1 1 Technology and Economic Assessment Panel M o n t r e a l P r o t o c o l M O P - 2 4, 12 - 16 N o v e m b e r 2 0 1 2, Geneva.

Slides:



Advertisements
Similar presentations
1 HCFC Phase –out in Air Conditioning Sector Background, Challenges and Progress Sidi Menad SI AHMED 17 TH October 2012.
Advertisements

1 M o n t r e a l P r o t o c o l M O P m e e t i n g, N o v e m b e r , B a n g k ok International Civil Aviation Organization (ICAO)
HFCs: A Critical Link in Protecting Climate and the Ozone Layer Alternatives to high-GWP HFCs UNEP side-event, Montreal Protocol MoP-23, 21 November 2011.
T E A P a n d T O C s - A s s e s s m e n t , M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt.
Tuesday, 7 May 2013 Prof. Mohamed Besri
M o n t r e a l P r o t o c o l O E W G - 32, July 2012, Bangkok (Thailand) Response to Decision XXIII/5: Quarantine and Pre-shipment uses of Methyl.
Decisions of the Parties Related to Essential Use Nominations (EUNs) Ozone Secretariat 6 July 2008 Bangkok.
HFC Phasedown Under the Montreal Protocol OZONACTION NETWORK FOR LATIN AMERICA AND THE CARIBBEAN OCTOBER Mexico, D.F. Canada, Mexico and The United.
MBTOC Cochairs :  Mohammed Besri  Marta Pizano  Ian Porter Methyl Bromide CUE: Final Recommendations M o n t r e a l P r o t o c o l 26 th MOP,
Technology Options and HPMPs Montreal Protocol and Chemicals Unit UNDP.
1 HFC demand Lambert Kuijpers TEAP co-chair Workshop on HFC Management Paris, 11 July 2014.
TEAP Methyl Bromide Technical Options Committee TEAP Methyl Bromide Technical Options Committee 1 Montreal Protocol, MOP 25, Bangkok, October 2013.
Critical Use Nomination: Interim Recommendations MBTOC Cochairs :  Mohamed Besri  Michelle Marcotte  Marta Pizano  Ian Porter Montreal Protocol, OEWG-32,
Current and Future HFC Demand
Region and sector specific HFC scenarios and effects of MP proposals
1 Current and Future HFC Demand by Sectors Bella Maranion TEAP co-chair OEWG-35, Bangkok, 22 April 2015.
H F C M a n a g e m e n t W o r k s h o p, J u l y , P a r i sRoberto Peixoto - IMT Roberto A. Peixoto Maua Institute of Technology - IMT.
Decision XXVI/9 progress Lambert Kuijpers Bella Maranion Roberto Peixoto Co-chairs XXVI/9 Task Force XXVI/9 Task Force1.
Summary of the rapporteurs Key conclusions of the Workshop on HFC Management: Technical issues K. Shepardson / S. Sicars OEWG Bangkok 22 April 2015.
M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u n e , G e n e v a 1 TEAP Progress Report.
Developments on the Phase- in of Low GWP Chemicals In Various Polyurethane Sectors Kultida Charoensawad PolyUrethanes Industry Group, Thailand UNEP workshop.
Decision XXVI/7 HTOC.
1 ALTERNATIVE TECHNOLOGIES TO CFCs AND HCFCs OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS.
1 North American Proposal for Phasing Down HFCs under the Montreal Protocol Presentation by Canada, Mexico and the United States Main Meeting of Ozone.
TEAP XXVI/9 Task Force Report
Update on alternative technologies and international developments in the Polyurethane Foams Sector.
TEAP 2014 Assessment Report
Final TEAP XXV/5 Task Force report Presentation to MOP-26 Paris, 17 November 2014.
INDIAN INDUSTRY PERSPECTIVE ON PHASE DOWN OF HFC S REFRIGERANT GAS MANUFACTURERS ASSOCIATION (REGMA) INDO-US WORKSHOP ON HFCs 18 th February, 2011.
36th OEWG UNEP SIDE EVENT 22 J u l y , P a r i sRoberto Peixoto - IMT Roberto A. Peixoto Maua Institute of Technology – IMT Brazil Disclaimer: The.
TEAP Assessment Report 2014 M o n t r e a l P r o t o c o l M O P - 2 6, N o v e m b e r , P a r i s.
Availability of Low-GWP Alternatives Options for Near Term & Longer Term Transitions OZONACTION NETWORK FOR LATIN AMERICA AND THE CARIBBEAN OCTOBER 6-8.
Final Task Force Report - October 2013 MOP-25 – Bangkok, Thailand.
