23/08/20081 RBI.816 Operation First aid on RBI.816 converter control J. Wenninger.

Slides:



Advertisements
Similar presentations
Part 4: combinational devices
Advertisements

InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
Ignore errors in this “Server” window Is there a popup window about a memory error? If so, restart monitoring Can you see in this window the program running.
Automating Result Verification
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
The PHENIX/EMCal(PbSc)/BB/TOF Laser User Instructions Sean Stoll (rev. 12/8/03)
How to Program the Bypass Tray on most Sharp Models.
Presentation Title. Presentation Title (can go two or three lines) This Font is Georgia/bold Template Instructions To edit the presentation title above:
The IDE (Integrated Development Environment) provides a DEBUGGER for locating and correcting errors in program logic (logic errors not syntax errors) The.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Find the software in the PC  C:/PTmonitor/monitoring.
East Area Secondary Beam Control User Guide L.Gatignon / AB-ATB 12 June 2008.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
SPS Timing. Outline Timing table Modes of operation Mode switch mechanism External events Creating a timing table Timing event cleaning.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
User Interface – Switch Panel 6 Gang Switch Panel Configuration guide RS485 Terminal Fixing hole Bayonet Front ViewBack View.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Gates automation. Summary  Choosing the appropriate model  Faac Product Range (Sliding Gates)
Debugging tools in Flash CIS 126. Debugging Flash provides several tools for testing ActionScript in your SWF files. –The Debugger, lets you find errors.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
19/06/20081 CNGS Operation Part 1 : CNGS beam operation. Protons on their way to the target. CNGS specialties. Part 2 : Extraction Interlock System. Detailed.
15 Copyright © 2004, Oracle. All rights reserved. Debugging Triggers.
June CNGS Operation Part 1 : CNGS beam operation. Protons on their way to the target. ‘Special’ CNGS issues. Part 2 : Extraction Interlock System.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
3/10/20071 CNGS Operation Part 1 : CNGS beam operation. Protons on their way to the target. CNGS specialties. Part 2 : Extraction Interlock System. Detailed.
CERN Marc Magrans de Abril MPP – RBI DCCT Incident Beam Lost in TI2 Event Analysis and Proposed Mitigations SPS and LHC MPP
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
SPS Partial Economy 1 J. Wenninger BE-OP-SPS April 2009 The partial economy team: S. Page, M. Jonker, S. Cetour Cave, L. Pereira, J.C. Bau, I. Kozsar,
Unit Hardware Troubleshooting
VAB™ for INFINITY Tutorial
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Dimmer 6fold 10V Actuator M/DA
Dry contact sensor HDL-MSD04.40 HDL-MSD08.40.
About Interlocks, Timing Systems and how to send SPS beams to the LHC
Design of new generation CLIQ units (CLIQ2)
Tool removed during cycle Fault #2
Hannes Sakulin, CERN/EP on behalf of the CMS DAQ group
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Module 1: System Overview
Conferencing with Video and Presenting
Interlocking of CNGS (and other high intensity beams) at the SPS
Friday Morning 7:30 injection for fill 2908
Category 1 Category 2 Category 3 Category 4 Category
New page for summary of test status
Friday 15th February - morning
Table of contents Getting started Panel configuration with Eldes Utility Tool Setting automation parameters Practical examples.
Monday 27th August & night
CECOM LAR Operation Course
The electronic reporting system for UWWTD Questionnaire 2007
LHC An LHC OP guide… under construction J. Wenninger
SPS Injection BIS - Draft requirements
Installing SAP GUI (Logon) on Your PC or MAC
Presentation transcript:

23/08/20081 RBI.816 Operation First aid on RBI.816 converter control J. Wenninger

Main Bends (RBI.816) powering 23/08/20082 Interlock DCCTs MUGEF for ‘standard’ surveillance The TT41 and TI8 main dipoles are powered by a single converter, with switches (mechanical and electronic) to send the current into the correct magnet string. The mechanical switches are interlocked with the access chains. To run CNGS when TI8 is in access, the TI8 (load) switch must be to Earth. If that is not the case, there will be an access interlock on the PC & an alarm for the LHC access system! To control the switches – use the PC expert (Labview) program ! To ensure that the switch position is correct, there are 2 ‘dummy’ ROCS channels that have only an interlock DCCT but no converter. The names of the ROCS are DCCT_TI8 and DCCT_CNGS (also accessible from equipstate). The 2 DCCTs are used to identify which branch is powered, and their current is interlocked like any other converter. Mechanical swicthes

PC state 23/08/20083 Load connection: Polarity - : TI8 to load. Polarity + : TI8 to earth. Fixed target mode : TT41 to load. Collider mode : TT41 to earth.

Functions… 23/08/20084 The functions must be manually edited at IREF level : The switch requires the current to be <= 30 A at the start of the cycle. Watch out with LHC cycles : the start of the TIMING cycle is 425 ms before the start of our settings !!

Reference Functions 23/08/20085 Reference function example for RBI.816 for TI8 on (blue) and off (red).

LTIMs 23/08/20086 The electronic switching of the PC is controlled by 5 LTIMs on m1sba4. The LTIMs are triggered at the START of the CYCLE and they define the switching of the PC. Without LTIM the switch will remain in whatever state it is. LTIMs to switch to TT41: Standard PPM LTIM, enabled on a USER basis. Dynamic destination LTIM triggered by dyn. Destination CNGS. LTIMs to switch to TI8: Standard PPM LTIM, enabled on a USER basis. Dynamic destination LTIM triggered by dyn. Destination TI8-DUMP. Dynamic destination LTIM triggered by dyn. Destination LHC2-TI8 (LHC master). >> To stop switching the PC to one of the lines (access etc) while pulsing into the other one, disable all the LTIMs associated to that line.

LTIM Contol 23/08/20087 Control over the RBI LTIMs is over the LTIM menu in the extraction interlock monitor applications for CNGS and LHCB2.

LTIM Control / 2 23/08/20088 Overview panel to monitor the LTIM ‘triggers’. Note that the monitoring is still to be perfected. Some LTIM triggers can be associated erroneously to the wrong user. PC  TT41 LTIMsPC  TI8 LTIMs

LTIM Control / 3 23/08/20089 Click on the Buttons at the above the column to control the LTIMs Note : no user is needed for the non-PPM LTIMs

LTIM Control / 4 23/08/ The three buttons at the top may be used to DISABLE all LTIMs for either TI8 and CNGS, or to enable All possible CNGS LTIMs.

Prepare Access to LHC Pt8 23/08/ Load the function on RBI.816 with TI8 to minimum current (see RBI.816/IREF trim history, there is a reference with TI8 ON and with TI8 OFF). 2.Disable the timings for TI8 (see previous slide). Use the button to disable ALL TI* LTIMs. 3.Switch TI8 to Earth with the PC Labview application (set Polarity +) in the FT or LHC cycle. The PC will switch off during this maneuver. 4.Switch RBI.816 back ON. It should continue to pulse on CNGS.

Recover from Access to LHC Pt8 23/08/ Switch TI8 to Load with the PC Labview application (set Polarity -) in the FT or LHC cycle. The PC will switch off during this maneuver. 2.Switch the PC back on. 3.Enable the timings for TI8 (see previous slides): 1.Dest TI8DUMP 2.Dest LHC2-TI8 3.TI8 PPM LTIM on the appropriate USER. 4.Load the function on RBI.816 with TI8 and CNGS pulsing (see RBI.816/IREF trim history, there is a reference with TI8 ON and with TI8 OFF).