March 28, 2014 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call.

Slides:



Advertisements
Similar presentations
2012 State Board of Directors Orientation “Its good business to do business with an AGC member”
Advertisements

Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
Silicon Valley Leadership Group – Transportation Policy Committee (March 5, 2014) David B. Kutrosky, Managing Director Capitol Corridor (Sacramento-Oakland/San.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Section 305 Technical Subcommittee Chicago IL June 22 nd 2011.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
California Transportation Commission Glendale, California July 25-26, 2007 Business Plan 2008 Capitol Corridor Joint Powers Authority (CCJPA)
OCBC Infrastructure Committee April 8, 2014 LOSSAN Rail Corridor Update Jennifer Bergener – Managing Director, LOSSAN JPA.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
ACEforward The new regional initiative to improve our connection between the Central Valley and the Bay Area.
ACEforward ACEforward Stacey Mortensen Executive Director
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.
October  AB 32 (2006)  Target: Greenhouse Gas (GHG) emissions at 1990 levels by 2020 and maintain reductions  Authorized the Cap and Trade Program.
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
PASCD ANNUAL MEETING. PASCD Constitution ITEMS IN RED ARE TO BE DELETED ITEMS IN GREEN ARE TO BE ADDED.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Anaheim Regional Transportation Intermodal Center Project Update.
9/2/20151 Ohio Family and Children First An overview of OFCF structure, membership, and responsibilities.
October Prop K Strategic Plan & 5-Year Prioritization Programs Presentation to the Citizens Advisory Committee October 24, 2007.
April 29,  Investment in new and improved services, with a strong focus on customer experience  Investment focused on improving efficiency  Shorter.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
1 E-911 Services Board Meeting General Business Meeting May 08,
PRIIA Section 305 Next Generation Equipment Pool Committee Ken Uznanski Amtrak Policy and Development SCORT National Meeting September 21, 2010.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
March 27, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call.
December 12-13, 2007 Item 4.4 Tab 31 California State Rail Plan to
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
September 26, 2014 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call.
July 24, 2015 Board Meeting.
1 Governance Council Meeting Fiscal Year 2004 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY GATEWAY CITIES SERVICE SECTOR December 18, 2003.
Citizens Advisory Committee Quarterly Update Bill Van Meter, Assistant General Manager, Planning September 19, 2012.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
The Life of a Policy Council Member
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
OFFICE OF THE CITY CLERK MARCH 24, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING THE PASADENA.
Workshops on Discussion Draft of Guidelines December 2014.
Region Acceptance Process Draft Recommendations Workshop Department of Water Resources Sept 8, Sacramento Sept 9, Los Angeles Sept 10, Fresno.
Training Module 7. What You’ll Learn In This Module In what areas may Conservation Districts enter into a contractual agreement with Michigan Department.
May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office.
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
TIFIA Credit Program Overview Updated October 2012 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
FRYSC Advisory Councils Partners in Progress
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
11 Cap-and-Trade Auction Proceeds Funding Guidelines for Agencies that Administer California Climate Investments September
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY.
Federal Funding Strategies Update Internal Working Document Update on Federal Funding California High-Speed Rail Authority In Partnership with: Kadesh.
Nathan Smith Co-Project Manager California State Rail Plan March 7, 2012.
California Intercity Passenger Rail Service Governance: Local Authority American Public Transportation Association December 2, 2015.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
State of Louisiana Division of Administration Facility Planning and Control “Project Outlook” American Council of Engineering Companies of Louisiana Mark.
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
FY 2018 Budget Review Process and Schedule
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
California’s Rural Intercity Bus System: 2018 Update
Regional Transportation Sales Tax Transportation Investment Act of 2010 and Transportation Funding Act of 2015 as of April 5, 2017.
AN INVESTMENT IN CALIFORNIA’S FUTURE
Presentation transcript:

March 28, 2014 Board Meeting

San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call

San Joaquin Joint Powers Authority Item 2 Public Comments

San Joaquin Joint Powers Authority Item 3 Consent Calendar 3.1.Approve Minutes from January 24, 2014 BoardMeeting 3.2.Approve Next SJJPA Board Meeting Location and Start Time Request to delay acting on Item 3.2 until after Item 9

San Joaquin Joint Powers Authority Item 4 Edits to SJJPA Bylaws (Election of Officers) and JEPA (SJJPA Board)

 At the January 24, 2014 SJJPA Board Meeting, staff was directed by the Board to include an action item on the next board meeting agenda to change the term for the Chairperson and Vice Chairpersons from one year to two-years.  This action requires changes to the SJJPA Bylaws and JEPA. Edits to SJJPA Bylaws and JEPA

Section 2.1 (Election of Officers) of the SJJPA Bylaws is to be amended to read:  “Nomination and election of a Chairperson and at least one Vice-Chairperson shall be held at the first meeting of the Board and thereafter at the biennialannual first meeting. The Chairperson and Vice-Chairperson(s) shall each be a Board Member. The terms of the office of the Chairperson and Vice- Chairperson(s) shall be for onetwo years to extend from the election of officers at the close Edits to SJJPA Bylaws and JEPA

 of the regular meeting at which said officers are elected, or until a successor is duly elected. Any vacancy during the term shall be filled by nomination and election for the remainder of the term. No member may serve more than two consecutive yearsterms as Chairperson or Vice-Chairperson of the Board. Any Chairperson or Vice-Chairperson who does not complete a first or second twoone- year term shall nonetheless be deemed to have served a full twoone-year term for all purposes.” Edits to SJJPA Bylaws and JEPA

Since this is an administrative matter more appropriate for Board action related to the SJJPA Bylaws, Section 5.8 (SJJPA Board) of the SJJPA JEPA is to be amended to read:  “The Board shall elect a chairperson and at least one vice-chairperson from among its members. The terms of office shall be one year. No member may serve more than two consecutive years as chairperson of the Board.” Edits to SJJPA Bylaws and JEPA

 Any future discussions related to the terms of the Chair and Vice Chair(s) shall be directed through action related to the SJJPA Bylaws. Recommendation:  Approve Resolution Adopting Edits to SJJPA Bylaws and JEPA Edits to SJJPA Bylaws and JEPA

San Joaquin Joint Powers Authority Item 5 Presentation by Madera County Member Wheeler

San Joaquin Joint Powers Authority Item 6 Draft Chapters for SJJPA Business Plan Dan Leavitt

 The SJJPA Business Plan must be included and referenced as part of the SJJPA’s Interagency Transfer Agreement.  AB 1779 specifies a number of requirements for the Business Plan.  The Draft Business Plan is to be completed by the March 2014 SJJPA Board Meeting.  Initial Draft Chapters were presented at the November and January meetings. Draft Chapters for SJJPA Business Plan

 Executive Summary  7. Short-term and Long-term Capital Improvements  8. Action Plan and Performance Standards  13. Annual Funding Requirement  15. Consideration of Other Service Expansions and Enhancements  16. Roles and Responsibilities Draft Chapters for SJJPA Business Plan

 The State has invested almost $460 million since 1976 to increase and improve the San Joaquin service.  SJJPA strongly supports the completion of those capital projects that are currently underway to enable the deployment of an additional daily round trip between Oakland and Bakersfield (7 th San Joaquin daily round trip).  These capital projects are expected to be completed by mid to late Short-term and Long-term CIPs

 SJJPA will also work with the State to secure funding and expedite the implementation of the projects needed to implement an 8 th daily round trip (about $112 million needed) and mid- corridor start/ends.  SJJPA will develop a comprehensive longer-term program of improvements to reduce travel time, increase ridership, and improve service reliability, and increase frequency. 7. Short-term and Long-term CIPs

