Feasibility studies of open charm reconstruction with pile up 1. General simulations with pile up 2. Open charm reconstruction Christina Dritsa Outline:

Slides:



Advertisements
Similar presentations
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Advertisements

1 Geometry layout studies of the RICH detector in the CBM experiment Elena Belolaptikova Dr. Claudia Hoehne Moscow State Institute of Radioengineering,
Background effect to Vertex Detector and Impact parameter resolution T. Fujikawa(Tohoku Univ.) Feb LC Detector Meeting.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Algorithms and Methods for Particle Identification with ALICE TOF Detector at Very High Particle Multiplicity TOF simulation group B.Zagreev ACAT2002,
Feasibility Studies of Low-mass Mesons Identification for the CBM Project Radosław Karabowicz Hot Matter Physics Department, Institute of Physics, Jagiellonian.
D 0  K -,  + reconstruction with CBM STS detector I.Vassiliev (GSI) CBM collaboration meeting 06-Oct-04 Simulation tools (cbmroot) & geometry Signal.
Status of the Micro Vertex Detector M. Deveaux, Goethe University Frankfurt for the CBM-MVD collaboration.
Status of the Prototype of the CBM Micro Vertex Detector M. Deveaux, Goethe University Frankfurt for the CBM-MVD collaboration.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
Vector meson study for the CBM experiment at FAIR/GSI Anna Kiseleva GSI Germany, PNPI Russia   Motivation   The muon detection system of CBM   Vector.
Simulation activities in India: students working on various topics.. Partha(VECC), Hemen (GU) : Trigger, SIS100, physics simulation Bipasha (CU): dynamic.
C B M Di-electron background studies and first results using compact RICH CBM Collaboration Meeting, 27 September 2007, Dresden Di-electron background.
1 J.M. Heuser et al. CBM Silicon Tracker Requirements for the Silicon Tracking System of CBM Johann M. Heuser, M. Deveaux (GSI) C. Müntz, J. Stroth (University.
Status of the Micro Vertex Detector of the CBM Experiment N. Bialas 1, N. Chon-Sen 2, G. Claus 2, C. Colledani 2, R. De Masi 2, M. Deveaux 1, D. Doering.
Di-electron pair reconstruction CBM Collaboration Meeting, 28 February 2008, GSI-Darmstadt Di-electron pair reconstruction Tetyana Galatyuk GSI-Darmstadt.
CBM Collaboration Meeting 1 Simulation Status V. Friese.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
D 0 Measurement in Cu+Cu Collisions at √s=200GeV at STAR using the Silicon Inner Tracker (SVT+SSD) Sarah LaPointe Wayne State University For the STAR Collaboration.
Simulations with event pile up in MVD 1. Improvement of the MVD-digitiser 2. General simulations with pile up 3. Open charm reconstruction Christina Dritsa.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
1 Realistic top Quark Reconstruction for Vertex Detector Optimisation Talini Pinto Jayawardena (RAL) Kristian Harder (RAL) LCFI Collaboration Meeting 23/09/08.
CBM Software Workshop for Future Challenges in Tracking and Trigger Concepts, GSI, 9 June 2010 Volker Friese.
Charmonium feasibility study F. Guber, E. Karpechev, A.Kurepin, A. Maevskaia Institute for Nuclear Research RAS, Moscow CBM collaboration meeting 11 February.
1 An introduction to radiation hard Monolithic Active Pixel Sensors Or: A tool to measure Secondary Vertices Dennis Doering*, Goethe University Frankfurt.
M. Deveaux, CBM collaboration meeting, Oct. 2008, Dubna, Russia A revision of the concept of the CBM – MVD Or: Do we need an intermediate pixel.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Recent developments on Monolithic Active Pixel Sensors (MAPS) for charged particle tracking. Outline The MAPS sensor (reminder) MIMOSA-22, a fast MAPS-sensor.
Summary STS working group Design optimization STS (Strip) layout R&D (MAPS) Working packages.
Electron pair analysis for high multiplicity events in nucleus- nucleus collisions A.Baldin, E.Baldina, V.Pozdnyakov LHE JINR, Dubna JINR-GSI meeting November.
