S ALES T AX : P AVEMENT M ANAGEMENT P ROGRAM P RESENTATION TO THE A LACHUA C OUNTY B OARD OF C OUNTY C OMMISSIONERS A ND T HE C ITIZENS OF A LACHUA C OUNTY.

Slides:



Advertisements
Similar presentations
Pavement Surface Evaluation and Rating Presentation City of Oberlin Public Works Department July 5, 2011.
Advertisements

Capital Improvement Funding. State of the District Facilities 50% of Aiken County Public Schools are between 40 and 60 years old Leavelle McCampbell Middle.
Rigid Pavement Concrete. Transverse Cracking Rigid Pavement Transverse Cracking Causes:  Slab longer than 15’ Slab Curl Curing.
City of Houston Street Surface Assessment Vehicle
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Legislative Committee on Education Capital Funding Needs July 15, 2014.
S ALES T AX : P AVEMENT M ANAGEMENT P ROGRAM S PECIAL M EETING WITH THE B OARD OF C OUNTY C OMMISSIONERS S EPTEMBER 20, 2011.
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
County Transportation System Governor’s Transportation Advisory Committee September 14, 2012 Abbey Bryduck, AMC Policy Analyst.
Pavement/Infrastructure Management Program Review April 6, 2009 Remington & Vernick Engineers.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Future of Ringgold County Sealcoat Road System Open Forum Meetings 2011 Credit for assistance in this presentation to Brad Skinner, Page County Engineer,
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
City of Lake Elmo · New Village Workshop-Focus on Infrastructure· January 20, 2007 PAVEMENT MANAGEMENT REPORT PREPARED: NOVEMBER 16,
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Preventive Maintenance
PCC Overlays of HMA Pavements
S ALES T AX : P AVEMENT M ANAGEMENT P ROGRAM P RESENTATION TO THE B OARD OF C OUNTY C OMMISSIONERS J ULY 12, 2011.
Pavement Distresses Flexible Pavement
2014 Budget Department Presentations Infrastructure Funding Options.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
KEEP PALM COAST March 27, 2012 City Council Workshop.
Pavement Preservation Preventive Maintenance
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
Transit Service for FY12 Presentation to Board of County Commissioners August 9, 2011.
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
P AVEMENT M ANAGEMENT P ROGRAM U PDATE R EPORT 2010 P RESENTATION TO THE A LACHUA C OUNTY B OARD OF C OUNTY C OMMISSIONERS A UGUST 24, 2010.
S PECIAL A SSESSMENT D ISTRICTS F IRST P UBLIC H EARING * P RESENTATION TO THE B OARD OF C OUNTY C OMMISSIONERS F EBRUARY 23, 2010.
Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
Douglas County Road Maintenance Funding June 27, 2011.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
S ALES T AX : P AVEMENT M ANAGEMENT P ROGRAM P RESENTATION TO THE A LACHUA C OUNTY B OARD OF C OUNTY C OMMISSIONERS A ND T HE C ITIZENS OF A LACHUA C OUNTY.
A Penny Sales Tax! Why? The City of Crestview has currently identified nine transportation projects. These projects will provide for alternate routes to.
Using Reflective Crack Interlayer-
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Courthouse and Jail Maintenance Tax Background Originally passed in 1987 at 3.50 mills in conjunction with major capital improvements which included a.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
CITY OF FLAGSTAFF – PROP. 406 ROAD REPAIR AND STREET SAFETY 1.
1 WAKULLA COUNTY TOWN HALL MEETING One Cent Sales Tax Extension May 3, 2016 at 6:00p.m. St. Marks City Hall.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Protecting Your Pavement Investment Jeff Stokes. 4 R’s for Paving Success 1 Risk Management Identifying and minimizing your risk factors 2 Right Repair.
2012 Pavement Management Update June 12, 2012 BoCC Work Session.
Public Works Infrastructure Update Public Works Department April 5, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Roadway Pavement Management Plan
Village of Woodridge 2011 Pavement Analysis
The Gainesville Area Chamber Infrastructure Investment Initiative
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Town of Clayton 2016 Pavement Condition Survey
Kent County Road Commission Partnering with 21 Townships serving over 235,000 residents and 1312 miles of Local Roads.
HIGHWAY MAINTENANCE Failures in flexible pavement.
Pavement condition index calculation
PASER Ratings for TwinCATS Planning Area
2014 Streets Resurfacing.
Preparing for Our Future
Presentation transcript:

S ALES T AX : P AVEMENT M ANAGEMENT P ROGRAM P RESENTATION TO THE A LACHUA C OUNTY B OARD OF C OUNTY C OMMISSIONERS A ND T HE C ITIZENS OF A LACHUA C OUNTY F EBRUARY 1, 2011

Support the placement of a referendum item on the 2012 election ballot requesting voter approval of a one-cent sales surtax for effective pavement management (Penny For Pavement). Pavement Management Program Recommendation

Board Direction What’s the problem? Is the problem fixable? What happens if we don’t fix it? Why a Sales Tax? Staff Recommendation Pavement Management Program Presentation Outline

B OARD D IRECTION

Direct County Manager and staff to prepare summit in first quarter of new year (2011) to discuss 1¢ Sales Tax Direct staff to pursue Option 1: Proactive Capital Maintenance plan, including: –stormwater features; and –life-cycle set-asides for new infrastructure Board Direction A UGUST 24, 2010

W HAT ’ S THE P ROBLEM ? 85% OF AC R OADWAYS NEED R EPAIR

2010 P AVEMENT C ONDITION A NALYSIS Total Paved Miles: 677 C URRENT P AVEMENT C ONDITION

A LACHUA C OUNTY R OADWAYS Total Paved Miles: 677

N O R EPAIR N EEDED NW 51 st Street, Resurfaced 2008SW 20 th Avenue, Resurfaced 2008 S URFACE R ATING V ISIBLE D ISTRESS G ENERAL C ONDITION No Repair Needed None.New construction. Recent overlay. Like new. P AVEMENT C ONDITION A NALYSIS E XPLANATION OF C ATEGORIES

R OADWAYS : N O R EPAIRS N EEDED 15% mileage P AVEMENT C ONDITION A NALYSIS

M INOR R EPAIR N EEDED (M ILL, R ESURFACE ) County Road 241, Resurfaced 2002 S URFACE R ATING V ISIBLE D ISTRESS G ENERAL C ONDITION Minor Repair NeededSurface shows some traffic wear and raveling. Longitudinal cracks (open 1⁄4”) due to reflection or paving joints. Transverse cracks (open 1⁄4”) spaced 10’ or more apart, little or slight crack raveling. No patching or very few patches in excellent condition. Surface aging. Sound structural condition. P AVEMENT C ONDITION A NALYSIS E XPLANATION OF C ATEGORIES

27% mileage R OADWAYS : M INOR R EPAIR N EEDED P AVEMENT C ONDITION A NALYSIS

M AJOR R EPAIR N EEDED (M ILL, ARMI L AYER, R ESURFACE ) NW 94 th Avenue, Paved 1979SE 43 rd Street, Paved 1979 S URFACE R ATING V ISIBLE D ISTRESS G ENERAL C ONDITION Major Repair NeededModerate to severe raveling (loss of fine and coarse aggregate). Longitudinal & transverse cracks (open 1⁄2”) show signs of slight raveling and secondary cracks. Block cracking. Extensive to severe flushing or polishing. Severe deterioration. P AVEMENT C ONDITION A NALYSIS E XPLANATION OF C ATEGORIES

49% mileage R OADWAYS : M AJOR R EPAIR N EEDED P AVEMENT C ONDITION A NALYSIS

S TRUCTURAL R EPAIR N EEDED NW 32 nd Avenue, Paved 1978 S URFACE R ATING V ISIBLE D ISTRESS G ENERAL C ONDITION Structural Repair Needed Alligator cracking (over 25% of surface). Severe distortions (over 2” deep) Extensive patching in poor condition. Severe distress with extensive loss of surface integrity. Needs patching and repair prior to major overlay. P AVEMENT C ONDITION A NALYSIS E XPLANATION OF C ATEGORIES

8% mileage R OADWAYS : S TRUCTURAL R EPAIR N EEDED P AVEMENT C ONDITION A NALYSIS

F ULL P AVEMENT R ECONSTRUCTION N EEDED CR 236, Paved 1976CR 231, Paved 1960 S URFACE R ATING V ISIBLE D ISTRESS G ENERAL C ONDITION Full Pavement Reconstruction Needed Closely spaced longitudinal & transverse cracks often showing raveling & crack erosion. Severe block cracking. Some alligator cracking (less than 25% of surface). Patches in fair to poor condition. Moderate rutting or distortion (1” or 2” deep). Occasional potholes. Needs patching and repair prior to major overlay. P AVEMENT C ONDITION A NALYSIS E XPLANATION OF C ATEGORIES

