DOE/NSF Review May 8-10, 2001 1 US CMS US CMS M&O Planning Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

LHCbComputing LHCb Computing Tasks. December Status of Computing Personnel m Currently available people insufficient to cover all activities o Estimate.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
February 2002 Scope and Contingency; Transition to the Research Phase William J. Willis Columbia University.
1 Operating, Maintaining, and Upgrading the LHC Detectors Sally Seidel University of New Mexico National Science Foundation February 21, 2003.
1 Operating, Maintaining, and Upgrading the LHC Detectors Sally Seidel University of New Mexico U.S. Department of Energy April 18, 2003.
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
HPS Budget and Schedule Marco Oriunno, June 4-6, 2013 HPS Collaboration Meeting, JLAB.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
US-CMS Software and Computing 1st Meeting of the FNAL Oversight Panel, October 2000 Core Applications Software Lucas Taylor Northeastern University.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
Operations, Test facilities, CF&S Tom Himel SLAC.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Fermilab Annual DOE Program Review May 16-18, 2005 JF1 CMS M&O at FNAL Jim Freeman US CMS M&O Manager May 17, 2006.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab.
CMS Computing and Core-Software USCMS CB Riverside, May 19, 2001 David Stickland, Princeton University CMS Computing and Core-Software Deputy PM.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
P5 Meeting - Jan , US LHC The Role of the LHC in US HEP Dan Green US CMS Program Manager January 28, 2003.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 3-4, 2004 Dubna, Russia.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
Friday the 18th of May, 2001US CMS Physics J.G. Branson1 Physics in (US) CMS James G. Branson UC San Diego US CMS Collaboration Meeting Riverside CA.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
U.S. ATLAS Executive Meeting Silicon M&OWBS 3.1 August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Budget Outlook Glen Crawford P5 Meeting Sep
UEC User’s Meeting - June 11, US CMS Status Dan Green US CMS PM June 11, 2002.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
DPS/ CMS RRB-T Core Software for CMS David Stickland for CMS Oct 01, RRB l The Core-Software and Computing was not part of the detector MoU l.
U.S. ATLAS Project Manager’s Review with the Project Advisory Panel March 21-22, BNL Introduction Howard Gordon.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Expected wire accumulated charge at 3000 fb-1 for various chamber types.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
Comments on the February DOE Review
DOE/NSF Lehman Review, May 8-10, 2001
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
LHC Science Goals & Objectives
HCAL M&O-B Budget CMS Finance Board
S4 will be a “big” Collaboration:
Preparations for a Lehman Review
Management Breakout: MREFC Budget Summary Victor L
Collaboration Board Meeting
Preliminary Project Execution Plan
Presentation transcript:

DOE/NSF Review May 8-10, US CMS US CMS M&O Planning Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001

DOE/NSF Review May 8-10, Outline CMS and CERN Planning Resource Loaded Schedules – Category A – Category B US CMS - Planning for the Physics - the research program.

DOE/NSF Review May 8-10, Planning for the Physics CMS has put “CPT” in place to prepare for the research program. This is a coherent sum of Core SWC, Physics reconstruction and selection, and high level Triggers. CMS will present draft MOU for M&O and SWC at the next RRB meeting at CERN. Draft cost profiles for M&O, SWC have been shown to the JOG. Upgrade R&D and some fabrication is part of the research plan. US CMS has created a draft Management Plan for M&O. A resource loaded schedule (WBS) was made in preparation for the Lehman review. FNAL had a PMG review April 11-12, The Lehman review (May 8-10) has requested a complete plan for all costs of the US CMS Research Program - M&O + SWC + Upgrades.

DOE/NSF Review May 8-10, US CMS Research Program - M&O Letter of August 17, 2000 from the Joint Oversight Group ( JOG - DOE/NSF) to Fermilab to manage Maintenance and Operations (M&O) –Detector operations and data monitoring –M&O of US CMS supplied subsystems –Virtual control room at FNAL for US based physics analysis –R&D for and fabrication of upgrades to the experiment First cost estimate shown to JOG on December 6, 2000.

DOE/NSF Review May 8-10, CMS Steering Committee Changes have been made in CMS to plan for SWC + Physics. CMS is planning for the research program. M&O + SWC at the next RRB. US physicists are an integral part of the CMS management. US CMS

DOE/NSF Review May 8-10, “CPT” CSC (SWC MOU) Pimia Stickland TRIDAS(De tector MOU) Cittolin Smith PRS Sphicas Common Technical Board CSC IB TRIDAS IB Tier 1 L. Bauerdick - US CMS SWC

DOE/NSF Review May 8-10, PRS and Detector L2 Tasks: detector simulation detector reconstruction detector calibration monitoring physics objects, reconstruction and selection test beam analysis e - Seez J, - Eno  - Gasparini, Acosta ,b - Mannelli ECAL - Faure HCAL - Green MU - Gasparini Mitselmakher Tracker - Rolandi

DOE/NSF Review May 8-10, CMS L2 and PRS

DOE/NSF Review May 8-10, Resource Loaded Schedule - M&O WBS 1-7 are subsystem costs for US built and/or managed systems (Category B) WBS 8 contains the Category A (common CMS costs), the Remote Control Room, and US CMS Outreach. Estimates for Cat. A are from CMS/CERN WBS 9 gives detail on the estimated costs for Project offices at FNAL and at CERN. WBS 10 is the management reserve.