Status report on the Asian Solid State Tracking R&D March 31, 2003 M. Iwasaki University of Tokyo.
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
Simulations for CBM CBM-India Meeting, Jammu, 12 February 2008 V. Friese
Standalone FLES Package for Event Reconstruction and Selection in CBM DPG Mainz, 21 March 2012 I. Kisel 1,2, I. Kulakov 1, M. Zyzak 1 (for the CBM.
Optimization of the Silicon Tracking System (STS) layout and beam pipe configuration for the CBM experiment. Andrey Chernogorov, Sergey Belogurov, ITEP,
1 A Digitizer for Monolithic Active Pixel Sensors Christina Dritsa 1,2,3, Michael Deveaux 3 1 IPHC, Strasbourg, France 2 GSI, Darmstadt, Germany 2 GSI,
V.Petracek TU Prague, UNI Heidelberg GSI Detection of D +/- hadronic 3-body decays in the CBM experiment ● D +/- K  B. R. 
1 Open charm simulations ( D +, D 0,  + c ) Sts geometry: 2MAPS +6strip (Strasbourg geo) or 2M2H4S (D+ and D - at 25AGeV); TOOLS: signal (D +  K - 
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
Performance simulations with a realistic model of the CBM Silicon Tracking System Silicon tracking for CBM Number of integration components Ladders106.
M. Muniruzzaman University of California Riverside For PHENIX Collaboration Reconstruction of  Mesons in K + K - Channel for Au-Au Collisions at  s NN.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
STS Radiation Environment 11 th CBM Collaboration Meeting GSI, February 2008 Radoslaw Karabowicz GSI.
Muon detection in the CBM experiment at FAIR Andrey Lebedev 1,2 Claudia Höhne 1 Ivan Kisel 1 Anna Kiseleva 3 Gennady Ososkov 2 1 GSI Helmholtzzentrum für.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
20/12/2011Christina Anna Dritsa1 Design of the Micro Vertex Detector of the CBM experiment: Development of a detector response model and feasibility studies.
20/12/2011Christina Anna Dritsa1 The model: Input Charge generation The charge of the cluster is taken by random sampling of the experimental distribution.
CBM-Meet, VECC July 21, Premomoy Ghosh CBM – MUCH Simulation for Low-mass Vector Meson Work done at GSI during June 2006.
Vertex detector update 1 Oct Y. Sugimoto KEK.
D 0 reconstruction: 15 AGeV – 25 AGeV – 35 AGeV M.Deveaux, C.Dritsa, F.Rami IPHC Strasbourg / GSI Darmstadt Outline Motivation Simulation Tools Results.
J/ψ simulations: background studies and first results using a compact RICH detector Alla Maevskaya INR RAS Moscow CBM Collaboration meeting September 2007.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
LIT participation LIT participation Ivanov V.V. Laboratory of Information Technologies Meeting on proposal of the setup preparation for external beams.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Feasibility of the detection of D 0 mesons in the NA61/SHINE experiment: Vertex detector for NA61/SHINE P. Staszel and Yasir Ali Jagiellonian University.
Multi-Strange Hyperons Triggering at SIS 100
IPHC, Strasbourg / GSI, Darmstadt
Updates on vertex detector
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
CBM beam pipe current status
The CBM sensor digitizer
Simulation results for the upgraded RICH detector in the HADES experiment. Semen Lebedev1,3, Jürgen Friese2, Claudia Höhne1, Tobias Kunz2, Jochen Markert4.
5% The CMS all silicon tracker simulation
The LHC collider in Geneva
Simulation study for Forward Calorimeter in LHC-ALICE experiment
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Presentation transcript:

Feasibility studies of open charm reconstruction with pile up 1. General simulations with pile up 2. Open charm reconstruction Christina Dritsa Outline:

General Pile Up simulations GOAL: Study the behaviour of combinatorial background with respect to pile up. Check the efficiency of cuts in different cases before proceeding to a complete feasibility study of open charm measurement.

