Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.

Slides:



Advertisements
Similar presentations
Thermoforming Process
Advertisements

Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Arc Welding. Objectives Apply your welding knowledge to construct a butt weld in a group activity with 75% accuracy. Demonstrate how to properly weld.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
MFGT 142 Polymer Processing Chapter 14: Thermoforming
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
BHEL Haridwar. BHEL – A Glance Indian integrated power plant equipment manufacturer, established in Products and services available for Power, Transmission,
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Business Owners and Managers and the Fire Code
Free Powerpoint Templates Page 1 Free Powerpoint Templates Page
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
How is a manufacturing facility planned?
Investment Foundry. TYPES OF FOUNDRY TYPES OF FOUNDRY 1. Sand Foundry 1. Sand Foundry 2. Investment Foundry 2. Investment Foundry Investment Foundry Process.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
T.Schneider/LHCb Muon EDR
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
ME 414: Project #1 Design Team Members: Andy Cash Kyle Bredehoeft Alan Koers Brent Miller Presentation Date: May 5, 2006.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Introduction to Manufacturing Processes Pt. 2 © 2012 Project Lead The Way, Inc.Principles Of Engineering.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
RPC Barrel EDR Chapter 3 3. Production and control of Bakelite 3.1 Definition and standards Standard bakelite electrodes are composed by a bulk made of.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
Company Profile K I C CO., LTD. T A P E O N E
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
ADVANCED PANELMACHINE TYPE ROLLER PRESS CLASSIC LINE THIS IS THE ORIGINAL PRESENTATION WHICH WAS HANDED OVER BY MDI TO THE BUYER OF THE PANELMACHINE IN.
GRPC development in Lyon
European DHCAL Meeting 13/06/08
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Update on Pavia MM mechanical prototype
Quality Control Chamber Production
Production ad Quality control of RPCs for the CMS muon barrel system
1.3-GHz Cavity Vacuum Furnace at IB4
Quality Control in Straw Production
Thermoforming Process
OSHA Most Frequently Cited Serious Violations
STAR TOF MRPC Mass Production & Q.C. (USTC)
NPS mechanical design 11/13/2018 Jlab meeting
Presentation transcript:

Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University

Contents CMS Forward RPC Gaps Mechanics of Forward RPC Gaps Gap Assembly Procedure / Quality Insurance Factory Overview Factory Layout HV/Ground Electrodes Production PET Coating Facility Gap Assembly Facility Gap Test Capacity of Gap production Cost Estimation Production and Delivery Summary

CMS Forward RPC Gaps RE1/1 36 (10 。 Detector) × 2 (L, R) × 3 = 216 RE1/2 36 (10 。 Detector) × 2 (L, R) × 3 = 216 RE1/3 36 (10 。 Detector) × 2 (L, R) × 3 = 216 Spare (10%) 65 RE1 total uncut gaps, 475 cut gaps RE2/1 18 (20 。 Detector) × 2 (L, R) × 3 = 108 RE2/2 36 (10 。 Detector) × 2 (L, R) × 3 = 216 RE2/3 36 (10 。 Detector) × 2 (L, R) × 3 = 216 RE3/1 18 (20 。 Detector) × 2 (L, R) × 2 = 72 RE3/2 36 (10 。 Detector) × 2 (L, R) × 3 = 216 RE3/3 36 (10 。 Detector) × 2 (L, R) × 3 = 216 RE4/1 18 (20 。 Detector) × 2 (L, R) × 2 = 72 RE4/2 36 (10 。 Detector) × 2 (L, R) × 3 = 216 RE4/3 36 (10 。 Detector) × 2 (L, R) × 3 = 216 Spare (10%) = 220 Total uncut gaps, 1611 cut gaps

Mechanics of Forward RPC Gaps RE 1/1 3-D

Vertical Cross Section Edge Spacer Coin Spacer

Gas ConnectionGas Pipe

Gap Assembly Procedure Quality Insurance Bakelite electrode preparation ProcedureQuality Insurance Cut bakelite into right sizeBakelite surface inspection Bakelite resistivity measurement Check the size of bakelite Silk-ink coating on the bakeliteResistivity measurement every batch Protective PET coating over the silk-ink coating

Edge spacer preparation Coin spacer preparation ProcedureQuality Insurance Molding by external venderThickness and width check Thickness : 2.0 ± 0.02 mm Surface scratching with sand paperThickness and width check Thickness : 2.0 ± 0.02 mm ProcedureQuality Insurance Machining by external venderThickness and diameter check Thickness : 2.0 ± 0.02 mm Scratching with sanding machineThickness and diameter check Thickness : 2.0 ± 0.02 mm

