Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
CDM Executive Board – status of work Q&A sessions at UNFCCC COP/MOP2 – November 2006 Mr. José Domingos Miguez Chair of the CDM Executive Board.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
CDM Accreditation Procedure: A Broad Overview John Kilani Chair CDM-AP Joint Workshop for EB and its Panels March 2003, Bonn, Germany.
Fact and Figures on the CDM. Status of registration Status: 16 Nov For only 8 cases the Board undertook review: 6 were registered after corrections.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
Learning from the CDM First UNFCCC workshop on Article 6 projects under the Kyoto Protocol May 2004 Moscow, Russian Federation John Shaibu KILANI.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CDM Executive Board – status of work Maria Netto Cooperative Mechanisms UNFCCC secretariat
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Cooperative Mechanisms UNFCCC secretariat JI under UNFCCC - An overview -
SEAN-CC Regional Training Workshop: Building Capacity on Access to Funds for Climate Change Adaptation Initiatives NIE accreditation process Mozaharul.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
" Current status and perspectives of Clean Development Mechanisms Buenos Aires, September 2003 Content of the presentation: The cdm.unfccc.int homepage.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
EMMER INTERNATIONAAL LULUCF and insights into the ARWG Igino Emmer.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Module Calibration regarding accreditation assessment requirements Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs)
Roster of experts of the clean development mechanism (CDM) 11 June 2003 Mikhail Vartanian & Kay Merce CDM / Cooperative Mechanisms.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Structure of the presentation The origins of CDM What is the CDM? Players of CDM.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Update on the CDM May 2004 UNFCCC/Cooperative Mechanisms CDM team.
CDM: ISSUES FOR CMP 2 AND THEIR IMPLICATIONS TO LDCS Presentation made to the LDC Negotiators Workshop, Nairobi, 3 November, 2006 Richard Muyungi United.
Activities on regional distribution of Clean Development Mechanism (CDM) Projects With reference to LDCs.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Clean Development Mechanism
JISC – work accomplished and challenges ahead
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
CDM Methods and project design: Baselines
Q&A sessions at UNFCCC SB26
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Theoretical differences between CDM and JI validation/determination
Work Accomplished by JISC
Presentation transcript:

Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol WB Workshop for developers Buenos Aires 5 December 2004

Project cycle - CDM | Introduction Project Cycle is not so different from normal cycle. Project activity “product/deliverable”: certified emission reductions – cross-border/”globally” recognized Approved ways of “production” – application of approved methodologies => design/validation Verification and certification of “output” – application of approved monitoring methodologies/plans => verification/certification “Creation” of “product” => Issuance of CER Intergovernmental body (EB) combined with, centralized accredited, globally operating private/public sector companies to undertake main tasks (DOEs)

COP/MOP (COP until KP enters into force) CDM Executive Board (supported by technical panels and working groups) Designated operational entities (DOE) Project participants Designated national authorities (DNA) “ Infrastructure ” CDM Project Cycle| Players

Provide info Confirm that requirements are met Implement Certify ERs COP/MOP CDM “infrastructure” Companies (private/public) Written letter of approval from DNA involved required prior to request for registration. CDM project cycle| Roles and responsibilities

Project Participant to assess and decide whether approved baseline and monitoring methodology is applicable to his project activity If yes apply and proceed in project cycle If not decide whether to: –Abandon –Propose new methodology (subject of remainder of the presentation) CDM project cycle| Project Design stage- methodology

Project participants (PP) to describe in CDM-NMM, CDM-NMB a proposed new methodology (taking into consideration modalities, guidance by Board) PP to provide an example of the application of the proposed new methodology by filling a draft CDM-PDD; Role of DOE: check for completeness, including whether guidance regarding the filling of required documentation has been adhered to by PP; Procedure for submission and consideration of proposed new methodology (version 06). Methodology Process| Propose New Methodology

PP draft and submit Secretariat re-checks completeness Date of EB receipt DOE/AE Checks completeness One panel member pre- screen 1 = Meth Panel to consider (go to step 2) 2 = Case not approved Methodology Process| Procedure for submission /consideration

Public Desk reviews EB 4 months 15 days Methodology Process| Procedure for submission /consideration - 2 (selects 2 experts from ROE) Recommendation to Meth Panel - standard format Meth Panel Recommendation to the Board – standard format Approval – A, B or C 10 days 7 weeks Methodology Submitted (= 1)

PP Meth Panel Answers Questions? AEs/ DOEs Sec. Comment (10 days) Next Meth Panel meeting If comments Draft recommendation EB NO comments Feedback loop for “B cases”

CDM M&P has empowered EB to approve baseline and monitoring methodologies; EB can recommend additional general guidance to COP/MOP (COP) on methodological issues; EB provides clarifications and guidance to DOEs, project participants and its panels. EB may draw on outside expertise. Methodology| Roles and responsibilities of EB

EB states whether methodologies: –Are approved. Approved methodologies are “reformatted”. Possible “consolidation” of approved methodologies is envisaged, as experience accrues; –Shall be reconsidered (“B” cases), –Are note approved. (“C”cases) Methodology process| EB decisions

EB Makes recommendations e.g. on M&P, accredited OE, methodologies, simplified procedures for small scales, regional distribution of projects, its R&P, etc. Report on its activities e.g. accreditation, registration, issuance of CERs, CDM registry, approved methodologies, etc. COP/MOP (COP) Decides and provides guidance Expert Panel (Meth Panel) Expert Panel (CDM-AP) Expert Panel N Roster of Experts and other expertise when appropriate Advises Serviced by the secretariat CDM EB| EB institutional set up

Two consolidated methodologies for renewable energy projects and landfill gas Tool for assessing and determining additionality. Nineteen baseline and monitoring methodologies approved. About 35 proposed methodologies at different stages to be considered by EB. Next round for submissions: 14 February Methodologies approved for 14 categories of small scale projects (3 main categories: renewable energy, energy efficiency and projects that emit less than 15 Kt CO2 e/y). Currently consideration of methodologies for energy efficiency improvements for specific agricultural activities. Two new methodologies for afforestation / reforestation project activities submitted so far. Next round for submissions: 9 February Guidance and clarifications on various methodological issues; See UNFCCC CDM web site for more information! Methodologies| Where it stands

INFORMATION SOURCE| Keep up to date CDM –UNFCCC CDM website ( –UNFCCC CDM News Facility (Requirement to register as a UNFCCC CDM web site user (join) -> automatically subscribed) –CDM EB meetings are web cast (internet), –CDM EB meets frequently with constituencies –Q&A sessions are held in conjunction with COPs/SBs –Reports of the EB to COP (First, second and third available) Feel free to ask questions! now or later ( to

@ UNFCCC CDM News Facility (If you join as a UNFCCC CDM web site user -> automatically subscribed)