DOE/NSF Review May 8-10, WBS Dictionary - Notes US CMS has begun to create a resource loaded schedule for M&O. The “notes” field is used for the dictionary and BOE.

DOE/NSF Review May 8-10, Resource Sheet The base program resources must be called out explicitly, even if there is no explicit M&O cost. The US CMS research program cannot succeed without strong base support.

DOE/NSF Review May 8-10, WBS M&O CERN and CMS DOE+NSF/CERN MOU is umbrella document - with “general conditions applicable to experiments performed at CERN”. Now work on “MOU for Collaboration in the Exploitation of the CMS Detector” and an IMOU on SWC. Category A error is large k$/yr. US is pro rata ~ 20%. NO costs to US CMS before FY03.

DOE/NSF Review May 8-10, Category A Subtasks WBS is the largest item in WBS 8.1 Explicitly call out the subtasks of 8.1

DOE/NSF Review May 8-10, US CMS - at Present 387 Members from 38 Institutions

DOE/NSF Review May 8-10, How Will US CMS Grow? D0 doubled in size around the time of first data taking. US CMS is imagined to do likewise. CDF and D0 are “natural” future additional collaborators. It is expected that US LHC physics will engage a substantial fraction of the US HEP experimental community by the time of first LHC data.

DOE/NSF Review May 8-10, Remote Control Room Expect (D0 experience) US CMS will grow dramatically in FY05, 06 by a factor ~ 2. Taking US CMS ~ CDF now, we estimate 200 students and 120 university postdocs “in residence” if we adopt this model. If all are at CERN, just the incremental costs to the “base program” are ~ 5.4 M$/year. This would also be a major change in the sociology of U.S. HEP. An alternative is to create a “critical mass” stationed in the US using the Tier1 UF (SWC) and Tier2 (NSF) as the primary computing resources for US physics analysis. The Remote Control Room (M&O) would be used to debug equipment, teleconference hold physics analysis meetings and take data shifts. We will attempt to create a coherent national US CMS physics effort with a real identity. Upper Atmospheric Research Collaboratory (UARC) is a data point (NSF).

DOE/NSF Review May 8-10, US CMS - UF + RCR US CMS

DOE/NSF Review May 8-10, US CMS Remote Control Reality check: US CMS is using the CDF/KEK remote control room for Run II as a starting point. However, we want to expand the scope to encompass a US based physics group and US LHC accelerator tasks.

DOE/NSF Review May 8-10, US CMS - Outreach The US CMS Construction PO now supports proposals for educational initiatives. The US CMS Education Coordinator is responsible for prioritizing the proposals. The US CMS Project Office for the detector project then funds the agreed upon proposals. This effort would continue smoothly into the research phase of US CMS. QuarkNet is a powerful example of the educational possibilities inherent in the LHC. We plan to continue to exploit the outreach opportunities of US CMS e.g. CMS web cam in SX5

DOE/NSF Review May 8-10, WBS 1-6, US CMS Category B The US CMS L2 Managers were asked to estimate their M&O tasks for; –M&S costs to maintain and operate systems provided by US CMS (Category B). –Resources needed to maintain technical personnel at CERN. –Additional costs associated with the major annual shutdown. –NOTE: Post-doc and graduate student salaries and incremental costs (e.g. per diem) are assumed to be supported by the university base programs. Use annual SOW to define that commitment?

DOE/NSF Review May 8-10, WBS 1-6, US CMS - Scaling Reality Check: For CDF Operations there are 2 FTE engineers and 14 FTE technicians. We plan for a similar economy of scale by putting a “US CMS pool” together for general engineering and technician tasks. This team would have 4 FTE engineers and 20 FTE technicians. This team in residence costs ~ 1.6 M$/yr.

DOE/NSF Review May 8-10, WBS 7 - US CMS PO Reality Check: US CMS has experience from the construction project and we plan a smooth “handoff”. There will need to be both a CERN and a FNAL/NEU “branch” of the PO. There are ~ 6-8 FTE in the PPD/CDF Ops Dept. We expect ~ 4 FTE at CERN, ~ 4 FTE at Fermilab. The M&O PO costs ~ 1 M$/year and scales well with the current PO.

DOE/NSF Review May 8-10, US CMS - L2 Accounts US CMS - CERN Branch Project Office (opened on May 1, 2000) US CMS L2 CERN Team Accounts –Funds sent to FNAL –Allocations by L2 managers –Transfer to Team Accounts at CERN –Authorization of expenses by L2 managers –Invoices sent to FNAL for financial tracking –PO, EMU, HCAL, and SiTrkr have started L2 accounts Serves as a model for M&O (Cat A+B) funding and tracking. FNAL has accepted a “pass through” overhead rate, treating CERN as a collaborating institution. This decision allowed US CMS to plan for the installation and commissioning phase of the detector.

