XML Working Group Joan Ugljesa NDIA PMSC May 3, 2006 949-609-2999

Slides:



Advertisements
Similar presentations
Transparency Act Subaward Reporting and Executive Compensation September 10, 2010.
Advertisements

SBR in SuperStream John McAlister Standard Business Reporting March 2011.
Electronic Enterprise Integration Committee Standards Radar Chart as of February 2009 Unpublished work © 2009 Aerospace Industries Association of America,
Slide 1 The Universal Business Language International, royalty-free library of electronic transaction documents. Designed in an open and accountable vendor-neutral.
MLR Associates 11/05/ Park Center Drive, #A1612, Alexandria, VA 22302, Voice: ; (Cell) Fax:
Presented By: DCMA John Van Dinther Chris Hassler UN/CEFACT Plenary September 2008 Introduction to EVGen3: 3 rd Generation Earned Value Data Reporting.
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
Electronic Enterprise Integration Committee
MIS 385/MBA 664 Systems Implementation with DBMS/ Database Management Dave Salisbury ( )
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
CATEGORIES OF INFORMATION There are three main categories of business information,and these are related to the purpose for which the information is utilized.
Introduction to ebXML Mike Rawlins ebXML Requirements Team Project Leader.
XML Working Group Joan Ugljesa NDIA PMSC January 31,
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Presented By: Chris Hassler Project Editor – UN/CEFACT TBG6 Team for Project Cost and Schedule Management Feb 2006 UN/CEFACT TBG6 Team for Project Cost.
EbXML Overview Dick Raman CEO - TIE Holding NV Chairman CEN/ISSS eBES Vice Chair EEMA and HoD in UN/CEFACT Former ebXML Steering Group.
IT Project Management Cheng Li, Ph.D. August 2003.
EEIC Standards Process Draft Feb 2006 Howard Mason / Tom Warner.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
XML Working Group Joan Ugljesa NDIA PMSC August 15,
14 May th UN/CEFACT Plenary1 Applied Technologies Group Chair Mark Crawford Vice Chairs Gait Boxman Jostein Frømyr
Copyright OASIS, 2002 OASIS Topic Maps Technical Committees Standards Update Presentation Knowledge Technologies Conference Seattle , March 11 Bernard.
XML Working Group Joan Ugljesa NDIA PMSC April,
PSCIOC XML Subcommittee Status Update — September 27, 2004 Dave Wallace (Chair) Corporate Chief Technology Officer Management Board Secretariat Ontario.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Principal HCM Sales Consultant
Proposal for a Revised Technical Framework for UN/CEFACT eProcurement impact 1.
XML Working Group Joan Ugljesa NDIA PMSC February 8, February 4, 2005.
Applied Technologies Group Report Chair: Mark Crawford Vice Chair: Jostein Frømyr Vice Chair: Gait Boxman.
OASIS Week of ebXML Standards Webinars June 4 – June 7, 2007.
SATERN for Supervisors Updated: January Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.
Context Inspired Component Architecture Navigating the Shifting Currents of Data xmlCoP Meeting May 18, 2005 ANSI Accredited Standards Committee X12 Ralph.
1 What’s Next for Financial Management Line of Business (FMLoB)? AGA/GWSCPA 6 th Annual Conference Dianne Copeland, Director, FSIO May 8, 2007.
© 2005 Global Grid Forum The information contained herein is subject to change without notice Leading the pervasive adoption of grid computing for research.
UN CEFACT Single Window Recommendation Simplifying International Trade Gordon Cragge Chair – International Trade Procedures Working Group (TBG 15 of UN.
© TIAC group, IPA Information System [case study] Vojvodina Investment Promotion Fund.
XML Working Group Joan Ugljesa NDIA PMSC April 25,
United Nations CEFACT and Earned Value Generation 3 The Gold Standard for Project Management and Reporting Published March 25, 2008.
UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC August 26, 2010.
Project Life Cycle.
XML Working Group Joan Ugljesa NDIA PMSC August 24,
1 Open Forum for Standards Developers New York June 20-21, 2006 Presented by Mark Palmer Vice Chair of UN/CEFACT International Cooperation on eBusiness.
AIA RFID Data Exchange Guideline Status AIA / Electronics Enterprise Integration Committee May 10, 2005.
Electronic Submission of Massachusetts Crash Reports Dave Krasnow e.
Common Record Update Holly A. Hyland, FSA Kim Shiflette, NCHELP.
XML Working Group Joan Ugljesa NDIA PMSC August 7,
HIPAA Transactions Testing Update Kepa Zubeldia, M.D. September 13, 2004.
DLMS XML Update Supply PRC May 18, 2007 Thomas Lyons.
Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier.
Requirements Engineering for Web Applications. SR: System Vision Document Written by key stakeholders Written by key stakeholders An executive summary.
Electronic Enterprise Integration Committee Overview of Aerospace Industry IUID Data Exchange Guideline December 14, 2005 Bill Zirkel, Northrop Grumman.
Electronic Submission of Medical Documentation (esMD)
EbXML Business Process Dept of Computer Engineering Khon Kaen University.
UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC January 29,
Copyright © 2002 Open Applications Group, Inc. All rights reserved Open Applications Group Core Components WG Overview January 30, 2003.
EbXML Semantic Content Management Mark Crawford Logistics Management Institute
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Implementing the Surface Transportation Domain
Joan Ugljesa NDIA PMSC August 15, 2006
Engineering Processes
Common Record: A Story of Convergence
ePhyto DRAFT APPENDIX 1 TO ISPM 12:2011
Eddy Porosnicu EUROCONTROL
Eddy Porosnicu EUROCONTROL
Joan Ugljesa NDIA PMSC May 4, 2005
Presentation transcript:

XML Working Group Joan Ugljesa NDIA PMSC May 3,

May, Topics Background Review development steps and current plan Current work product Current events List of URLs

May, Background What’s the purpose? Replace the existing ANSI X12 Electronic Data Interchange (EDI) transaction sets (806 and 839) with an XML equivalent Provide means to exchange schedule, cost, and related auxiliary data in a standard format Address formal government contractual requirements Facilitate data exchange for all parties – subcontractors, prime contractors, customers, program offices, internal management

May, What’s the End Objective? A library of XML schedule, cost, and auxiliary data components (XML schemas) that can be used by the project management community Formal, published international standard (ISO, UN/CEFACT) that can be cited in contracts and requirements Software vendor neutral format Prevent new projects from reinventing the wheel – use standards based XML components in a web services environment Consistent, standard approach means you save time and money

May, UN/CEFACT Development Steps 1.Project definition* 2.Use Case Description (participants, process)* 3.Use case as UML model (basis for data model), UML activity diagram (sequence of events)* 4.Business Requirements Specification with high level data models* 5.Requirements Mapping Specification (detailed data description)** 6.Add any missing core components (ISO standard)** 7.Harmonization** 8.Schemas generated based on CEFACT design rules * - Complete ** - In UN/CEFACT review process

May, Development Plan UN/CEFACT Project ProposalComplete – Presented 9/05 UN/CEFACT Business Process Use CasesFirst edition complete – Presented 9/05 DCMA/Boeing St. Louis Proof of Concept Initial draft XML schema for trial use Complete 3/06 UN/CEFACT Business Requirements Specification Complete Presented at 3/13-17/06 UN/CEFACT meeting UN/CEFACT Requirements Mapping Specification Draft XML schema for trial use ready for implementation verifications Draft schemas available now Implementation Verifications – Boeing, NG, others to be determined Began 3/06 Complete by 9/06 UN/CEFACT Published Schemas10/06 or 3/07 UN/CEFACT Meeting

May, Current Work Products Business Requirements Specification (BRS) – approved Report approved status to XML.gov* Requirements Mapping Specification (RMS) – detail data model, beginning harmonization process Initial review – May interim meeting Subsequent review – August interim meeting * Purpose of XML.gov is to support the directives in the E-Government Act of 2002, means the schemas will eventually be part of their federal database of registered components

May, BRS - Business Process The Participants: Customers Government Agency Contractor Internal Management Data Sources Supplier Contractor Government Agency Program Office Types of data exchange: interactive, data subsets, and complete set

May, BRS/RMS - Information Areas Produce targeted schemas for specific data exchange purpose Can be used alone or combined Includes: Schedule data – activities, milestones, relationship details, resource assignment details Cost data - Budget, actual, earned value, estimate (cumulative/at complete or time phased) Contract and project summary data Funding data Auxiliary data – reporting structures, calendars, resources, thresholds

May, Current Events Have conducted in depth reviews of the Business Requirements Specification and data model contents with various project management software vendors* including: Artemis Business Engine (MPM) C/S Solutions Dekker Welcom/Deltek Also provided draft schemas for review and comment * Primavera is scheduled for May 11

May, Current Events AIA eBusiness Steering Group (eBSG) Monitoring progress of standards development, proof of concept activities Offering assistance with adoption and implementation Normal process for this group: Identify standards that the industry can use Recommend adoption Provide guidelines or recommendations on use* * NDIA PMSC has the opportunity to assist in the development of these guidelines

May, AIA EEIC Standards Development “Radar Screen ” As at Monitor external development Participate in external development Adopt existing standard AIA development Active AIA Project AIA Guidelines Supplier UID X12 EDI Candidate Track GTPA Template Adopted UDEF Supplier UID Clickable GTPA PM/EVM Boost Aero STEP PLCS FIPS 201 RFID IADFA Certipath PKI SAML TSCP ebXML Position of unadopted blips is provisional GECA Template EIA-927

May, Resources XML.govxml.gov xml.gov/cop.asp (community of practice) AIAwww.aia-aerospace.org UN/CEFACTwww.unece.org/cefact/index.htm UN/CEFACT TBG6http://webster.disa.org/cefact-groups/tbg/wg/tbg6_main.cfm Working group documents Available on the DAU web site: Note: you must be a member of the Earned Value Community of Practice to access the web site