Lincoln Heights Storm Drainage Improvement Project Armstrong Glen May 6, 2014 Beatties Ford Road Regional Library Existing Conditions Public Meeting Steven.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
Advertisements

Erosion & Sediment Control Program Steven Gucciardi, CPESC
City of Sunset Valley Drainage Master Plan Assessment Final Recommendation Report March 24, 2009.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
EWP Emergency Watershed Protection1 N R C S Emergency Watershed Protection Program.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
U.S. 33 Northern Connector Alternative
Public Open House February 6, Study Overview - Study Area South North.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
STORMWATER MANAGEMENT PROGRAM UPDATE July 23, 2014.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
Crestmoor Neighborhood Reconstruction Project Community Meeting January 26, 2012.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Windows to the Lake Public Engagement for Green St., Market St., & St.Paul St.
Certification Requirements
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
1. 2 Managing stormwater Stormwater runoff is generated when rain and snowmelt flows over land or impervious surfaces and does not percolate into the.
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting [date] V [COMMUNITY NAME] FLOOD MAP MODERNIZATION.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
PARSONS – KIMBRO BRIDGE PROJECT Parsons Road – Old Kimbro Road Bridge Project Travis County, TX Neighborhood Meeting Wednesday, September 23, 2009.
Raw and Finished Water System Improvements April 22, 2014.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
California Coastal Commission Appeal A-1-MEN (Wernette) De Novo Hearing.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Department of Public Works Submittal of Comments to the County of Los Angeles on the Draft Environmental Impact Report and Proposed Alternatives for the.
Bitter Creek Stream Restoration Preliminary Engineering Report Neighborhood Meeting.
Options to Address Stormwater, Road and Septic Issues.
The Rezoning Process CHARLOTTE-MECKLENBURG PLANNING.
SURF BEACH CATCHMENT, KIAMA Floodplain Risk Management Study & Draft Plan Community Information Newsletter March 2016 The study area investigated in the.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Storm Water Management A report to City Council March 2006.
Stormwater Management
Board of Commissioners Meeting
View display boards and speak one-on-one with staff
CDBG-DR Public Meeting Thursday September 14, 2017
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
US 181 Harbor Bridge Project
Babcock Basin-Design Phase
Beverly HIlls Proposed Sewer Improvement Project
Measure A Financial Oversight Committee August 7, 2013
Watershed Task Force meeting
Participatory Road Program neighborhood meeting Donahoo 174th Street
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Study of Miles City Slough
RDC Maintenance Advisory Panel: Purpose & Over View
S.R. 26 Road Rehabilitation in Clinton County
2019 Saddlebag Creek Ranches Home Owners Association Annual Meeting
Meadow Lane – Brandon Road Improvements Welcome!
Town of Atherton Storm Drainage Study Updates 1st Public Meeting February 6, 2014 Storm Drainage Study Updates and Related Services.
Biltmore C Proposed Water & Sewer Improvement Project
Public Engagement for Green St., Market St., & St.Paul St.
Stream Crossing Replacement Policy
Design and Engineering Services
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Presentation transcript:

Lincoln Heights Storm Drainage Improvement Project Armstrong Glen May 6, 2014 Beatties Ford Road Regional Library Existing Conditions Public Meeting Steven McCraney – Project Manager Phone – –

WELCOME AND INTRODUCTIONS Charlotte-Mecklenburg Storm Water Services (CMSWS) Staff Steven McCraney– Project Manager Phone: Doug Lozner– Watershed Area Manager Armstrong Glen Staff Josh Letourneau – Project Manager Russell Parker– Project Engineer Charlotte-Mecklenburg Storm Water Services (CMSWS) Staff Steven McCraney– Project Manager Phone: Doug Lozner– Watershed Area Manager Armstrong Glen Staff Josh Letourneau – Project Manager Russell Parker– Project Engineer Armstrong Glen

MEETING PURPOSE Provide a summary of the Existing Conditions analysis. Request input from property owners/residents on the Existing Conditions analysis results. Obtain additional information from property owners/residents on perceived drainage issues. Provide a summary of the Existing Conditions analysis. Request input from property owners/residents on the Existing Conditions analysis results. Obtain additional information from property owners/residents on perceived drainage issues.