DOE/NSF Review May 8-10, US CMS - FY01 Requests The P.O. already has input to DOE/NSF in regards to a project perspective on base support increments for postdocs. This recommendation refers ONLY to project related activities and not research activities covered by the peer review process. Adequate base support wil, however, be critical to the success of the research program.

DOE/NSF Review May 8-10, Management Reserve Much of the research program costs will be salaries. A full contingency analysis at the lowest task level seems inappropriate. A management reserve of 25 % is proposed to be held in the Project Office. This level is similar to the R&D reserve held at the start of the detector project. This mechanism worked well in that instance. Problems will arise that must be solved, e.g. currency fluctuations. Other possibilities would be an accident at the detector or more frequent than expected repairs in this hostile accelerator environment. We must plan to cover these contingencies.

DOE/NSF Review May 8-10, WBS - Cost and Manpower Reality Check: The T+E level is close to the scaling estimate. These cost estimates do not contain salaries of research personnel - postdocs and graduate students. However, the tasks are called out and there are ~ 48 “FTE” PD working on M&O. Note also Cat B does not start until ~ FY05

DOE/NSF Review May 8-10, US CMS Research Program - SWC 11/98: DOE and NSF Joint Review of ATLAS and CMS Computing/Software 5/99: DOE and NSF Review of US ATLAS and US CMS Computing and Software 1/00: DOE/NSF Review of US LHC Software and Computing Projects 10/00: Hoffmann Review Report (CERN SWC Review) 11/00: US LHC Software and Computing Review There have been several US reviews of SoftWare and Computing needs over more than 2 years. A large investment in SWC is needed to realize the investment in the construction of the CMS detector. Note SUSY can come in the first month at 10% luminosity.

DOE/NSF Review May 8-10, US CMS Research Program Upgrades are estimated - both R&D and fabrication. They should be proposal driven and reviewed in the context of the full US HEP program. Note that SWC also has upgrades as a part of the plan (Moore’s Law). Contingency is explicitly held in an annual management reserve. The proposals for allocation of reserve should be reviewed as they are in the construction project. Postdocs and students are estimated from CDF and D0 scaling. They are identified as necessary to the success of US CMS research, but their support is assumed to reside in the “base program”.

DOE/NSF Review May 8-10, The Cost of US CMS Research The components of the research program are SWC, M&O, Upgrades and scaled estimates for the dislocation costs associated with postdocs and students - base program cost.

DOE/NSF Review May 8-10, US CMS - Summary The physics available at the LHC is compelling. The transition from US CMS construction to research is being planned. There are now resource loaded schedules in place for all the components the US CMS research program. Our aim is to enable the US physicists to be a coherent group making a major impact on physics analysis within CMS.

DOE/NSF Review May 8-10, Detector Upgrades - I Detector Upgrades - I US CMS Scope restoration (8.6 M$) –ME4/2 mechanics –ME4/2 electronics –ME4/1 electronics –Installation and Commissioning the above –Fpix third layer

DOE/NSF Review May 8-10, Detector Upgrades - II CMS Scope Restoration - US Management (4.0 M$) of EMU, HCAL –ME1/1 electronics and cables –HF shielding –HF tooling and supports Repairs (5.5 M$) –HE |y|=3 scintillator repair –Fpix replacement for radiation damage

DOE/NSF Review May 8-10, Detector Upgrades - III R&D EDIA - ( 0.2 M$/year) “TRIDAS” Upgrades ( ~1.0 M$/year) –increase in C.M. energy ~ transparent –increase in luminosity --> “smarter” L1 trigger and faster L2, L3 event building –DAQ improvements with commodity purchases –r.f. changes in bunch crossing time ?

DOE/NSF Review May 8-10, JOG and Fermilab Letter of August 17, 2000 from JOG to Fermilab to manage M&O –Detector operations and data monitoring (Category A, WBS 8) –M&O of US CMS supplied subsystems (Category B) –Virtual control room at FNAL for US based physics analysis (WBS 8) –R&D for and fabrication of upgrades to the experiment (WBS 8) First cost estimate shown to JOG on December 6, 2000.

DOE/NSF Review May 8-10, M&O Planning CMS has put “CPT” in place to prepare for Physics. Draft cost profiles for M&O, SWC have been shown to the JOG, most recently Dec. 6, Upgrade R&D and some fabrication is part of the plan. We DO NOT assume that the Project can use M&O funding to complete installation. Planning and resource loaded schedules are being created for SWC and M&O which will both be needed to realize the investment in the CMS detector. These efforts need to be globally optimized. US CMS has made a draft OMP for M&O. The Lehman review has requested a complete plan for all costs of the US CMS Research Program - M&O + SWC.

DOE/NSF Review May 8-10, D0 - Demographic Growth CDF has ~ 406 physicists with 154 students. D0 has ~ 493 physicists with 108 students. The are now ~ 160 students and university postdocs in residence at D0. There will be an increase when Run IIa is in full operation. D0 doubled in size just before data taking. US CMS is imagined to do likewise.