MIMOSA roadmap for CBM (by Marc Winter) MimoSIS-1: 2D-chip for SIS100 (D mesons in pA collisions) Established AMS 0.35µm process 3 prototypes (2010,2011,2012) final prototype by summer 2012 t Int < 40 µs, rad. tol. ~ 3 x n eq /cm² MimoSIS-2: 2D-chip for SIS300 (D meson in AA collisions) Novel process with small feature size, stitching? t Int < 30 µs, rad. tol. <10 14 n eq /cm² final prototype by 2015 MimoSIS-3 3D-chip for SIS300, phase 2 t Int < 10 µs, rad. tol. ~10 14 n eq /cm² Development start by 2009 final prototype > 2015 if 3D technology works

Motivation of the simulation model Thickness of sensors - Geometry used Thickness of sensors - Geometry used 1 st 5 cm is 300 µm thick 1 st 5 cm is 300 µm thick 2 nd 10 cm is 500 µm thick 2 nd 10 cm is 500 µm thick Pixel pitch : 18.4 × 18.4 µm 2 (From MIMOSA 26) Pixel pitch : 18.4 × 18.4 µm 2 (From MIMOSA 26) StationZ [cm] Thickness [µm] R inner [mm] R outer [mm]

Readout settings Analogue readout ADC 12 bits ADC 12 bits (4096 channels) (4096 channels) 1 electron / channel 1 electron / channel Digital readout ADC 1 bit ADC 1 bit (2 channels) (2 channels) 75 electrons / channel 75 electrons / channel For each setting, three cases were studied: 1.No pile up in MVD ( 1 central Ions ) 2.Pile up of 5 collisions ( 1central + 4 mbias Ions) 3.Pile up of 10 collisions ( 1 central + 9 mbias Ions )

Hit merging and track reconstruction 1: High P track 2: Low P track MVD STS The high P track will be reconstructed first and will “own” the hit. The track parameters will be slightly modified. Hit sharing is not allowed in the MVD: The low momentum track does not “find” the hit. There is a probability to pick up a wrong neighbouring hit (?)

Analogue readout: PV sigma Pile Up Signal Efficiency (PV>3) Background rejection (PV>3) % 99.4 % % 98.0 % % 92.2 %

No pile up 85 % Pile up 5 70 % Pile up % Percentage of D 0 ’s within [-200, 200] µm (shaded area) >95% expected for a Gaussian Secondary Vertex Resolution

Primary Vertex Resolution

Intermediate summary & conclusion The efficiency of the selection cuts with respect to pile up has been studied. The efficiency of the selection cuts with respect to pile up has been studied. The impact parameter distribution (PVsigma) and the secondary vertex resolution suggest that the background rejection with a pile up of 10 collisions is insufficient for an open charm reconstruction with the current CBM setup. The impact parameter distribution (PVsigma) and the secondary vertex resolution suggest that the background rejection with a pile up of 10 collisions is insufficient for an open charm reconstruction with the current CBM setup. Further studies are needed to demonstrate the feasibility of open charm measurement when 5 collisions are piled up in the MVD. Further studies are needed to demonstrate the feasibility of open charm measurement when 5 collisions are piled up in the MVD.