Some of the possibilities for Longer-term CIP:  Additional bi-level trainsets.  Construction of a new maintenance facility.  Improvements between Sacramento and Stockton on UPRR Fresno Subdivision or new track on r/w adjacent to UPRR Fresno Subdivision.  Improvements to increase service between Oakland and Port Chicago.  Improvements from Port Chicago to Bakersfield. 7. Short-term and Long-term CIPs

 Negotiating revisions to Amtrak operating agreement to improve performance reporting and decrease costs.  Developing schedules and a service plan for implementing for 7 th and 8 th round-trip trains in conjunction with UPRR, BNSF, Amtrak and the State and also work on improvements to the existing 6 round-trip schedule.  Identifying improvements and costs needed for mid-corridor starts/ends. 8. Action Plan and Performance Standards

 Assist CalSTA in the development of its Network Integration Plan.  Evaluate measures to improve train and Thruway bus performance, including modifications to the service.  Work with UPRR, BNSF, Amtrak and State to improving reliability, adjusting the service plan, and/or implementing projects that add capacity and reduce travel times. 8. Action Plan and Performance Standards

 The primary purpose of this Business Plan is to request the annual funds required by the SJJPA to operate, administer, and market the San Joaquin rail service for agreed-upon service levels.  The ITA will set forth the fund request for FY 14/15 to identify the maximum amount of funds to be transferred to the SJJPA for FY 14/15 which will be incorporated into the FY 14/15 Legislative Budget process. 13. Annual Funding Requirement

 Based on the current San Joaquin operations, Amtrak is negotiating the operating costs for the San Joaquin Service for FY 14/15 with the Caltrans Division of Rail.  These negotiations are ongoing and the costs for the San Joaquin rail and Thruway bus services are currently not available.  The San Joaquin Operating Costs for FY 14/15 will be the number that is agreed upon between Amtrak and the State. 13. Annual Funding Requirement

 The primary role of the SJJPA will be the day-to- day management of the San Joaquin service. SJJPA administrative costs for FY 14/15 are estimated at $1,304,985.  For FY 14/15, SJJPA assumes $1.9 million for “Marketing Expenses”. Consistent with the 2013 State Rail Plan. 13. Annual Funding Requirement

 Deployment of the 7 th daily round trip is the highest priority for service expansion, and SJJPA will focus advocacy efforts on securing the required increase in state operating funds.  It will also be a high priority for SJJPA to work with the State to secure the funding necessary for the capital improvements and the additional operating funds to enable the deployment of the 8 th daily round trip. 15. Consideration of Other Service Expansions and Enhancements

 Initiating early San Joaquin trains mid-corridor and having the last San Joaquin trains end mid- corridor may result in substantial increases in ridership and revenue.  Merced appears to be well suited as the location to initiate mid-corridor starts.  SJJPA will work with Caltrans, BNSF and UPRR to evaluate the possibility of having the 7 th and 8 th daily round trips be used by San Joaquin trains which start and end mid-corridor. 15. Consideration of Other Service Expansions and Enhancements

 There is a great potential market for the San Joaquin service to Sacramento if the frequency of service can be increased and offered at the right time of day.  SJJPA will work with CHSRA, CalSTA, Caltrans and the Central Valley Rail Working Group (CVRWG) to pursue improvements of the San Joaquin service to Sacramento. 15. Consideration of Other Service Expansions and Enhancements

 Additional San Joaquin stations in key locations could improve access to the service and increase ridership.  Working in partnership with local and regional agencies, SJJPA will assess viable new station locations, and promote the funding, design, and initiation of construction for new stations within the next three fiscal years. 15. Consideration of Other Service Expansions and Enhancements

 Additional stations discussed thus far include, Hercules, Berkeley, 65 th Street Sacramento, Elk Grove, North Fresno, and North/West Bakersfield.  Contra Costa representatives have also suggested that another station in Eastern Contra Costa be evaluated in coordination with a mid-corridor start. 15. Consideration of Other Service Expansions and Enhancements

