1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.

Slides:



Advertisements
Similar presentations
Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Laurent Locatelli LHCb CERN Calo commissioning meeting 16th April 2008 Trigger Validation Board PVSS control status 1.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
TELL1 command line tools Guido Haefeli EPFL, Lausanne Tutorial for TELL1 users : 25.February
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
M.N Minard Trigger Validation Board Status Cyril Drancourt, Pierre-Yves David,Victor Coco, M.N Minard - Production status - TVB tests on Cryo side.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Analog FE circuitry simulation
SCADA for Remote Industrial Plant
Injectors BLM system: PS Ring installation at EYETS
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and HV Status bits board for ODIN LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ]

2 Firmware upgrade of the HV_LED_DAC boards Last weeks a firmware upgrade of the ACTEL FPGAs of the HV control boards have been done. Reason of the Control Logic mezzanines FPGA firmware upgrade The reason was to make the HV board initialization sequence in powering time more intelligent and safety for CW bases and the HV control boards. New firmware allows In powering-on time all DAC integrated circuits set to zero, the over-current protection relays set to ON and after a second the auto-protection hardware monitoring is automatically started. The time gap of order one sec is needed to exclude transitional current changes. Summary New firmware Version 7.0 has been developed (it’s shown on HV-control panel now). 43 HV_LED_DAC control boards were upgraded and tested in last two weeks. The Maraton LV and Agilent MV power supplies, dedicated to DCS partition, could be switch on now simultaneously from the CALO FSM top level tree.

3 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Firmware upgrade of the HV_LED_DAC boards Maraton LV PS Agilent MV PS Time sequence of the LV and MV supplies switching on, when the command “Switch_ON” is issued from the top of the FSM DCS partition (project CA1):  Command is propagated to each CALO sub-detectors.  LV and MV power supplies are switching on sequentially. LV is switching first with updated sequence and then in about 20 sec the MV is switched on too. Screen-short of the CALO DCS panels shows how a “Switch ON” command goes from top to bottom. “Switch – ON” command 1 sec 20 sec HV_board READY Firmware Delay Software Delay

4 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Firmware upgrade of the HV_LED_DAC boards New procedure of the CALO HV system recovery after power cut. Check FSM DCS tree is functional. Open the “CALO HV Status” panel. From FSM top level switch on all DCS power supplies for sub-detectors. (previous slide) Restart all CALO HV projects (PRSHVC1, PRSHVA1, ECHVC1, ECHVA1, HCHVC1,HCHVA1). There are two ways to do this. One is from Service+ of the dedicated online PCs and other one from shortcuts of the DetHVC1_Console Switch on the HV with needed recipe. Screen-short of the ECAL side C HV project console Last time the HV recovering after power cuts was rather painful !

5 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] CALO HV Status bits for ODIN ( hardware) HVSB board functionality:  Fast measurement MV power supply currents.  Produce the LVDS signals to the ODIN supervisor in case when the power current is out of range. Two decision bits are dedicated to each sub-detector (one bit per sub-detector side).  Board is equipped with DACs, comparators and logic CPLD.  The Specs mezzanine is used for DC levels measurement by DCU-ADC and communication with ECS. The CALO sub-detector HV Status Bit board has been developed, produced and tested. The solution is based on the MV power supply current measurement and sending the logical decision to ODIN supervisor for producing the data quality bits. Connectors to MV power supplies RJ45 connectors to ODIN supervisor Final photo of the HVSB board.

6 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Photo of the Agilent power supplies and HV Status Bit board installation into the rack. Additional LV +5 V Agilent power supply for HVSB board powering CALO HV Status bits for ODIN ( hardware) Final installation

7 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] CALO HV Status bits for ODIN ( firmware) Firmware  The MAX-II ALTERA logic CPLD EPM240 has been chosen for implementation of logic function for producing a decision to ODIN supervisor.  Logic implemented inside CPLD allows to mask any input channels, make needed coincidence and produce a decision output signal for each sub-detector.  CPLD communicates with SPECS mezzanine through the PBUS. List of the SPECS commands: PBUS write/read of the four 16 bit channel mask registers; PBUS write/read operation of the CSR (Status/Control Register); DCU read commands for six analog outputs of the current shunt circuits; I2C write/read operation for 12 DAC threshold settings integrated circuits.

8 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Integration to ECS I. HVSB board must be configured in initialization time and monitoring in run time. To allow to do this, the board was integrated into the CALO HV project. The following PC and PVSS project are used for HVSB board integration into ECS: HCDAQHVC01W PC has spares Specs ports and one of them is used now for interconnection with HVSB board. HCAL HV project HCHVC1 has been modified and additional device units CA_HVstatBrd and CA_HVstatDAC were build for HVSB board and added to this project. HVSB board configuration is performed simultaneously with HV settings load. CALO HV Status bits for ODIN ( software) Updated DEN panel of the HCHVC1 project

9 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Integration to ECS II. CALO HV Status bits for ODIN ( software) HVSB board is powering from the Agilent +5V power supply. For control and monitoring this power supply it was integrated to CADCSMV project. The control unit CA_STATUS_LV and DIM server “agilent_serverPS5” were added into the project. Agilent power supply was registered into Online DB with following parameters: IP: /psagil04.lbdaq.cern.ch/ MAC address: 00 – 03 – D3 – 0C – BA – 97 Updated DEN panel of the CADCSMV project

10 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] CALO HV Status bits for ODIN Screen short of the panel for CALO HV status Bits board monitoring and control Click on the button for open Panel. Measured Currents Min-Max Thresholds Final HV Status The Status is green when the power supply current is into a range between Min and Max threshold

11 Conclusion  Firmware upgrade of the CALO HV boards have been done. Now the procedure of the HV system recovering after power cut is much simple.  The electronic board HVSB for monitoring the middle voltage currents and generating two status bits per each sub-detector for ODIN supervisor has been developed.  Two PCBs have been produced and one assembled, tested ant installed in D3.  First version of a firmware for the control logic ALTERA MAX-II CPLD was developed and loaded.  LV power supply with additional cabling have been installed into the rack of the barrack D3 and integrated to ECS.  The designed HVSB board has been integrated to existing PVSS project and dedicated panel for the board settings developed too. Planning  Make a system test of the HVSB board with ODIN supervisor. CALO HV Status bits for ODIN LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ]