26 November 2007 Revision 4 RCM2 Case Study Project Plan Cooling Fan System (topic link)

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

RCM-Tool v1.0 Demo Performing Welcome to the RCM-Tool RCM-Tool
Account Planning The purpose of these slides is to describe the Account Planning Process, the methodology, and the workload involved in running an account.
Deconstructing Moodle for better Learning Design Helen M. Lynch Senior E-learning Consultant Australia’s National VET E-learning Strategy Webinar, March.
1 Unit & District Tools Phase 1. 2 To access the new Unit and District Tools, you will need to click on the link embedded in the MyScouting Flash page.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Root Cause Analysis Workshop Pima Medical Institute, Albuquerque, New Mexico Friday; May 18, 2007; 8:30 am.
EE 496 Poster Session Instructions Rev. 2/9/15 WS.
CSE 111: Object Oriented Design. Design “To program is human but to design is divine” (WEH)
» Teaching an online class, what takes up most of your time?
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Process Modeling SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Meeting Skills.
Effectively applying ISO9001:2000 clauses 5 and 8
DCT 1123 PROBLEM SOLVING & ALGORITHMS INTRODUCTION TO PROGRAMMING.
Outcome: Talking The candidate will: Take part in straightforward interactions, by: Select ideas and content using a format and structure appropriate to.
Incident Reporting Procedure
The Software Development Life Cycle: An Overview
Collaborating in the Workplace C H A P T E R 3. In What Settings Do Employees Write Collaboratively? How Do You Manage a Project? How Do You Conduct Effective.
Developing writing/speaking skills on Yahoo discussion groups.
Clarity Educational Community How Companies Are Using CA PPM for Application Portfolio Management Presented by: Mark Feher | Date.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Managing Project Through Information System.  Monitoring is collecting, recording, and reporting information concerning any and all aspects of project.
Essential SNA Project being developed from 2011 to 2013.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Welcome to the Modern Studies assignment 2.. Learning Intentions You will learn to organise your time and meet deadlines Plan research; choose an appropriate.
KICK – OFF MEETING, CRACOW COMMUNICATION PROCEDURES.
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
Lead Black Slide Powered by DeSiaMore1. 2 Chapter 8 Personal Productivity and Problem Solving.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System (topic link)
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Research & Technology Implementation TxDOT RTI OFFICE.
UNIT II RCM PROCESS Module 2 PLANNING AND PREPARATION " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
COURSE INTRODUCTION BUSINESS ENGLISH 2. Lecturer: BOGLARKA KISS KULENOVIĆ Office hours: Tuesday: 10:00 – 12:00 1 more hour to be set for meetings Room:
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
The Lesson PlanningProcess The BLaST IU17 Liberty Fellowship September 20, 2011 Dr. Fran Macko
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Overview: 1.Past project review 2.How to communicate with clients 1.Clients taste in design 2.How to avoid misunderstandings w/client or project manager.
ISO Registration Common Areas of Nonconformances.
CM220 College Composition II Friday, January 29, Unit 1: Introduction to Effective Academic and Professional Writing Unit 1 Lori Martindale, Instructor.
09 November 2007 Revision 3 RCM2 Case Study Project Plan Cooling Fan System (topic link)
Implementing a Writer’s Workshop
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
04 October 2007 Revision 1 RCM2 Case Study Project Plan Cooling Fan System (topic link)
Failure Modes and Effects Analysis (FMEA)
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Technical Report Writing Dr. Shelley Thomas. Overview Selecting effective report topics Using worksheets to plan projects Developing and proposing project.
The Project Management Process Groups
EE 496 Poster Session Instructions Rev. 4/3/16 WS.
INTRODUCTION to Operations Management MT435 – 02 Week 1 Instructor – Dr. Stuart Childers 1-1.
Welcome to Introduction to Psychology! Let’s share a bit about where we are all from…
Knowledge Hub Walkthrough August
Advanced Higher Computing Science
Unit & District Tools Phase 1
Incident Reporting And Investigation Program
Information Systems in Organizations 2
Project Management PTM721S
JOB, ROLE, COMPETENCY AND SKILLS ANALYSIS
RCM Turbo SQL Version.
FMEA.
Systems Analysis and Design
Our purpose is highest quality education in a safe and stimulating environment.   Inspiring students to learn, grow and achieve in an environment that.
GCSE Revision In response to a large number of Y11 students asking for advice on how to revise….. Introduction & revision planning Revision techniques.
Unit I Module 3 - RCM Terminology and Concepts
Database Management system
Connecting the Dots Between News Article
Presentation transcript:

