and uses this information to make smart switching decisionsIntelliTEAM II monitors real-time current and voltage throughout the system and uses this information to make smart switching decisions Accommodates tie points from multiple sources to assure a restoration solution.Accommodates tie points from multiple sources to assure a restoration solution.

Phase I Targeted Feeders Shown as IntelliTEAM II Circuits (customer drawing) A “Real” IT-II System

N.O S1 S2 S3 S4 F11 F12 F13 F21 F22 F31 F32 F33 F42 F Team F Team E Team D Team M Team A Team B Team C Team O Team P Team Q Team G Team H Team L Team K Team J Team I Team R Team S Team T Team U Team V Team W Team X Team Y Team N

Safety Multiple blocking methods ensure that automatic operation is prevented when crews are working on the line

Install, Configure, Use Basic configuration provides immediate benefitsBasic configuration provides immediate benefits Priority settings enable predictable, repeatable results to ensure planning criteria are metPriority settings enable predictable, repeatable results to ensure planning criteria are met

Here Now FPL – FloridaFPL – Florida Progress Energy – FloridaProgress Energy – Florida Blue Ridge Electric Cooperative – North CarolinaBlue Ridge Electric Cooperative – North Carolina Enmax – CanadaEnmax – Canada

Example

IntelliTEAM II Installations: Southeast utility in USA Reacting to a corporate directive, engineers set out to improve customer reliabilityReacting to a corporate directive, engineers set out to improve customer reliability The Goals:The Goals: –To provide a higher level of service –To be distinguished as a premier supplier of electricity among all US utilities Expected Benefits:Expected Benefits: –Increased customer as well as regulatory support –Reduced costs from fewer service complaints/investigations –Eventual revenue expansion from customers attracted to high reliability service area

Project Background Utility limits permanent outages to under 1 minute, even though regulators are not so stringentUtility limits permanent outages to under 1 minute, even though regulators are not so stringent Designed a “Ideal Feeder” to allow quick reconfiguration by dispatchersDesigned a “Ideal Feeder” to allow quick reconfiguration by dispatchers But reconfiguration still often exceeded the 1 minute limit during storms or other significant eventsBut reconfiguration still often exceeded the 1 minute limit during storms or other significant events The less than 1 minute goal mandates Feeder Automation for the majority of interruptionsThe less than 1 minute goal mandates Feeder Automation for the majority of interruptions The complexity of the Ideal Feeder Topology presented problems for conventional automation schemesThe complexity of the Ideal Feeder Topology presented problems for conventional automation schemes

Model Feeder Implications This logic is manageable by veteran dispatchers in typical outages, but becomes time-consuming in widely distributed outagesThis logic is manageable by veteran dispatchers in typical outages, but becomes time-consuming in widely distributed outages This logic is not easily automated with traditional toolsThis logic is not easily automated with traditional tools Ideal Feeder logic could also not be managed by the linear orientation of standard IntelliTEAMIdeal Feeder logic could also not be managed by the linear orientation of standard IntelliTEAM IntelliTEAM II was deployed in Jan, 2003IntelliTEAM II was deployed in Jan, 2003 Over 100 overhead switches/controls now in operationOver 100 overhead switches/controls now in operation

IntelliTEAM II Installations: CANADA A multiple-year, Feeder Automation (FA) project is now underway Phase I (to complete in Nov, 03) involves 7 subs, 19 feeders and 46 switches (32 overhead & 14 underground)Phase I (to complete in Nov, 03) involves 7 subs, 19 feeders and 46 switches (32 overhead & 14 underground) Completion will include over 200 switching points and automate over 80 feedersCompletion will include over 200 switching points and automate over 80 feeders The primary requirement is automatic circuit reconfiguration in less than 60 secondsThe primary requirement is automatic circuit reconfiguration in less than 60 seconds

Project Background Key Project Requirements: 1.Reconfiguration in under 1 minute on fault or loss of voltage 2.Minimum availability for each FA feeder over 99.9% 3.FA System must detect Under-Voltage & Under-Frequency Load Shedding & disable auto-reconfiguration in affected area 4.Station breakers must also participate in reconfiguration, despite most having electro-mechanical relays and 1-shot to Lockout 5.Project to include a Communication Management System (CMS) to enable operators to monitor, interrogate & control the operation of all components in the FA System

INTELLITEAM II: PRINCIPLES OF OPERATION

IntelliTEAM II — Teams Teams are the switches bounding the line segmentsTeams are the switches bounding the line segments A team may have one to eight switchesA team may have one to eight switches A switch can belong to one or two teamsA switch can belong to one or two teams Each switch is defined as a specific switch type for each team that it is inEach switch is defined as a specific switch type for each team that it is in

IntelliTEAM II — Systems Build up system of line segmentsBuild up system of line segments Share team members at connection pointsShare team members at connection points Set automatic operation values (no programming)Set automatic operation values (no programming) Set optional source priorities and strategiesSet optional source priorities and strategies

IntelliTEAM II — Systems Coordinate with breaker settings, number of shotsCoordinate with breaker settings, number of shots Can order ties in priorityCan order ties in priority Can limit number of segments picked upCan limit number of segments picked up Can set loading limitsCan set loading limits

IntelliTEAM II — Coaches Software agents called “coaches” circulate among the teams and “call the plays” to keep customers in serviceSoftware agents called “coaches” circulate among the teams and “call the plays” to keep customers in service The coach brings system data to team members and dynamically prioritizes the team restoration strategyThe coach brings system data to team members and dynamically prioritizes the team restoration strategy

IntelliTEAM II — Coaches A team’s coach works to keep the team energized by negotiating with adjacent coaches – and can close switches that teams share when both coaches agreeA team’s coach works to keep the team energized by negotiating with adjacent coaches – and can close switches that teams share when both coaches agree When an outage or line fault occurs, the coach of each affected team reads the situation and develops a restoration strategyWhen an outage or line fault occurs, the coach of each affected team reads the situation and develops a restoration strategy

How IntelliTEAM II Works — Details Coach must check on each team member within a predetermined time interval If a team member does not hear from the coach in this period of time, error condition is flagged Team members notify the coach and other team members when events occur that will affect the line segment

IntelliTEAM II — Return to Normal When normal power has been restored or the fault has been corrected, the system will return to its normal configuration, either manually, automatically, or via SCADA command.

IntelliTEAM II — Contracts Contracts are optional and are used with segment limits to “look” ahead and prevent circuit overload in case of multiple faults

Peer to Peer Radio Communications Spread-spectrum technology 902- to 928-MHz range. Mesh networking Secure and reliable UtiliNet ®

Advanced Distribution Circuit Reliability Techniques SCADA Standard Source Transfer IntelliTEAM II HRDS Open- Loop HRDS Closed- Loop Power Electronic Switching 5-60 min 2-5 sec sec 3 sec No-OutageNo-Outage Extended Outage Impacts SAIDI, SAIFI, CAIDI Spot Solution Area Solution Only Customers Beyond Fault Impacted No-OutageTactical Power Quality Dispatcher Required Self-Powered or Battery Powered Distributed Intelligence Unlimited Units - Universal Application Unlimited Units - Universal Application Unlimited Units - Special Application Unlimited Units - Special Application UPS - 30 sec Ride-through

For More Information Contact Doug Staszesky Director – Product Management S&C Electric Company 6601 North Ridge Blvd. Chicago, IL x For Demo of IntelliTEAM II