Open charm reconstruction No collision pile up in MVD (only central coll.) No collision pile up in MVD (only central coll.) Pile Up of 5 collisions (1 central + 4 peripheral) Pile Up of 5 collisions (1 central + 4 peripheral)

Expected statistics in CBM Collision rates Collision rates Radiation doses Radiation doses

Expected statistics CBM year: 5·10 6 s ≈ 2 months CBM year: 5·10 6 s ≈ 2 months Assumed sensor time resolution: t int = 30 µs Assumed sensor time resolution: t int = 30 µs * BR=0.038, Multipl. =1.2 ·10 -4 D 0 / centr 25 AGeV 1 central / 10 mbias Collision rate (interactions/s)Collisions/year(mbias) D 0 →π + K - (generated) * No pile up 3 · · Pile up · · Can we measure this statistics before the detector is “dead” from radiation?

Radiation doses in CBM Simulations by M.Deveaux: Old setup (Alligator Field) Delta electrons included Simulations by D.Bertini: Current setup (Muon Field) Delta electrons NOT included Fluence [n eq /cm 2 ] Collisions (mbias) GEANT + GCALOR (2007) FLUKA (2009) · · Nominal Intensity : AuAu: 10 9 p/s · 1% · 5 · 10 6 s = coll/year Collisions (mbias) Fluence [n eq /cm 2 ] MAPS lifetime MAPS lifetime # GEANT + GCALOR (2007) FLUKA (2009) 3· ·10 11 # No pile up 1.5 · pile up · In the studies shown next, normalisation is done according to the corresponding measured statistics for one run.

Setup CBMROOT Oct2009 (trunk) CBMROOT Oct2009 (trunk) Updated tracking performance Updated tracking performance 2 5, 10 cm 2 5, 10 cm 8 STS, staggered strips. 8 STS, staggered strips. Digitisers for MAPS, STS Digitisers for MAPS, STS Delta electrons included Delta electrons included Realistic track finder, track fitter (KF) Realistic track finder, track fitter (KF) 25 AGeV 25 AGeV D 0 → π + + K - D 0 → π + + K - StationZ (cm)R inner [mm]R outer [mm]

Quantities studied Signal-to-BackgroundSignificance Detection efficiency

No pile up Signal in simulation = D 0 Per central collision: 100 Ions (δ e- ), 1 D 0 → π + K - Background in simulation = evts (SE) BR = Multiplicity =1.2 ·10 -4 D 0 / centr 25 AGeV 1 central / 10 mbias Normalise to 1.5·10 10 central collisions ANALOGUE READOUT: 12 bits ADC

No pile up

S/B=2.5 Eff=0,9% Signif=21 [1/150 MeV/c 2 ]

No pile up: Rapidity coverage Input Signal Pt-Y Output Signal Pt-Y (after cuts)

Pile up 5 Signal in simulation = D 0 Per central collision: 100 Ions (δ e- ), 1 D 0 → π + K - Background in simulation = evts (SE) BR = Multiplicity =1.2 ·10 -4 D 0 / centr 25 AGeV 1 central / 10 mbias Normalise to 7.5·10 10 central collisions BINARY READOUT: 1 bit ADC

Pile Up 5

Pile Up 5: Fitting of Si & Bg S/B=0.6 Sign=26 Det.Eff=0.55% (1700 D 0 expected)

Pile Up 5: Rapidity coverage Input After cuts

Significance

Summary The effect of pile up on the track reconstruction has been studied. The effect of pile up on the track reconstruction has been studied. The simulation setup was chosen according to the most updated estimations on the parameters of the MVD (pitch, t int, mat. budget) The simulation setup was chosen according to the most updated estimations on the parameters of the MVD (pitch, t int, mat. budget) The feasibility of open charm measurement has been investigated for two scenarios: The feasibility of open charm measurement has been investigated for two scenarios: No pile up and analogue readout Pile up 5 and digital readout

… and Conclusion (1) Due to the relatively long t int ( = 30 µs ) of the MVD, it is important to operate with pile up and measure higher statistics of D 0 particles. Due to the relatively long t int ( = 30 µs ) of the MVD, it is important to operate with pile up and measure higher statistics of D 0 particles. The event pile up causes a high occupancy in the MVD and introduces difficulties in the track reconstruction. The event pile up causes a high occupancy in the MVD and introduces difficulties in the track reconstruction. The loss in precision of the track reconstruction causes a drop in the efficiency of the selection cuts with increasing pile up. The loss in precision of the track reconstruction causes a drop in the efficiency of the selection cuts with increasing pile up.

