Review of Blasting Procedures 1 Utah Regulatory Program Evaluation Year 2002 Review of Blasting Procedures to Ensure Public Notice, Public Participation,

Slides:



Advertisements
Similar presentations
Division of Reclamation December 4, Signs and Markers Place at all entrances to the permit area from public roads conspicuous signs which state.
Advertisements

Surface Mining Control Reclamation Act Michael Dashefsky Period: 4 Bodas.
Surface mining control and reclamation act of 1977 Draft Year: 1977 Amendment Years: The Abandoned Mine Reclamation Act of 1990 amended this act. This.
Surface Mining Control and Reclamation Act of 1977 By Nadia Farjood Period 6.
Surface Mine Safety Regulation 25 PA Code Chapter 209.
Introduction to Records Management Policy
Auditing, Assurance and Governance in Local Government
NARUC/NIGERIA REGULATORY PARTNERSHIP Peer Review Presented by Elijah Abinah Assistant Director Public Utilities Division Arizona Corporation Commission.
Blasting Regulations Division of Reclamation Indiana Department of Natural Resources.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
Notice of Compliance Audit
Done by: Abdulrahman A. Al-Hussain I.D Done for: Prof. Abdulaziz Bubshait Term 082 – June 2009 King Fahd University of Petroleum and Minerals.
Proposed Rules to Help Ensure the Safety of Imported Food 1.
1 | Weatherization Assistance Programeere.energy.gov Eric Bell 1 Federal/State Monitoring 2010 Orientation for State WAP Directors and Staff.
SURFACE MINING CONTROL AND RECLAMATION ACT OF 1977 Rosemary Newsome.
Office of Surface Mining Reclamation and Enforcement MissionEnsure that coal mines are operated in a manner that protects citizens and the environment.
Office of Assessment October 22, Legislative Update  Delaware House Bill 334 Bill provides for the transition of the statewide student assessment.
Academic Office: We are a collaborative team that supports student learning. 1 Presented by Academic Office Multilingual Literacy Department English Learner.
9 Closing the Project Teaching Strategies
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
After the Sanitary Survey
Title V Program Evaluations 1 st Round Overview Gregg Worley Section Chief Air Permits Section EPA Region IV.
SAFM 550 Loss Control and Recovery NOTE: On all parts of the insurance presentation you must click on the little speaker on each “slide” in order to hear.
The KwaZulu-Natal Planning and Development Act APPLICATION PROCESS Schedule 1.
Blasting Regulations Proposed Changes to The Existing Ordinance.
ISEE PUBLIC EDUCATION AND PUBLIC RELATIONS COMMITTEE PR AT THE DOORSTEP Presents Chairmen: Kenneth K. Eltschlager and David Harrison.
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Mine Map Archiving in Utah. IMCC/MSHA Benchmarking Workshop Louisville, Kentucky October 15-16, 2003 Wayne Western, Reclamation Specialist Utah Division.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
The Jordan Performance Appraisal System (JPAS) is designed to help educators in their continuing efforts to provide high quality instruction to all students.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
P1 External Quality Assessment (EQA) Proficiency Testing.
1 Standard Test Administration Testing Ethics Training PowerPoint Spring 2011 Utah State Office of Education.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
PRESENTATION FOR SENIOR EXECUTIVES Developing empathy.
Electric Powerlines: Design and Construction to Minimize Hazards to Raptors Tonya Buckmaster (OSM-WRCC), Pete Hess (DOGM), Howard Strand (OSM-WRCC), and.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
On-Site Registration /Accreditation Caravan Project Guidelines
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Surveys, Proposed Mining Regulations and other things… Presented to ARIPPA on April 24, 2007 by Dave Goss, Executive Director American Coal Ash Association.
UPDATING RIGHT OF WAY MANUALS FLORIDA’S PROCEDURES.
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Construction Inspection for Field Office Activities Welcome by SCE Introductions Name Position (SCT, SC, DC, CET, ETC) Location Instructors 1.
Miners Rights Rights & Responsibilities Under the Mine Safety & Health Act of 1977 NC DOL Mine & Quarry Bureau Mine Safety & Health Training Revised 2010.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
HISTORY OF MINE SAFETY AND HEALTH LEGISLATION
Overview of SACS-COC Reaffirmation Process Prepared for Reaffirmation Steering Committee April 10, 2006.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
District Validation Review (DVR) Nonpublic School Preparation Information Division of Special Education.
Surface Mining Control and Reclamation Act of 1977
Introduction to the Definition of Solid Waste Final Rule
School Guidance and Adjustment Counseling CAGS Program
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Surface Mining Control And Reclamation Act of 1977 (SMCRA)
Witness Assessment AS9104/2A
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Surface Mining Control and Reclamation Act
Haz Mat Incident Considerations
Surface Mining Control and Reclamation Act of 1977 (SMCRA)
Tasks & Grades for MET1.
Effective Project Management: Traditional, Agile, Extreme
Overview of the recommendations on software updates
Presentation transcript:

Review of Blasting Procedures 1 Utah Regulatory Program Evaluation Year 2002 Review of Blasting Procedures to Ensure Public Notice, Public Participation, and Public Safety

Review of Blasting Procedures2 Topic Evaluation Team OSM-- Henry Austin OGM-- Peter Hess, Wayne Western, Daron Haddock

Review of Blasting Procedures3 SMCRA Goal Section 515 (b) (15)  A) provide written notice,  B) maintain a log of the blasts,  C) limit the blasts based on physical conditions of the site,  D) require that blasting be conducted by certified persons,  E) provide for pre-blast surveys

Review of Blasting Procedures4 Reason for Topic Selection  Surface Blasting in Utah has been infrequent  Inception of surface mining in Utah (Whisky Creek Mine)  Will ensure that Customer Service Needs are met by providing public notice, public participation, and public safety.

Review of Blasting Procedures5 Planned Review  Records review covering the last 3 years  3 mines would be chosen to further evaluate.  Records review in DOGM Office  On-Site Evaluation

Review of Blasting Procedures6 Records Review Required blast plan Blast schedule publication and distribution Comments from structure owners (1/2 mile) Pre-blast survey Seismic monitoring records

Review of Blasting Procedures7 On-Site Evaluation  Records Maintained at mine site Blasting logs Blast design and diagrams Notice of publication Blast certification  Blast Warning Signs

Review of Blasting Procedures8 Mines Evaluated  White Oak (Whisky Creek Mine)  Dugout Canyon Mine  Star Point Mine

Review of Blasting Procedures9

10

Review of Blasting Procedures11

Review of Blasting Procedures12

Review of Blasting Procedures13

Review of Blasting Procedures14

Review of Blasting Procedures15

Review of Blasting Procedures16

Review of Blasting Procedures17

Review of Blasting Procedures18

Review of Blasting Procedures19

Review of Blasting Procedures20 CONCLUSIONS  The requirements as they relate to public notice, public participation, and public safety have been met All structures within ½ mile were identified Notification for pre-blast survey and blast schedule were provided to all structure owners. Blasting records including blast designs were maintained. (although evidence of the required written notification could not be produced for two of the mines) Blasting was done by a Utah Certified Blaster.

Review of Blasting Procedures21 RECOMMENDATIONS  DOGM should ensure that plans include provisions for the permittee to provide required written public notifications and provide evidence that the required written notifications were executed in a timely manner.  DOGM should inform permittees that newspaper publication is not required for underground coal mining and reclamation activities.