Learning, our way Daikin Europe, Consulting sales section1 Understanding Client’s Needs and best Daikin solution.

Slides:



Advertisements
Similar presentations
Chapter 3. HVAC Delivery Systems
Advertisements

BUILDING AIR CONDITIONING
Trane Voyager™ rooftop units
MAGNA3 – “built on a proven foundation”
Fan Coil Unit Product Line-up. FCU Home Application Show.
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
DX-Central Air Conditioning Systems Smart,Flexible & Efficient Alternate for Malls and Commercial Buildings.
Components of HVAC System
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
BRE Energy Efficient Office of the Future
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Daikin Australia Pty. Limited Ducted Split Systems 2011.
Solutions Overview SAVE FROM 10 – 50%
Air Conditioning Systems
Energy Efficiency Office, EMSD
© 2005 by West Pharmaceutical Services, Lionville, PA. All rights reserved. This material is protected by copyright. No part of it may be reproduced, stored.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
Melcotel TM Features and Benefits Melcotel - Introduction New features –Links with up to 250 room units –Settings reset –Automatic switch OFF –Setback.
IntelliCon ™ Product Line Manufactured by Intellidyne, LLC Distributed by: IMC.
Air conditioning – Refreshes your life Mini-Chiller Applied Systems Sales1 EWA(Y)Q-AAV3P Residential Mini-Chiller Heating EWAQ - AA3VP EWYQ - AAV3P Cooling.
Important variables Water: Air: Conversion:
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Name of Building(s) or Project Speaker(s) Organization(s)
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
N O R T H A M E R I C A C O M M E R C I A L TDP
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
Product Presentation 2007 SKY AIR Launch of new Non-Inverter + Duct (R22) series.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
ERX-condensing units Strategic Marketing Dec-15 1.Concept 2.Product range 3.Combination table 4.Piping length 5.Control possibilities 6.Benefits.
Energy Cost Budget Highlights Jason Glazer, PE GARD Analytics Arlington Heights, Illinois Energy Cost.
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Unit efficiency versus Building System efficiency – Equipment Ratings EER and COP.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Learning, our way 1 Collecting client’s needs (45 min) 4 groups Each group will be divided in 2 subgroups One subgroup includes 2 or 3 persons Each subgroup.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
DC Inverter Mini VRF Reference projects Reference Project Mini and Multi Improvements Product line -up.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
CHIGO HVAC Product Introduction.
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
WSHP Systems 1.
HVAC Replacement Case Study
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Lecture Objectives: Discuss Final Project
ABB i-bus® KNX Room Solutions
Heating, Ventilating, and Air Conditioning
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Renewable Cooling – On the way to large market introduction
Munters DOAS, Chilled Beams and VRV
Lecture Objectives: Answer questions related to HW 4
Energy Efficiency in District Coiling System
Heating, Ventilating, and Air-Conditioning
Case Study: Marks & Spencer Oxford Street
Lecture Objectives: Discuss HW4 parts
Presentation transcript:

Learning, our way Daikin Europe, Consulting sales section1 Understanding Client’s Needs and best Daikin solution

Learning, our way Daikin Europe, Consulting sales section2 Purpose of Workshop Land available with Building Idea ! Design Team Appointed Main Builder Appointed Consultant Specification Building Concept Reviews Negotiate Order with M & E Contractor Project Life Span – Concept to Order (1 month – 2 Years) Specification Tender Stage

Learning, our way Daikin Europe, Consulting sales section3 Consultant Visit – Invitation Tool Box Splits SKY VRV Chillers Controls

Learning, our way Daikin Europe, Consulting sales section4 Preparation before the visit Plan your Visit and Technique Collect Project Information Identify Key Daikin Factors

Learning, our way Daikin Europe, Consulting sales section5 When you say *********** WHAT DO YOU MEAN ? When you say High Level Interface what do you mean ? When you say noise level is important what do you mean ? When you say Energy Efficiency what do you mean ? Avoid asking – Yes/No Questions BE GENUINE AND SINCERE

Learning, our way Daikin Europe, Consulting sales section6 Specific needs Each building is different The legislation varies from country to country. However, we may group common needs for: –Office –Hotel –Shops –Residential

Learning, our way Daikin Europe, Consulting sales section7 Residences: specific needs Small capacity indoor units Small ducted indoor units to perfectly integrate in interior Silent outdoor units especially during night-time Quick answer to demand Small and simple refrigerant piping Simple remote control in each room Central control for total house Single phase power supply

Learning, our way Daikin Europe, Consulting sales section8 Fresh-air legislation Low energy consumption Variable occupancy Electronic devices Easy to maintain Office buildings: specific needs Same comfort all over the year Flexible zoning Independent metering of energy consumption

Learning, our way Daikin Europe, Consulting sales section9 Hotels: specific needs Integrated in the interior design No noise and draft Connectable to Hotel BMS Refrigerant legislation Pleasant indoor environment No temperature variations Different solutions for rooms and public areas Low operation costs

Learning, our way Daikin Europe, Consulting sales section10 Escalators Air curtains Special equipment for Food / wine storage Shops: specific needs Big variation of people occupancy Fresh air legislation Low energy consumption Lights

Learning, our way Daikin Europe, Consulting sales section11 EXAMPLE 9 Storey office Building – Daikin Sales Engineer 1 st Appointment with Consultant Engineer

Learning, our way Daikin Europe, Consulting sales section12 Consultant Overview 30 years old building Nine Floors Refurbishment Existing CW Central System Vacant Property VRV Option ?

