Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.

Slides:



Advertisements
Similar presentations
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
Advertisements

Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
Western Regulation Usage and Pilot Program Results 1.
Technical Conference Avoided Cost Modeling January 6, 2015.
Energy and Telecommunications Interim Committee January 29, 2004.
Agenda Overview of Rolling Forecast Cultural considerations Quarterly update process Quarterly update process timing Structure setup and configuration.
Reliable Power Reliable Markets Reliable People Future Demand and Energy Outlook (2008 – 2028) Assumptions, Methodology and Processes April 2, am.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Unlocking value from existing utility assets NARUC Meeting – February 2012
Energy Year 2013 Electricity Finnish Energy Industries.
Quantifying Results Model Comparison Run models under various scenarios –Heavy load –Light load –Normal load Calculate cost reduction under new model.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
NERC LTRA Update / CDR Capacity Counting Issues
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Technical Meeting AESO’s 2015 Forecasts, Own Costs Budget Stakeholder Meeting October 6 and 8, 2014.
0 CPUC / CEC Workshop Reporting and Tracking GHG Emissions for a Load Based Cap PG&E Reporting Emissions and Estimating Emissions from Unspecified Purchases.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
Reliable Power Reliable Markets Reliable People Demand Response in Alberta’s Wholesale Electricity Market Demand Response Working Group Kick Off Meeting-
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
Reliable Power Reliable Markets Reliable People Ancillary Services: 2008 Preliminary Cost Forecast 2007 Budget Review Process August 28, 2007 Commercial.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Ancillary Services Market at Watt-Ex. 2 WHAT ARE ANCILLARY SERVICES?  Maintain stability of electricity grid  Dispatched by the System Controller (AESO)
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
MAPE Publication Neil McAndrews For Bob Ryan of Deutsche Bank.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
Principal Load Profiling and Modeling
APTA Sustainability Workshop 2016
Wind Management at MISO
Overview of New Control Room Desk
APTA Sustainability Workshop 2016
Basin Electric SPP Market Update
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Avoided Cost and E3 Calculator Update Workshop
Study Results Drought Scenario Study
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning

GTA, Losses and Ancillary Services Presentation and Agenda: Overview Forecast the volumes and costs of losses in 2008 Forecast the volumes ancillary services in 2008 Year-to-date Actual vs. Forecast Comparison Methodology of forecasting Losses and AS – evolving process Summary Discussion

3 Overview – 2008 Business Review Process Costs for Losses and Ancillary Services (AS) are based on a volume forecast using: Latest 2008 Alberta Internal Load forecast (includes behind the fence loads (BTF) and new DTS contracts) 2008 grid facility profile (existing, new, decommissioned) Latest TMR forecast as per OPP’s Updated generation stacking order based on latest 12 months actual dispatch behavior of generators, and Import/Export A north/south model includes export ATC based on SOK transfer limit

Forecast of Losses – Cost and Volume Analysis Hourly forecasted loss volumes calculated based on: –Historical actual loss volumes from the AESO settlement system –A forecasting model using the historical data The losses volumes are re-calculated three additional times per year (to fulfill the calibration factor process) Annual forecasted loss volume can be computed by summing hourly forecasted loss volumes Hourly forecasted loss cost is: Σ (forecasted loss volume X forecasted pool price) hourly Estimated cost for 2008 = $251.4 M, based on TWH –2007 Forecast: $ TWH

5 Based on the 2007 GTA losses forecast submission Actual data is settled as: Initial, Interim, and Final 2007 YTD – Loss Comparison

YTD – Loss Comparison (…2) 2008 F/C 2007 (F/C and Updated F/C) Variance Under (Over) 2006 Actual 2006 Approved F/C Variance Under (Over) Total Losses Costs ($M) /208.5 (Q3 CF) Total Volumes (GWh) 2,910 2,897/2,840 (Q3 CF) 702,8433,180(337) Average Hourly Volume (MWh) / The overall summary is estimated below (losses update in June 2007, price forecast from August ):

Forecast of AS (Operating Reserves and TMR) – Volume Analysis AESO carries operating reserves to ensure reliability during loss of generation. Requirements set by WECC and NWPP Operating reserves include regulating, spinning and supplemental reserve Described in OPP-401 and OPP-402, AESO procures each type of operating reserve in two portfolios: Active (normal), Standby (used when Active portfolio is insufficient due to forecast accuracy issues/forced outages) Not included in the forecast: –Frequency Responsive Reserves –Wind Variability

Forecast of AS – Volume Analysis (…2) Volume of reserves procured based on load forecast, with no consideration given to resource mix Transmission Must Run (TMR) based on hourly load forecast (Rainbow and northwest) and OPP 501, 510 (Calgary Operation) AS cost analysis by Commercial Services

9 Ancillary Services: Forecast vs. Historical ASType 2008 Forecast (MW) 2007 January – July (Actual) (MW) 2006 (Actual) (MW) 2005 (Actual) (MW) RegActive SRActive SUPActive RegStandby SRStandby SUPStandby RegActivation SRActivation SUPActivation

10 Methodology of Forecasting Losses and Ancillary Services The AESO reviews it’s tools and data sources continuously and makes improvements to achieve better forecasts and more efficient use of time –More data for historical analysis is utilized –Improved database techniques In 2007, the Losses and Ancillary Service volume forecast appears on track to be within 1-2% of actual levels The AESO will use the same process in the 2008 GTA submission – better data and tools will be used where warranted

11 Summary: Losses The 2007 forecast and 2007 actual loss results (YTD) are similar The loss volumes from 2007 to 2008 are similar (2.897 TWH vs TWH). The result makes sense because there are no major system changes expected The major cause of the change from ~$196M to ~$251M is the pool price (beginning of year forecast average moves from ~$66 in 2007 to ~$84/MWH in 2008)

12 Summary: Ancillary Services The forecast for 2008 is similar to actual levels from the past several years The slightly higher values in the active market in 2007 is likely the result of a mid-year view. FRR has not yet been determined. Regulation Reserve implementation for wind has not yet been decided. AS will be modified as these items are addressed and implemented