DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July, 2-5 2001.

Slides:



Advertisements
Similar presentations
Installation and evaluation of the Globus toolkit WP 1 INFN-GRID Workload management WP 1 DATAGRID WP 2.1 INFN-GRID Massimo Sgaravatto INFN Padova.
Advertisements

INFN & Globus activities Massimo Sgaravatto INFN Padova.
WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group
WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
Work Package 1 Installation and Evaluation of the Globus Toolkit Massimo Sgaravatto INFN Padova.
INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001.
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
IPv6 and IBP storage network and content delivery system over an IPv6 Testbed Gabriella Paolini
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
4/2/2002HEP Globus Testing Request - Jae Yu x Participating in Globus Test-bed Activity for DØGrid UTA HEP group is playing a leading role in establishing.
WP 1 Grid Workload Management Massimo Sgaravatto INFN Padova.
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
GRID workload management system and CMS fall production Massimo Sgaravatto INFN Padova.
Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting,
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN experience with Globus GIS A. Cavalli - F. Semeria INFN Grid Information Services workshop CERN, March 2001.
Magda – Manager for grid-based data Wensheng Deng Physics Applications Software group Brookhaven National Laboratory.
Evaluation of the Globus GRAM Service Massimo Sgaravatto INFN Padova.
INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
The EDG Testbed Deployment Details The European DataGrid Project
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
INFN-GRID Globus evaluation (WP 1) Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
A. Cavalli - F. Semeria INFN Experience With Globus GIS 1 A. Cavalli - F. Semeria INFN First INFN Grid Workshop Catania, 9-11 April 2001 INFN Experience.
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
Grid Workload Management Massimo Sgaravatto INFN Padova.
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
Globus Toolkit Massimo Sgaravatto INFN Padova. Massimo Sgaravatto Introduction Grid Services: LHC regional centres need distributed computing Analyze.
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
Proposal for a IS schema Massimo Sgaravatto INFN Padova.
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
GIIS Implementation and Requirements F. Semeria INFN European Datagrid Conference Amsterdam, 7 March 2001.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
INFN “Grid Information Service” evaluation Giuseppe Lo Biondo - INFN Sez. Di Milano Giulietta Vita Finzi - INFN CNAF Padova June
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
BNL dCache Status and Plan CHEP07: September 2-7, 2007 Zhenping (Jane) Liu for the BNL RACF Storage Group.
A System for Monitoring and Management of Computational Grids Warren Smith Computer Sciences Corporation NASA Ames Research Center.
G. Russo, D. Del Prete, S. Pardi Kick Off Meeting - Isola d'Elba, 2011 May 29th–June 01th A proposal for distributed computing monitoring for SuperB G.
DGAS Distributed Grid Accounting System INFN Workshop /05/1009, Palau Giuseppe Patania Andrea Guarise 6/18/20161.
Workload Management Workpackage
The EDG Testbed Deployment Details
Sergio Fantinel, INFN LNL/PD
INFN – GRID status and activities
Presentation transcript:

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 2 Dedicated resources (available now) Q Quantum Grid: 3-4 PCs in 15 sites: Bari, Bologna, Cagliari, Catania, Cnaf, Ferrara, Lecce, Legnaro, Milano, Napoli, Padova, Parma, Pisa, Roma, Torino Total: ~ 50 nodes Q 1 SUN cluster (5 nodes) at CNAF Q Some more hosts dedicated to specific activities

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 3 Non dedicated resources The LHC experiments have their own farms (~ 100 nodes in 8 sites), dedicated to production activities, in some INFN sites. Since the experiments play a fundamental role in Testbed and some of the test steps will require experiments’ production environment these resources will also be used for Testbed activities (but it is up to the experiments decide when, where and and how).

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 4 Further dedicated resources (available soon) In order to have enough resources available for the Testbed activities 6 new farms have been funded by InfnGrid project. So, in the next months, farms made up of - 1 disk server (~ 300 GB) - 5 dual PIII 1 GHz will be bought and set up in: Catania, Cnaf, Milano, Padova, Pisa and Torino

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 5 How have they been used? The currently available resources have been used for: -Globus Toolkit evaluation activities (a report has been produced) -InfnGrid toolkit production (Globus toolkit + GDMP + support for various CAs + configuration scripts, etc.) -Implementation of the GIS INFN infrastructure (an index server, GIIS, in each INFN unit) -MDS-2 tests (presentation by A. Cavalli in the MDS-2 session, Wednesday 9:00-11:00) -GridFTP tests - “toys” for the site managers

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 6 How have they been used? -LHC experiments’ tests: - ALICE Catania, Cagliari, Torino, Lyon ATLAS Milano, Roma, CERN - CMS Bologna, Padova, Pisa, Roma.... Testbed resources and experiments’ resources have been used for these tests.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 7 How have they been used? Presentations about these activities have been given at the InfnGrid workshop held in Catania (April, 9-11) and in the DataGrid WP8 meeting (May, 31)

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 8 How will they be used? The INFN Testbed resources will be primarily used for InfnGrid Testbed activities and tests. Some of the InfnGrid Testbed activities are also DataGrid activities, some are INFN specific. Some words about them in a few moments… Some guidelines (and tools) to request and allocate the Testbed resources for test purposes have been produced for INFN.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 9 How will they be used? The INFN Testbed resources can also be used for DataGrid Testbed activities. But we need to: - define clearly which resources each DataGrid partner reserves for DataGrid Testbed - define how to manage the allocation and usage of the testbed resources at the DataGrid level (Europe + some USA sites)