… and Conclusion (2) The inefficiency of cuts suggests that open charm measurement with pile up of 10 collisions is very difficult with the current CBM setup. The inefficiency of cuts suggests that open charm measurement with pile up of 10 collisions is very difficult with the current CBM setup. Open charm reconstruction with a pile up of 5 collisions shows higher significance but very low S/B with respect to no pile up. Open charm reconstruction with a pile up of 5 collisions shows higher significance but very low S/B with respect to no pile up. Further improvements in the CBM setup are needed in order to reject more efficiently the background with increasing pile up. Further improvements in the CBM setup are needed in order to reject more efficiently the background with increasing pile up.

Proposal for improvements : Hardware: Invest effort on R&D for developing a MIMOSIS2 with shorter integration time. Invest effort on R&D for developing a MIMOSIS2 with shorter integration time. Explore different MVD geometries Explore different MVD geometries move the 1 st MVD a few cm more downstream to reduce occupancies move the 1 st MVD a few cm more downstream to reduce occupancies vary detector shapes vary detector shapes Magnetic Field Magnetic Field : Software: Improve the MVD Hit reconstruction algorithm in order to disentangle close hits (pattern recognition) Improve the MVD Hit reconstruction algorithm in order to disentangle close hits (pattern recognition) Adapt tracking to the input of pattern recognition. Adapt tracking to the input of pattern recognition.

Back up

Towards the MVD: HP-2 ULISI Diamond µm ~ 60 (1) -150 (2) µm Si < 200 µm Si ~ 60 (1) -150 (2) µm Si ~ 320 (1) -500 (2) µm Si Metal linesSensorPolyamide Build an ultra thin ladder. Partners: IPHC, IKF, IMEC (1) first MVD station (2) last MVD station M.Deveaux, DPG meeting 2010

Merged Clusters in MVD C. Trageser

Analogue readout: Occupancy Fired pixels / All pixels 5 cm [e-]

S and B calculation

Results for digital readout No pile upPile up 10 In the case of digital readout, the distributions are the same as for the analogue readout. The effect on the single point resolution, introduced by the digital readout, is dominated by the multiple scattering effects.

Simulated incident angle ~100% of particles from primary collision are within -30°<θ<30° 100 Au Ions, 25 AGeV Incident angle (°) >10% of delta electrons are outside -30°<θ<30°

0°15°30° 45°60° 80°

Width defined by : - 0° - 80° V cluster width U cluster width V cluster width Can the inclination of the track be derived from cluster properties? 80° v=u

Pixel multiplicity in cluster

Multiplicity vs aspect ratio Multiplicity Aspect ratio

Secondary Vertex Resolution Only Bg! Secondary vertex resolution for background tracks deteriorates significantly with pile up. This effect might have an impact on the efficiency of the secondary vertex cut.

Tracking Performance (AllSet) ~85 % for tracks with P>1GeV/c Taken from CbmL1Performance.cxx Pile Up 5 Pile Up 10

Momentum reconstruction The reconstruction efficiency of low momentum tracks (<1.5 GeV/c ) is slightly reduced with increasing pile up.

Choice of parameters (MVD) t int = 30 µs t int = 30 µs Pixel pitch : 18.4 × 18.4 µm 2 Pixel pitch : 18.4 × 18.4 µm 2 1 st 5 cm is 300 µm thick 1 st 5 cm is 300 µm thick 2 nd 10 cm is 500 µm thick 2 nd 10 cm is 500 µm thick ~2 mm 0.7 mm

Pile up 5 ADC evts

Pile up 10 ADC evts