1% mileage R OADWAYS : F ULL P AVEMENT R ECONSTRUCTION N EEDED P AVEMENT C ONDITION A NALYSIS

2010 P AVEMENT C ONDITION A NALYSIS Total Paved Miles: 677 C URRENT P AVEMENT C ONDITION

P ROGRESS TO D ATE P AVEMENT C ONDITION A NALYSIS

27 resurfacing projects currently funded (113 miles) –15 projects have been completed (43.7 miles) 2006: 6 projects – 17.0 miles 2007: 3 projects – 11.5 miles 2008: 5 projects – 12.2 miles 2009: 1 project – 3.0 miles –5 projects scheduled for completion by 2011 –4 projects scheduled for completion by 2012 –3 projects scheduled beyond 2013 P ROGRESS TO D ATE P AVEMENT C ONDITION A NALYSIS

Gas Tax Revenues Not Sufficient to Address Need Other funding sources committed for at least ten years –Gas Tax Bond –Sales Tax Bond Dedicated funding source needed F UNDING I SSUES P AVEMENT C ONDITION A NALYSIS

W HAT ’ S THE P ROBLEM ? 85% OF AC R OADWAYS NEED R EPAIR

I S THE P ROBLEM F IXABLE ?

YES I S THE P ROBLEM F IXABLE ? E FFECTIVE P AVEMENT M ANAGEMENT P ROGRAM “A Penny for Pavement”

The first 20 years, up to $21M per year* from a one-cent sales tax $646,000 per mile 585 miles paved Includes new road replacement funding Includes minor roadway-related drainage modifications After the first 20 years, $9.5M per year* from a half-cent sales tax $215,000 per mile 677 miles paved on 20-year cycle Includes new road replacement funding * The County’s share when split among municipalities I S THE P ROBLEM F IXABLE ? E FFECTIVE P AVEMENT M ANAGEMENT P ROGRAM

I S THE P ROBLEM F IXABLE ? E FFECTIVE P AVEMENT M ANAGEMENT P ROGRAM In 20 years, the County’s resurfacing needs will become manageable.

W HAT H APPENS IF W E D ON ’ T F IX ? R OADWAYS G ET W ORSE - F AST

In 20 years, the County’s resurfacing needs will exceed its ability to fund them. W HAT H APPENS IF W E D ON ’ T F IX ? R OADWAY D ETERIORATION

W HAT H APPENS IF W E D ON ’ T F IX ? P AVEMENT D ETERIORATION C URVE

2010 P AVEMENT C ONDITION A NALYSIS Total Paved Miles: 677 C URRENT P AVEMENT C ONDITION W HAT H APPENS IF W E D ON ’ T F IX ?

2030 P ROJECTED P AVEMENT C ONDITION Total Paved Miles: 677 F UTURE P AVEMENT C ONDITION W HAT H APPENS IF W E D ON ’ T F IX ?

P AVEMENT D ETERIORATION O VER T IME New

W HAT H APPENS IF W E D ON ’ T F IX ? P AVEMENT D ETERIORATION O VER T IME 20 Years Old

W HAT H APPENS IF W E D ON ’ T F IX ? P AVEMENT D ETERIORATION O VER T IME 30 Years Old

W HAT H APPENS IF W E D ON ’ T F IX ? P AVEMENT D ETERIORATION O VER T IME 40 Years Old

W HY A S ALES T AX ? T HE R IGHT F IX

Generates enough revenue to solve the problem –Adjusts with inflation Everybody pays –Outside area commuters –Road users that don’t contribute now Commerce is related to road use S ALES T AX

Support the placement of a referendum item on the 2012 election ballot requesting voter approval of a one-cent sales surtax for effective pavement management (Penny For Pavement). Pavement Management Program Recommendation

S ALES T AX : P AVEMENT M ANAGEMENT P ROGRAM P RESENTATION TO THE A LACHUA C OUNTY B OARD OF C OUNTY C OMMISSIONERS A ND T HE C ITIZENS OF A LACHUA C OUNTY F EBRUARY 1, 2010