PJM©2009 PJM Confidential DOCs # RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation Transmission Operator’s Perspective.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Overview Presented to: Data Privacy Task Force February.
1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
BAL-002-WECC-1 Contingency Reserves
Federal Energy and Environmental Regulation Agencies and Laws
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Electricity Infrastructure: Overview and Issues (2) H. Scott Matthews February 19, 2003.
Energy Resources Human Impact on the Environment.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Federal Energy and Environmental Regulation Agencies and Laws
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Presented to: Eastern RTO/ISO Conference Washington, DC May 11, 2005 The Importance of Teamwork in Multi-Jurisdictional Energy Market Monitoring William.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
1 North American Energy Standards Board EPSA Regulatory Affairs Conference NAESB Activities in the Wholesale Electric Market Washington, DC October 25,
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
Update - RTOs and Capacity January 28, Purpose of Presentation Update the Commission on issues related to – (1) Ameren Missouri – potential Local.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Bulk Power Transmission System
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Successful Restructuring: The Way Forward Mark Bennett Senior Manager of Policy Electric Power Supply Association Restructuring and the Wholesale Market.
Grid Reliability -- Needs of Nuclear Power Plants Joe McClelland, Director Division of Reliability Joint NRC/FERC Meeting April 24, 2006.
Updated 1/28/2011.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Congestion Management in a Market Environment David Nevius Senior Vice President North American Electric Reliability Council.
Grid Modernization in Minnesota Presentation for More Than Smart Webinar Chris Villarreal Minnesota Public Utilities Commission August 4,
Measurement & Verification at the Wholesale Market Level David Kathan FERC NAESB DSM/EE Business Practices Washington, DC April 11, 2007 The author’s views.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Energy. Index Energy Sources Turn Into Energy  Gas power station  Oil power station  Coal power station  Nuclear power station Advantages Disadvantages.
Office of Market Oversight & Investigations Comments by the speaker do not necessarily reflect those of the Commission Data Collection And Access At FERC.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
EE/Econ 458 Market Overview: Time-Line and SCUC, RAC, SCED J. McCalley 1.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
PJM©2013 Cyber Threats to the Electric Power Grid Steven McElwee October 16, Copyright © 2013 by PJM Interconnection, LLC.
FERC’s Division of Reliability Federal Energy Regulatory Commission – Open Meeting Washington, DC October 6, 2004 Joseph H. McClelland Director, Division.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Federal Energy and Environmental Regulation Agencies and Laws
Wind Management at MISO
Interchange Scheduling & Accounting Subcommittee
North American Markets Status
Module 4 Smart Grid Implementation Issues
Impacts and Actions Resulting from the August 14, 2003 Blackout
Presentation transcript:

PJM©2009 PJM Confidential DOCs # RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation Transmission Operator’s Perspective Frank J. Koza Executive Director, System Operations PJM Interconnection NRC RIC Conference Rockville, MD March 11, 2009

PJM© PJM Confidential DOCs # PJM Overview * Susequhanna 1&2 * Oyster Creek * Limerick 1&2 * Peach Botton 2&3 * Calvert Cliffs 1&2 * Beaver Valley 1&2 * DC Cook 1&2* Byron 1&2 * Quad Cities 1&2 * Braidwood 1&2 * LaSalle 1&2 * Surry 1&2 * North Anna 1&2 * TMI 2 * Salem1&2; Hope Creek

PJM© PJM Confidential DOCs # PJM Energy Market PJM Generation by Fuel Source (GWh) in 2008 GWhPercent Coal Oil Gas Nuclear Solid Waste Hydroelectric Wind Solar00 Total % of PJM’s energy comes from coal and nuclear generation, with nuclear providing 35% of the total PJM supplies about 15% of the total United States load

PJM© PJM Confidential DOCs # Objective Simultaneously, with zero error tolerance, at all times, Preserve transmission system reliability – NERC and Regional Standards Support nuclear owner/licensee requirements to ensure nuclear safety – USNRC requirements Operate fair and impartial wholesale energy markets – FERC requirements and NAESB Business Practices

PJM© PJM Confidential DOCs # Example: Voltage Control NERC Standards require PJM to operate within thermal, voltage, and stability limits; and implement corrective action on a timely basis, as shown here for voltage limits.

PJM© PJM Confidential DOCs # Voltage Control for Nuclear Plants Some nuclear power plants (NPPs) in PJM have more restrictive post-contingency voltage limits than the default limits for the unit trip –PJM Energy Management System (EMS) is calculating post-contingency voltages every minute, via a simulation (real time contingency analysis -- RTCA) –If the simulation shows an violation of the limit, then the nuclear plant is notified and options are discussed –Nuclear plant can opt for: (1) generation redispatch or (2) take corrective action inside the plant

PJM© PJM Confidential DOCs # Market Operations PJM required to operate fair and open energy markets –Day Ahead Energy (DA) –Real Time Energy (RT) –Ancillary Services Synchonized Reserves Regulation Market operations are subject to FERC Office of Enforcement oversight and are to be operated in accordance with North American Energy Standards Board (NAESB) Business Practices

PJM© PJM Confidential DOCs # Market Operations Summary Over 1500 generators participating in PJM Markets Total production cost in 2008 = $21-Billion! NPPs are “price takers”, they are the lowest cost producers in the market, and only tangentially involved with real time market operations

PJM© PJM Confidential DOCs # PJM Participation with the Regulatory Entities NERC –Standards development –Event investigation –Technical committee participation NAESB –Business Practice development PJM Nuclear Owners/Operators Users Group –Develop processes to support NPP needs and support mutual understanding of grid and NPP design and operational requirements USNRC –Assist PJM licensees on grid issues FERC – –Provide real time information for monitoring

PJM© PJM Confidential DOCs # NERC Standard NUC-001 Goal: Ensure nuclear safety objectives are met by incorporating nuclear-identified requirements into transmission planning and operations PJM and licensee activities –Standard development (PJM and PJM licensees participated) –Develop procedures and processes for the communication of NUC-001 Nuclear Plant Interface Requirements (NPIRs) to the transmission entities (Nuclear Owners/Operators Users Group)