26 November 2007 Revision 4 RCM2 Case Study Project Plan Cooling Fan System (topic link) link)

Content Introduction Why this study Output Team Planning System boundaries Functional Block diagram & Major Equipment Key information Let’s get started

Introduction From within the Maintenance Forum the initiative was born to conduct a “Virtual RCM” study to learn and share knowledge in an interactive way. A Case & Operating Context is defined for the Company Ollie’s Olefins based on business impact/criticality. There are a lot of methods which are called RCM In this study the RCM2 methodology of John Moubray will be applied

Goal and output Make a maintenance plan which preserve the functions of the chosen Cooling Fan System throughout the technologically useful live by selecting and applying the most cost effective technique for managing failures and their consequences Output: -Maintenance schema -Operator Care Instruction -Modifications (can also be operational procedure)

Team Facilitator: Rogier Team members: (list to be defined) It is nice to have a fixed team giving input during all steps to prevent having discussions all over again.

Planning The project kick-off is in week 41 after publishing project plan on forum Minimum 1 session a week depending on input A live chat or telecom can be organised to discuss different views if necessary Estimated time needed is 11 sessions, completion date end 2007 Participant are assumed to have basic RCM knowledge starting the study Session Content Kick off – Setup project and team1 session (WK 42) Functions and performance standards1 sessions Functional Failures & Failure Modes2 sessions Failure Effects2 sessions Failure Consequences 2 sessions The RCM Task Selection Process3 sessions Spare2 sessions Finalizing report by facilitator 1 week

System Selection (Boundary)

Funct. Block diagram & Major Equipement

Key information Plant located on island near to sea Operation 24h/7 days a week /365 day’s a year It can sell all product it can make 30 equal systems in production unit System supplies ambient air to refrigeration system Performance indicator: If fan < 200 RPM audible alarm sounds in control room Revenue loss of $5000 per hour if one system down for > 30 min System cost a lot of maintenance hours due to breakdown disturbing the process (how much cost / failure history?)

Let’s get started -Who is willing to be part of the team? -let share addresses within the team, mail me your address please? -When the team is complete I will setup a platform to share / add remark or something to be able to give your input when it suits your agenda -We are in different time zone's I think, so live discussion can be a problem, Can we make an overview of possibilities when to discuss /chat live? -To share learning's everyone get’s read rights on chosen platform and only team member write rights All information needed for study will documented and posted -Final Result per session will be post on maintenanceforum to share learning -English is not everyone’s native language so can give misunderstanding, treat everyone with respect, lets focus on the big picture and not argue about minor language details.

Step 1 functions -Step 1 – Describing Functions We have enough information to start with defining the function A function statement should consist of a verb, an object and a desired standard of performance If we miss relevant information it will be an action point for someone to retrieve of we make a decision as a group We can use the template supplied by Rolly12 Other steps will be added during the study

Step 1 functions Primary functions: What's the main reason the asset exist? Secondary functions: Asset is expected to fulfill one ore more functions in addition to their primary function To help none of these functions is overlooked they are diveided in 7 categories (ESCAPES): - Environmental integrity - Safety/structural integrity - Control/containment/comfort - Appearance - Protection - Economy/Efficiency - Superfluous functions One of the most mistakes in the RCM process is carrying out the analysis on too low level in the equipment hierarchy.

Step 2 Functional Failures Step 2 – Describing Functional Failures A functional failure is defined as the inability of any asset to fulfil a function to a standard of performance which is acceptable to the user Functional Failures can be placed under the following headings: partial and total failure Upper and lower limits Gauges and indicators The operating context

Step 2 Functional Failures Who shoulls set the standard?

Step 3 Failure Modes A failure mode is any event which causes a functional failure A failure mode description should at the very least consist of a noun and a verb i.e. Bearing seizes A list of reasonably likely failure modes should include: failures which have occurred before failure modes which are already the subject of proactive maintenance routines any other failure mode which have not yet occurred but which are considered to be real possibilities

Step 3 Failure Modes How much detail? failure modes should be defined in enough detail for it to be possible to select a suitable failure management policy

Step 4 Failure Effect failure effect describes what happens when a failure mode occurs