Gas inlet/outlet preparation ProcedureQuality Insurance Molding by external venderThickness and hole dimension check Thickness : 2.0 ± 0.02 mm Gap assembly ProcedureQuality Insurance Gluing and assemblyEpoxy lifetime check : 6 months in the refrigerator Amount of glue : guaranteed by the glue dispenser Assemble in the clean room (Class : particles/ft 3 ). Pressurizing device monitoring during curing (14 hours) Pressure : guaranteed by the water height

Factory Overview Located at Ilsan near the Kimpo airport. Two buildings. Each building : 180 m 2. The first building has - Bakelite storage area - Bakelite cutting facility - HV/Ground electrode production facility - Mylar coating facility The second building consists of - Gap assembly facility area (class : particles/ft 3 ) - Chamber assembly tables - Gap and chamber storage area - Chamber testing room Clean shoes inside the factory Clean gap assembly : class : particles/ft 3 Controlled temperature (20 ± 5 Celsius) and humidity (40 ± 10%) - Bakelite, gap and chamber storage area All the other area inside factory : temperature (20 ± 5 Celsius)

Factory Layout

Bakelite Cutting Facility - Cut bakelite weekly - Can cut up to 10 sheets

HV/Ground Electrodes Production Uniformity of resistivity - RE2/1 uncut gap - within 10% - Cell size : 5×5 cm 2

PET Coating Facility Protection of HV and ground electrodes and electrical insulation of HV and ground electrodes. - 2 sheets of 250  m on HV side - 1 sheet of 250  m on ground side The PET coating facility consists of - Free roll conveyor set to guide the bakelite to the laminating set. - Laminating set - Belt conveyor set to guide the mylar coated bakelite from the laminating set The laminating set consists of - PET unwinding roller - Hot melt heater - Nozzle for applying adhesive to bakelite - Knife for keeping adhesive thickness uniformly - Rubber coated roller and steel roller to press the PET film on the bakelite

- Current problem : Weak adhesive strength - Operating temperature of of hot melt glue : ~ 80° C - When hot melt applied to the bakelite, temperature of hot melt drops quickly - We will heat the bakelite with infrared lamp

Gap Assembly Facility The gap assembly facility consists of seven epoxy curing frames, an optical table for gap assembly, a lifting device and a pressurizing device Each epoxy curing frame - consists of an optical table and a gap-pressing device - can cure 1 uncut gaps or 2 cut gaps Gap assembly optical table - designed to produce various sizes of gaps using jigs - attached to the moving frame riding on rail Lifting device moves each assembled gap on the optical table to individual epoxy curing frame Pressurizing device - provides uniform pressure to the assembled gaps during epoxy curing - consists of an air vessel made of special rubber, and air supply equipment which provides air for the air vessel and maintains constant air pressure in the air vessel

Air inlet Pressure Frame Optical table Gap Jig Optical table Pressing device

Spacer grinder Gap storage area

Gap Test TestCriteria Gas leakageLess than 5 hPa leakage for 10 minutes under –20 hPa Epoxy strengthNo loss of coin spacer under +20 hPa for 5 minutes Current Uncut gap : below 1  A Cut gap : below 2  A Gap test facilities are being designed now

Capacity of Gap Production Work hour : 8 hours/day Working days : 250 days/year - Part preparation : 100 days/year - Gap assembly : 150 days/year Gap production capacity (with 6 storages) - The gap assembly facility has 7 storages - 3 uncut gaps/day × 150 days/year = 450 uncut gaps/year - 6 cut gaps/day × 150 days/year = 900 cut gaps/year Total number of gaps for CMS forward RPC uncut gaps, 1610 cut gaps

Cost Estimation SectionGapsAngle (Degree) Unit Price (CHF) Total Number Total Price (CHF) RE1/ ,000 RE1/2,33101, ,000 Subtotal204,000 RE2/ ,000 RE3,4/ ,000 RE2,3,4/2,33101, ,000 Subtotal560,000 Total764,000 Bakelite cost not included

Production and Delivery Year Month RE 1/1 (80) RE 1/2 (80) Delivery RE 1/3 (80) Delivery RE N/1 (120) RE N/2 (240) Delivery RE N/3 (240) Delivery RE 1/2, RE 1/3 : Delivery to China RE N/2, RE N/3 : Delivery to Pakistan Production capability 9 RPCs/Week, 36 RPCs/Month Schedule

Packing Custom-made box - consists of 4 shelves - 10 sets of gaps on each shelf 1 set : 1 uncut gap, 2 cut gaps Individual packing of 10 sets Shock watch To China : 4 boxes To Pakistan : 12 boxes

Summary Most of the gap production facilities are tested and satisfactory PET coating facility is being tested Facilities for quality insurance and gap test are being designed Funding for RE 1 station has been secured and production schedule has been confirmed by funding agency Funding for other stations has been committed by funding agency, but has no detailed plan