Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
PAN European Network Services (PENS)
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 Satellite AIRCOM Infrastructure Reinforcement.
FAA AMHS Subnetwork Overview
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
NAN National ANS Network General Authority of Civil Aviation
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Identifying MPLS Applications
The Future of PETAL Technology
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Workshop on preparations for ANConf/12 − ASBU methodology
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
Secure Communications in Civil Aviation Paul Wells A presentation to ATN September 2002.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
FAA/JCAB ATN & AMHS Trial Varadero, Cuba May 2002 Presentation ATN 3.2 by H. Tran.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
AMHS (ATS Message Handling System)
ATN Subnetwork Implementation:
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
United Telecommunication Services Michael Gaari Manager Network Provisioning UTS
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Asia/Pacific AMHS Implementation Workshop AMHS Description and Implementation December 15-16, 2008 Chennai, India.
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
Federal Aviation Administration Presented to the International Civil Aviation Organization Asia/Pacific Regional AMHS Workshop Chennai, India Date:
IPv6 integration with the ATN Tony Whyman Helios Information Services Ltd.
AMHS Interoperability
AMHS WORKSHOP POLICY & DOCUMENTATION. AMHS WORKSHOP POLICY & DOCUMENTATION  Operational Requirements for facilities or services are established through.
Data Link Communications
Aircraft Communications Addressing and Reporting System
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
IMPLEMENTATION STRATEGIES
1 CHAPTER 8 TELECOMMUNICATIONSANDNETWORKS. 2 TELECOMMUNICATIONS Telecommunications: Communication of all types of information, including digital data,
ATS Message Handling System (AMHS)/ System Wide Information Management (SWIM) Workshop and the Seventh Meeting of Aeronautical Telecommunication Network.
William Stallings Data and Computer Communications
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Electronic Commerce and the Internet Chapter 6. Chapter Objectives Describe what the Internet is and how it works Explain packet-switching and TCP/IP.
International Air Transport Association Transition to the new CNS/ATM ATN 2000, September 2000, London Günther Matschnigg IATA Vice President Operations.
Computer and Data Communications Read Chapters 1 & 2.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
AERONAUTICAL COMMUNICATION Presented by-Under the guidance of- Akshay Kumar SinghDr. Shahanaz Ayub EC 3 rd YearElectronics & Comm. Engg
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
Data and Computer Communications Eighth Edition by William Stallings Chapter 1 – Data Communications, Data Networks, and the Internet.
Air Traffic Control Communication
PAN European Network Services (PENS)
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
FAA Ground to Ground ATN Implementation Plan
Workshop on preparations for ANConf/12 − ASBU methodology
Technology Roadmaps H. Sudarshan
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ATN/VDL Mode 2 Implementation Status
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
GPRS GPRS stands for General Packet Radio System. GPRS provides packet radio access for mobile Global System for Mobile Communications (GSM) and time-division.
Technology Roadmaps H. Sudarshan
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
ATN Subnetwork Implementation:
Presentation transcript:

Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services

Facing up to the ATN The airlines established SITA (the International Organization for Aeronautical Telecommunications) to provide an international data network in 1948, just as the International Civil Aviation Organization began writing its convention Annex 10 standardizing “Aeronautical Telecommunications”. SITA now has to respond to ICAO’s latest addition to Annex 10, the ATN standard which specifies a new way of providing the terrestrial and air-ground data network services we already provide.

Evolution of Air Transport Data Communications Up to 1990, the telecoms industry had not developed data network standards so SITA and the airlines developed and used airline industry standards. From 1990, SITA began implementing the telecoms industry standards: X.25, Internet Protocol, Frame Relay, Asynchronous Transfer Mode. SITA has implemented integrated digital voice and data service over Frame Relay and more recently also over IP.

SITA core network evolution SITA has network access points in 220 countries, supporting 160,000 customer connections. The airlines have used SITA’s telecoms industry standard services to introduce new systems using generic interfaces, and today in particular Web based systems using IP. Airlines systems would only use an ATN Internet interface to networks also used by ATS providers so The number of airline systems using an ATN interface is not expected to justify SITA deploying ATN routers in the core network.

ATS use of generic networks Many ATS providers operate X.25 data networks that transport radar data and AIS messages. ATS communications are increasingly using generic telecoms services: –The FAA Telecommunications Infrastructure (FTI) initiative seeks to replace the FAA’s leased lines with a Frame Relay and ATM backbone. –The Eurocontrol CFMU is seeking a regional IP service to enable the Enhanced Tactical Flow Management System. As these ATS communications will not use the ATN Internet, SITA can address them with the current generic network.

ATN Specific Services The ATN standard specifies the following services: ATS Message Handling Service (AMHS) –AMHS is not an application, but rather a messaging service based on the X.400 standard. ATS Interfacility Data Communications (AIDC) –AIDC is the only terrestrial application designed to directly use the ATN Internet. AIDC is the exchange of Air Traffic Control information for active flights between FDPS’s, called On-Line Data Interchange (OLDI) in Europe. ATS Data Link Applications –CPDLC, ADS, CMA

Which ATS ground systems will use the ATN Internet? ATS Message Handling Service (AMHS) –As AMHS has its own addressing scheme, AMHS systems can communicate via X.25 networks and do not require ATN Internet routers. This makes it difficult to develop a business case for deploying ATN routers to support AMHS. ATS Interfacility Data Communications (AIDC) –As AIDC is only used between FDPS’s, a transition from current FDPS interchange protocols such as OLDI to ATN would generate only a limited number of terrestrial ATN Internet terminals. FDPS’s that implement ATN Data Link applications are also likely to use it for AIDC.

Aircraft use of the ATN Internet The aircraft data link service has evolved more slowly than the terrestrial services because of the need to upgrade avionics. Aircraft still use the ACARS link specified around 1980 for the transport of text messages. The ATN Internet design covers the interconnection of air-ground and terrestrial networks and this now seems likely to be its primary function. CPDLC usage in Europe and the USA requires better performance than ACARS can provide and is driving the implementation of the ATN internet.

SITA ATN Implementation As the primary use of the ATN Internet will be for aircraft data link, the SITA ATN implementation is focussed on the AIRCOM service. SITA will at the end of 2000 begin deploying new VHF ground stations to provide ICAO VDL Mode 2 service supporting ATN Internet communications. The SITA deployment of ATN routers will be tailored to meet needs of airline and ATS customers. SITA is also implementing air-ground IP service but aircraft are only expected to use it for passenger services and file transfers.

Conclusion As most airline and ATS ground systems are using the generic telecoms protocols, the terrestrial use of the ATN Internet seems likely to be very limited. Only aircraft data link applications can justify the use of the specialised ATN Internet protocol, and this should justify its use between the ground systems that host these applications. The ATN Internet needs to be implemented in aircraft systems quickly to avoid AOC data link applications migrating from ACARS to the planned IP networks, which would undermine the ATN business case.