MEETING AGENDA Project Selection and Citizen Involvement Existing Conditions Analysis Summary Future Project Milestones – Path Forward General Questions and Comments Project Selection and Citizen Involvement Existing Conditions Analysis Summary Future Project Milestones – Path Forward General Questions and Comments

Why was the Lincoln Heights area chosen? Requests for service from property owners 56 TOTAL REQUESTS REPORTED TO 311 IN THIS NEIGHBORHOOD Example Requests: Inadequate and Deteriorating Infrastructure Road Flooding First Floor & Crawl Space Flooding Old Culverts, Pipes, Inlets Sink Holes Erosion, Blockages in Streams Larger watershed-wide issues that cannot be managed by spot repairs or without potentially impacting downstream properties Requests for service from property owners 56 TOTAL REQUESTS REPORTED TO 311 IN THIS NEIGHBORHOOD Example Requests: Inadequate and Deteriorating Infrastructure Road Flooding First Floor & Crawl Space Flooding Old Culverts, Pipes, Inlets Sink Holes Erosion, Blockages in Streams Larger watershed-wide issues that cannot be managed by spot repairs or without potentially impacting downstream properties PROJECT SELECTION AND CITIZEN INVOLVEMENT

Presented by: Armstrong Glen, P.C. Civil Engineers LINCOLN HEIGHTS STORM DRAINAGE IMPROVEMENT PROJECT LINCOLN HEIGHTS STORM DRAINAGE IMPROVEMENT PROJECT Existing Conditions Analysis Results

EXISTING CONDITIONS RESULTS MAP Highlights undersized storm systems Highlights storm systems that are structurally deficient. (determined from pipe video) Summarizes 311 Requests filed by residents. Highlights undersized storm systems Highlights storm systems that are structurally deficient. (determined from pipe video) Summarizes 311 Requests filed by residents.

EXISTING CONDITIONS RESULTS MAP GILBERT ST. HOLLY ST. NEWLAND RD.

EXISTING CONDITIONS RESULTS MAP AUGUSTA ST. MADRID ST. CUSTER ST. LA SALLE ST. GARNETTE PL.

CATHERINE SIMMONS AVE. HAINES ST. IRMA ST. JENNINGS ST. NEWLAND RD. KENNESAW DR. LA SALLE ST.. ERIE ST. EXISTING CONDITIONS RESULTS MAP

NEWLAND RD.. ODESSA AVE. KENNESAW DR. JENNINGS ST. MADRID ST.

STORM DRAINAGE IMPROVEMENT PROJECT PHASES PLANNING (Typically 12 to 27 months) Existing Conditions Analysis – Finding the Problems (Current Phase) Alternative Analysis – Developing Alternative Improvements DESIGN (Typically 21 to 34 months) Designing the Improvements PERMITTING (Typically 9 months, but usually overlaps the design phase) EASEMENT ACQUISITION (Typically 12+ months) BID (Typically 5 to 6 months) CONSTRUCTION (From 1 to 2+ years) PLANNING (Typically 12 to 27 months) Existing Conditions Analysis – Finding the Problems (Current Phase) Alternative Analysis – Developing Alternative Improvements DESIGN (Typically 21 to 34 months) Designing the Improvements PERMITTING (Typically 9 months, but usually overlaps the design phase) EASEMENT ACQUISITION (Typically 12+ months) BID (Typically 5 to 6 months) CONSTRUCTION (From 1 to 2+ years)

PATH FOWARD Additional information obtained during this meeting will be considered and incorporated into the existing conditions analysis, where applicable. Alternatives will be evaluated, and a recommended alternative will be developed. Charlotte-Mecklenburg Storm Water Services will hold a second public meeting to present and obtain feedback on the recommended alternative. Additional information obtained during this meeting will be considered and incorporated into the existing conditions analysis, where applicable. Alternatives will be evaluated, and a recommended alternative will be developed. Charlotte-Mecklenburg Storm Water Services will hold a second public meeting to present and obtain feedback on the recommended alternative.

Questions? Thank you for coming to the meeting! Please remember to sign-in and fill out a customer service card. Thank you for coming to the meeting! Please remember to sign-in and fill out a customer service card.