Island Greenway Project MARCH 10, 2015 COUNCIL MEETING.

Slides:



Advertisements
Similar presentations
ce.com Ontario Trails Conference 2010 Ontario Trail Conference June 2010 Kara Van Myall, MCIP, RPP, OALA, CSLA.
Advertisements

© Bishops Stortford Town Council Sworders Field Masterplan – Brief History.
No Name Park March 7, Citizen Park Committee Volunteers 3 Official Meetings Other subcommittee meetings Developed Vision for Park Developed General.
Louisiana Safe Routes To School Program
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Shared Road Markings “Sharrows” For Bicycles Max Starcke Park Connection to the Future TxDOT Hike and Bike Trail.
…part of the Perry County Greenway. Cannelton- Quality of Place in Southern, IN Charming historic, small town located in Perry County along the southern.
BRUCE FREEMAN RAIL TRAIL ARTICLES 22, 23, & ANNUAL TOWN MEETING.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Manager’s Recommendation FEBRUARY 11, 2015 COUNCIL ROOM.
MapABILITY.ca. Interactive Map Engage Platform Accessibility Search Engine Custom Route Generator Information from users (Crowd- Sourcing) Information.
Contact: Beth Morris
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
New Jersey Coastal Heritage Trail Route By Jason Herlihy and Elizabeth Saracco.
Goals Development Goals for Aspen Falls Presented by Donald Norris, City Engineer.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
Building Healthy Communities “ Healthy Places and Healthy People Go Together” Kate Whitehead, BS Tim Scandale, BS Selina Rooney, RCDC Funded through a.
Conducting Counts & Surveys. Why? Better understand needs Understand what influences biking and walking Secure grant funding Support Bicycle and Pedestrian.
EPAC Land Use & Sustainable Development Subcommittee EPAC Update April 2005 Land Use & Sustainable Development Subcommittee.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
October 2014 | 2 Town of East Gwillimbury Mayor Councillors Elected every four years.
Open Space Residential Development Bylaw Town of Rehoboth.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Department of Public Works Proposal for Archery in the Lower Arroyo & Deal Points for New Agreement with PRA City Council February 2, 2015.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Prepared by: ROBA KANDEEl بسم الله الرحمن الرحيم.
GREENWAYS Connecting Communities November Greenways Plan 350 km planned Over 80 km built Construction of 4-5 km / year.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Bergen Street South Community Planning Workshop March 18, 2015 Visual Preference Survey Results ▪Retail and Mixed Uses ▪žResidential Densities ▪žRecreational.
TOWN OF DAVIE TOWN OF DAVIE Agricultural & Environmental Advisory Committee Committee Goal Setting & Priorities.
NEWPORT POINTE COUNTY FILES: GP# , RZ# , SD# , AND DP# BOARD OF SUPERVISORS HEARING June 4, 2013.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
All About Maps Beth Clause. How Firefighters Use Maps.
We have a policy, now what?  Throw a party and go home?
Lancaster Open Space & Recreation Public Forum March 22, 2009.
White County Greenways Trails and Byways Presentation.
Shoreline Drive/Greene Lane Park/McAllister Point Aquidneck Island Reuse Planning Authority Surplus Properties at NAVSTA Newport, Rhode Island March 6,
Way Finding Signs and other directional aids that will help lead visitors to a destination, attraction, or amenity within a community or town. Way Finding.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
 The Pedestrian Plan is:  Long Range and Comprehensive  Conceptual  A Vision for the Future  The Plan is not:  Regulatory or Binding  A Master.
Wake County Comprehensive Parks & Recreation Master Plan.
Public Input Meeting April 16, Meeting Schedule Housekeeping Meeting Schedule – Open House – 6:00-6:30 pm – Presentation – 6:30-7:00 pm – Q&A –
BROOKLYN BRIDGE PARK micah sherman daniel martinez.
Ordinance No. 880-B, Revisions to Chapter 9.5 of the City of Southlake Code, Article V – Oil & Gas Well Drilling and Production. Item 6B.
Innovation North-Side Neighborhood Access Feasibility Study
Z ..
Santa Cruz avenue sidewalks Project
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
NATL and the Surge Area Wetland.
ROOSEVELT CITY GENERAL PLAN 2010
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Bicycle and Pedestrian Update to City Council
Sandy Point NC The Sandy Point property is divided into two tracts by State Route 32, which crosses the Albemarle Sound Bridge at Sandy Point. The 3.5-mile-long.
Forest Glen Retail Survey
WESt Sammamish park project
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
I Street Bridge Replacement Project
Presentation transcript:

Island Greenway Project MARCH 10, 2015 COUNCIL MEETING

Alternative Routes 1.Alternative A – East side of Stormwater Pond 2.Alternative B – West side of Stormwater Pond 3.Alternative C – No Bike Path 4.Alternative D – Partial MUP and Partial on street path

Alternate B Route Insert Map

Alternate B - New Information Bike Path on West side of Pond Environmental Regulations SEPI Engineering Conducted Independent Wetlands Analysis - NO WETLANDS Corp of Engineers Conducted In-Formal Wetlands Analysis - NO WETLANDS State NCDENR and Stormwater – NO PIPING OUTFALL / NO CHANGES TO POND Liability Insurance Cost - Covered By Existing Coverage$ 0 Regulation– No Fishing, No Swimming, No Boating, No Feeding Alligators$ 0

Alternate B – Cost Analysis FE-6 Fence 6,264 linear ft x $18 per linear ft = $ 112,752 Fair Market Value$ 20,000 Engineering Costs Field Survey – Topo/Location (1700 lf)$ 2,500 Soil testing$ 4,000 Engineering (design trail, bridge, outlet analysis)$ 6,100 Permitting – ACOE, NCDENR)$ 1,200 CPE Services$ 1,050 As-Built Drawings on Stormwater Pond$18,000 Total$36,550 Pedestrian Bridge $35,000 to $50,000 Alt. B Current Known Costs = $204,302 to $219,302 Alt. A Current Known Costs = $162,675 (FE-6 & Ornamental Fence)

Project Funding

Manager’s Recommendation Alternative B – West Side Option Most Visually Attractive Option Town Liability can be Controlled through Regulation and Enforcement Meets Town Obligation to Prohibit Pedestrian and Vehicular Access to MOTSU Property Increases the Town’s Infrastructure to Support Walking, Jogging and Biking Activities Refer Park Concept to Parks and Recreation Advisory Committee