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 10 InfnGrid guidelines -The requester (Test Coordinator) submits a form describing the goals and all the relevant information (users involved, needed resources, grid services, etc.) about the test to a technical group, the Planning Group. -The PG evaluates the request and allocates the resources (via the resource database) to the test users, gets the appropriate grid-mapfile from the Certificates database manager and sends it to the site managers.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 11 InfnGrid guidelines -The site managers have the responsibility to install the farms, the needed software and have to provide the first basic support. -At the end of the test activity the Test Coordinator produces a report -The InfnGrid WP6 coordinators supervise the whole activity

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 12 Grid resource database and tools (by L. Fonti)

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 13 Grid Resource Database §A database has been created for the resources of the Grid pool. §The database backend is an XML file. §The database management tool is a java servlet. §All database management is done on the web, through web pages produced by servlet.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 14 XML database backend §XML has been choosen as database backend, because its element nesting capability is particularly suitable to reflect the hierarchical tree-based structure of Grid resource layout. §Moreover, XML offers an open, freely expandable database schema.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 15 XML file structure § § giis.ba.infn.it § § Giorgio Maggi § § gris1.ba.infn.it § fork § § Pentium III> § Linux RedHat 6.2 § 500 § 256 § 12 § gris1.ba.infn.it § gris2.ba.infn.it §

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 16 Database Access §Database access is granted via web with HTTPS protocol and it is reserved to users owning a valid certificate. §Database and management tools are based on a multi-organizational architecture, i.e. all the resources of DataGrid testbed could be housed in a single database. §However, the choice between centralized and distributed approach has not yet been taken: this question is still subject of discussion.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 17 Database management tools §The main management tool is a java servlet, which uses a simple, non validating parser to access the XML file, and to convert it to an object tree. §It also generates a set of web pages which allow users to examine, add, remove and modify unit entries.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 18 Database management tools §Additional tools have been developed to search nodes with given characteristics, and to allocate them to a testing group. §All management tools have been implemented as java servlets, and tool access is restricted to users owning a valid certificate.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 19

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 20

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 21 Search Tool §A tool has been developed to search the database for nodes matching a given set of requirements. §In the current version, allowed search parameters are: Organization, CPU type and speed, memory size and disk space.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 22

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 23

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 24 Resource Allocation Tool §Another tool has been developed to allow marking a node as reserved to a given group for testing or working purposes. §The tool shows on a web page a list of available resources, similar to the list produced by the main management tool, but with an allocation button shown near each node.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 25 Resource Allocation Tool §The label on the button is “Allocate” if the node is currently free, or “Release” if it is currently reserved. §Clicking the button will swap the node status.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 26

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 27 What about DataGrid?

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 28 What about DataGrid? May the INFN resource database and the tools be used for the whole DataGrid Testbed? May the InfnGrid guidelines be generalized for DataGrid? - a proposal (where the Planning Group is replaced by a Testbed Coordination Group, composed by 1-2 people for each national Testbed) has been submitted to the Integration Convergence Team (ICT) - comments by Federico Carminati - resent by FCA to WP8 TWG ** Need for discussion

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 29 InfnGrid Testbed activities

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 30 InfnGrid Testbed activities for 2001 Software environment, packaging - Integration of various software components - Installation kit production - Experiments’ software environment installation some of the above activities are performed with WP4 and WP8 Grid services - Information Service MDS-2 tests (presentation in the MDS-2 session) - Security, Certification and Authorization a draft document (“Authorization Service for Grid”) will be presented in the themed Security workshop

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 31 Services and Working Groups The GRID basic services Working Groups are: - Information Service Participants: A. Cavalli, A. Bassi, L. Fonti, F. Semeria, G. VitaFinzi - Security, Certification and Authorization Participants: R. Cecchini, R. Alfieri, L. Dell'Agnello, A. Gianoli, C. Rocca, F. Spataro - INFNGrid installation kit and integration Participants: F. Donno, S. Barale, A. Cavalli, A. Chierici, A. Italiano, D. Mura, M. Serra

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 32 InfnGrid Testbed activities for 2001 Resource access policies and allocation for the tests - guidelines for the resource allocation - resource database and tools for search/allocation - tools for the automatic creation of grid-mapfiles Monitoring - development of a simple monitoring tool for whole InfnGrid Testbed starting from the tools developed by the italian components of the LHC experiments (since WP3 tools will not be available in the short term).

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 33 InfnGrid Testbed activities for 2001 Support for Testbed activities: - by the site managers - by the grid services WGs - by the Installation kit group Testbed resources validation Goal: check if the testbed resources are running properly Operational tests of: - grid software installation - batch systems - grid core services - network Is this activity useful for DataGrid, too? Some preliminary discussions with S. Nicoud and E. Fedè, need for a decision.

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 34 Validation Tools Proposal (A. Cavalli) (cont.)  The tool could be done extending the features of the available MDS perl web browser.  It will retrieve the list of resources from the MDS.  Of each GRIS it will show: - Cpu model, speed, cpucount & Globus version; - Time needed to gather information; - Published cpu load attributes; - RTT (just this for now from network); - Defined scheduler. (*) * dynamical values: the 1st depends on the others

DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 35 Validation Tools Proposal (2)  Join the tool developed in Torino (C++ program + some simple scripts) with this one to test the defined scheduler and show the results (open issue: a test user on all resources?).  Write some simple script to test GSI-ftp. ? Is it enough? Is there anything else that has to be checked? ? Is such a tool useful for DataGrid Testbed?