Draft TEAP XXV/5 Task Force report Presentation to OEWG 34 Paris, 14 July 2014.
HCFC management and strategy in Hungary and Europe Róbert Tóth Ministry of Environment and Water Budapest, Hungary.
Using Montreal Protocol to Protect the Climate Kristen N. Taddonio U.S. Environmental Protection Agency Stephen O. Andersen Co-Chair, Technology & Economic.
1 1 Technology and Economic Assessment Panel Report on 2014 Assessment M o n t r e a l P r o t o c o l M O P - 2 5, O c t o b e r , B.
The TEAP 2010 Assessment Report MOP-23 High Level Segment Nusa Dua, Bali, Indonesia 24 November 2011.
11 Response to Decision XXIV/8 TEAP Terms of reference, code of conduct, and disclosure and conflict of interest guidelines for the TEAP and its TOCs and.
1 Report of the TEAP XXIII/9 Task Force. M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u l y , B a n g k o k 2 Outline.
T E A P R T F S u p p l e m e n t R e p o r t, M O P - 2 0, D o h a 1 Supplement to the Report on the Replenishment of the Multilateral Fund for the Period.
Technology and Economic Assessment Panel Progress Report 2012.
M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u l y , P a r i s 1 TEAP Replenishment Task Force Report Assessment of.
1 Addressing HFC Consumption Under the Montreal Protocol Dr. John E. Thompson Deputy Director Office of Environmental Policy U.S. Department of State.
Technology and Economic Assessment Panel Progress report 2014 including EUN and CUN report.
Maximising the climate benefits of the HCFC phase-out European Commission 36th OEWG, Paris, 20 July 2015 Lunch time Meeting: The EU amendment proposal:
INDUSTRY PROGRESS AND NEEDS FOR REPLACING HIGH GWP HFC S Montreal Protocol HFC Management Workshop Paris July 11, 2014.
Challenges Faced by Companies in Article 5 Parties in Converting to Low-GWP options R K Mehta RAMA – INDIA 20 th & 21st April 2015 Bangkok.
TEAP MBTOC Cochairs :  Mohammed Besri  Marta Pizano  Ian Porter CUN Interim Assessments: NON A5 and A5 M o n t r e a l P r o t o c o l O E W G
Draft Report - June 2013 OEWG-33 – Bangkok, Thailand.
1 OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS INDIA’S PERSPECTIVE ON PHASE DOWN OF HYDROFLUOROCARBONS (HFCs) UNDER THE AMBIT OF VIENNA.
TEAP XXVI/9 Updated Task Force Report Lambert Kuijpers Bella Maranion Roberto Peixoto TF co-chairs T E A P MOP-27 Dubai, 2015.
M o n t r e a l P r o t o c o l M O P - 2 6, N o v e m b e r , P a r i s 1 TEAP XXV/8 Task Force Report SUPPLEMENT to the Assessment of.
Update on decisions from the 62 nd Meeting of the Executive Committee with special reference to decisions regarding HCFC phase-out for LVC countries A.
T E A P, R e p l e n i s h m e n t T F, P r e s e n t a t i o n a t O E W G TEAP Replenishment Task Force Report Assessment of the Funding Requirement.
John E. Thompson Deputy Director Office of Environmental Quality U.S. Department of State.
1 1 TEAP Progress Report vol. 5 TEAP Response to Decision XXV/6 M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u l y ,
Update on HPMP preparation Art. 5 and CEIT ECA Network meeting - May 18-22, 2009 Yerevan, Armenia.
International Environmental Update Tom Cortina Halon Alternatives Research Corporation IASFPWG Meeting November 5-6, 2003 Atlantic City, New Jersey.
Seite MOP and ExCom Decisions on HCFCs Paul Krajnik Federal Ministry of Agriculture, Forestry, Environment and Water Management Chemicals Policy.
The TEAP 2010 Assessment Report
TEAP Assessment Report 2014
TEAP Progress Report 2011 M o n t r e a l P r o t o c o l O E W G m e e t i n g, A u g u s t , M o n t r e a l 1 1.
Report of the XXII/10 Task Force
Decision XXV/5 Final TEAP XXV/5 Task Force report
M o n t r e a l P r o t o c o l 26th MOP, November , Paris
Progress in Replacing Halons in Civil Aviation
Surveys on ODS alternatives
Presentation transcript:

1 1 Technology and Economic Assessment Panel M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , Geneva

2 TEAP Assessment 2014 TOCs are making preparations for the 2014 assessment About 150 TEAP and TOC experts will be involved The expertise required to complete the assessment reports is being considered in the composition of the TOCs The TEAP 2014 assessment report will include the TOC executive summaries as well as the key messages

2012 TEAP Members Stephen O. Andersen, USA Paul Ashford, UK Mohamed Besri, Morocco Biao Jiang, PRC David V. Catchpole, UK Sergey Kopylov, Russia Lambert Kuijpers, Netherlands Bella Maranion, USA Michelle Marcotte, Canada Alistair McGlone, UK Keiichi Ohnishi, Japan Roberto de A. Peixoto, Brazil Marta Pizano, Colombia Jose Pons-Pons, Venezuela Ian Porter, Australia Miguel Quintero, Colombia Ian D. Rae, Australia Helen Tope, Australia Daniel P. Verdonik, USA Ashley Woodcock, UK Masaaki Yamabe, Japan Shiqiu Zhang, PRC

4 4 FTOC Essential Elements in the Foam Sector M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , Geneva

5 Essential elements in the foam sector The vast majority of HCFC Phase-out Management Plans (HPMPs) are now complete and approved by the Executive Committee of the MLF The first phase of many HPMPs features foam transitions because of the prioritisation of the HCFC-141b phase-out on a ‘worst first’ basis (as per Decision XIX/6) There is no single technology solution for all uses of HCFC-141b and other HCFCs, but sufficient choices are now available in most sectors and regions M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

6 Essential elements in the foam sector Conversion at small and medium sized enterprises will present the major challenge in view of the technical and economic constraints involved The emergence of unsaturated (low GWP) HFCs and HCFCs has created additional options with improved thermal performance A full-scale commercial plant to produce the first of these new chemicals has now been announced for 2014 M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

MBTOC Progress issues

M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a 8 Methyl Bromide Less than 1% of the aggregate baseline for methyl bromide in Non-Article 5 Parties (56,083 t) is now being requested for Critical Uses 80% of the MB use in Article 5 Parties has been phased out from the aggregate baseline (15,866 t) in advance of the 2015 deadline Article 5 Parties may submit CUNs the beginning of 2013 (two years ahead). Sectors where alternatives to MB are proving difficult are similar to those of Non-Article 5 Parties Parties have been invited to provide more detailed information under Decision XXIII/5 by March 2013 to help identify further more detailed information on QPS uses

RTOC Progress issues

M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a 10 Progress in R/AC -2- Blends (GWP<600) consisting of very low-GWP HFCs (HFOs) with saturated HFCs are being proposed for certain refrigeration and AC equipment Manufacturing of HFC-32 (AC) equipment has started in one Non-Article 5 Party and is predicted to start in certain Article 5 Parties in 2013 Daimler-Volkswagen-Mazda rejection of HFC-1234yf due to flammability concerns may result in the application of other low GWP alternatives in future MAC equipment The EC F-regulation, proposed early November 2012, includes a ban on HFCs with GWP>2500 by 2020; this may impact the application of these high GWP refrigerants globally

M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a 11 Progress in R/AC New refrigerants obtained standard designations since the end of 2010, for example R-407F, R-442A, R-511A, R-512A and R-1234ze Efforts to replace HFC-134a by HFC-1234yf are continuing in certain R/AC sectors and sub-sectors The number of supermarkets using trans-critical CO2 systems is steadily increasing, particularly in Europe CO2 cascade systems are also being developed in Article 5 countries; there are now 31 installations in Brazil Cogeneration systems driven by natural gas for Single Buildings or District Cooling (using absorptions systems) are being evaluated in several countries

12 HTOC Update on Cooperation with the International Civil Aviation Organization (ICAO) M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

13 ICAO Survey - Results ICAO issued a Letter to each of its member States requesting a response to two questions given the Montreal Protocol phase-out of halon production: Q1. Do you anticipate that there will be enough halon to meet the civil aviation needs of your State? Q2. Do you know the quantity of halon reserves accessible to the civil aviation industry in your State in order to support its future operations? If “Yes”, please provide quantities in ‘metric tonnes’ 55 out of 191 ICAO member States responded; the survey identified substantial uncertainty M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

14 ICAO Survey – Results (2) Q1. Do you anticipate that there will be enough halon to meet the civil aviation needs of your State? M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

15 ICAO Survey – Results (3) Q2. Do you know the quantity of halon reserves accessible to the civil aviation industry in your State in order to support its future operations? If “Yes”, please provide quantities in ‘metric tonnes’. M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

16 Observations There is little evidence that States Civil Aviation and Ozone Offices worked together However, some replies were from Ozone Focal Points There is a notable lack of response from States where a lot of halon bottles are filled Some States have determined their supplies Some States believe that there is enough halon Some did not report how much they had M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

17 Sums It All Up…..  The following is fairly typical of survey comments from those that responded:  Some States indicated that their airlines, who service both domestic and international markets, say that foreign suppliers provide the halon to fill the fire extinguishers in their fleets  Some States were unaware of any company that recycles halon for aviation fire extinguishers within their country  It is likely that many States depend on the availability of halon in the few countries that supply the aviation industry as a whole, and not on stocks within their own States M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

18 ICAO Next Steps ICAO is considering setting Cargo Bay timeframes to mandate the implementation of halon alternatives Cargo Bays are the largest use of halon in aviation Until timeframes are set, one cannot estimate total halon needs Civil Aviation still needs to determine…. The long-term needs for halons Where its halon will come from How to report results to Parties to the Montreal Protocol State Letter will be resent to include the Ozone Focal Points in each State M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , G e n e v a

19 Thank you !