Learning, our way Daikin Europe, Consulting sales section13 Inside Building

Learning, our way Daikin Europe, Consulting sales section14 Key Information to Discuss Who will be occupying the building – One tenant or Multi Tenants ? What is the planned floor zoning ? Will the building be refurbished in stages ? What are your time commitments for this project ? Are you considering VRV for this project ? Is it possible to refurbish the existing Chiller Plant ? If yes, are you considering Chilled Water Fan coils (2 pipe / 4 pipe)? What model of fancoils (indoor units) are you thinking of? How will the Fresh Air be treated ? Are you considering a central BMS control systems? Have you calculated Heat Loads? Are the specification documents and drawings already available?

Learning, our way Daikin Europe, Consulting sales section15 Information required for VRV Proposal FLOOR PLAN / HEAT LOADS / ZONING 9.2 kW 7.9 kW 7.4 kW 10.2 kW 8.2 kW 7.2 kW 8.2 kW 7.5 kW Sensible or Total Heat Loads !!!!!!

Learning, our way Daikin Europe, Consulting sales section16 Preference for Indoor Units ? Ceiling Height – only 380mm

Learning, our way Daikin Europe, Consulting sales section17 Clarify Zoning of each Floor Level

Learning, our way Daikin Europe, Consulting sales section18 Heat Recovery – OPTION 1

Learning, our way Daikin Europe, Consulting sales section19 Heat Recovery – OPTION 2

Learning, our way Daikin Europe, Consulting sales section20 Heat Pump / 2 Pipe

Learning, our way Daikin Europe, Consulting sales section21 Pipe runs and Outdoor Unit Locations

Learning, our way Daikin Europe, Consulting sales section22 Units Located on Roof

Learning, our way Daikin Europe, Consulting sales section23 1st Refnet 100m length 40m length

Learning, our way Daikin Europe, Consulting sales section24 Control System Often avoided by new Sales Engineers Recent Developments are not understood by consultant Requires practical application knowledge Can be the difference between winning or loosing your project at tender stage

Learning, our way Daikin Europe, Consulting sales section25 Centralised Control A/C side What is purpose of centralised control?

Learning, our way Daikin Europe, Consulting sales section26 A/C side COMMAND ON-OFF Status ON-OFF Centralised Control

Learning, our way Daikin Europe, Consulting sales section27 Status Malfunction A/C side Code Centralised Control

Learning, our way Daikin Europe, Consulting sales section28 A/C side COMMAND MODE STATUS MODE Centralised Control (Heating/cooling/Fan only)

Learning, our way Daikin Europe, Consulting sales section29 STATUS Room Temperature A/C side COMMAND TEMPERATURE SET Centralised Control

Learning, our way Daikin Europe, Consulting sales section30 STATUS AIR FLOW RATE A/C side COMMAND AIR FLOW RATE Centralised Control

Learning, our way Daikin Europe, Consulting sales section31 A/C side Remote Control Operation Centralised Control

Learning, our way Daikin Europe, Consulting sales section32 Power Proportional Distribution Electricity Consumption Billing information Electricity Consumption

Learning, our way Daikin Europe, Consulting sales section33 Office buildings In Japan in % Initial cost 1000 yen/m2 VRV Controls impact on total price

Learning, our way Daikin Europe, Consulting sales section34 Salesman Checklist Have you understood the Project Concept? Have you understood Consultant requests? Have you got the drawings? Have you got the Heat Loads? Did you received enough elements to build the Control Strategy? Building Schedule Project Leader / Key Persons Preference for installation contractors Next meeting schedule File all collected information

Learning, our way Daikin Europe, Consulting sales section35 Problem Areas or, “things to watch out for” when working a solution Poor Comfort Bad zoning Inappropriate capacity index Wrong indoor units (draft or noise) Oversize units RA sensor position Price Too many, or wrong indoor unit type. Too many zones on heat recovery unit

Learning, our way Daikin Europe, Consulting sales section36 Reasons for losing a Daikin spec-in project Insufficient Budget (not qualified properly) Budget over-run (poor design or estimating) Poor relationships Poor follow-up and planning Service Credit Extended delivery periods