 Planning for additional service between Oakland and Bakersfield.  Potential future extensions of San Joaquin service to be investigated include:  Sacramento to Redding (160 miles). Serving Yuba/Sutter, Butte, Tehama and Shasta counties.  Extending San Joaquin trains 5 more miles past the Oakland Station to serve the existing Oakland Coliseum/BART (Oakland Airport).  Utilization of the Altamont Corridor to bring San Joaquin service to additional Bay Area markets. 15. Consideration of Other Service Expansions and Enhancements

 Under the provisions of AB 1779, the State would continue to have prominent and very important roles with the San Joaquin intercity passenger rail service, even after the administration responsibility is turned over to SJJPA.  The State will continue to provide the funding necessary for service operations, administration and marketing. 16. Roles and Responsibilities

 The State would remain responsible for the development of the Statewide Rail Plan; the coordination and integration between the three state-supported intercity passenger rail services; the preparation of grant applications to the federal government; and the development of state budget requests.  The State remains the owner of the trainsets used for the San Joaquin and Capitol Corridor services and procurement of new equipment. 16. Roles and Responsibilities

 SJJPA will work with CalSTA and Caltrans Division of Rail to reach agreement and fully define the roles and responsibilities of SJJPA and the State towards the operation, maintenance, planning, and improvement of the San Joaquin service.  The agreed upon detailed roles and responsibilities will be included as a key part of the ITA. 16. Roles and Responsibilities

 Highlights from Draft Business Plan  Questions/Comments Executive Summary

San Joaquin Joint Powers Authority Item 7 San Joaquin Rolling Stock Update Brian Schmidt

Comet Car Coordination

 Three of the final four cars arrived in Oakland.  There is no estimated time for final acceptance of the three cars at this time.  Staff has requested Caltrans not deploy the second Comet Car trainset until the performance of the initial Comet Car trainset has been analyzed, and consider whether the benefits associated with deploying the second Comet Car Trainset outweigh the additional costs. San Joaquin Rolling Stock Update

San Joaquin Rolling Stock Presentation *Note: For the week 11/10 thru 11/16 trains 711 & 718 were operated with bi-level equipment for 4 of the 7 days

 San Joaquin OTP Oct. 1 thru March 25  Trains Operated-2,111  Trains On-Time-1,695  Trains Late- 416  FY Year to Date OTP-80.3%  March OTP-81.7% San Joaquin Rolling Stock Presentation

 Ridership FY14 vs. FY13 – Oct. thru Feb. FY14 FY13 % Change  San Joaquin 466, ,  Capitol Corridor 569, ,  Pacific Surfliner 1,009,996 1,016, San Joaquin Rolling Stock Presentation

 Ticket Revenue FY14 vs. FY13 – Oct. thru Feb. % FY14 FY13 Change  San Joaquin $15,289,595 $16,164,  Capitol Corridor $10,962,797 $11,558,  Pacific Surfliner $24,519,132 $23,890,

 Next Steps  Regularly meet with Caltrans Division of Rail Staff to review performance data for the Comet Car trainset.  Solicit feedback from Amtrak and customers of the San Joaquin passenger rail service. This will allow for decisions to be made with input from regional partners on the operational effectiveness of the Comet Car trainsets. San Joaquin Rolling Stock Presentation

San Joaquin Joint Powers Authority Item 8 CIPR Leadership Coalition Update Dan Leavitt

CA Intercity Passenger Rail Leadership Coalition

 The First Senate Select Committee on Passenger Rail Hearing was held on March 19.  Chairperson Pedrozo represented SJJPA.  The CIPR Leadership Coalition prepared a “brochure” that is being used to promote the CIPR Program.  The latest list of “CIPR Supporters” was also included.  CIPR Leadership Coalition met with members of the Legislature on March 19 and March 20. CIPR Leadership Coalition Update

 CIPR Leadership Coalition is working with Assm. Gray to establish an Assembly Select Committee for Passenger Rail.  The Second Annual “Rail Summit” is April 2-3, 2014 in Los Angeles at LA Metro/Los Angeles Union Station.  Vice Chair Perea and Executive Director Mortensen will be speaking on April 2, representing the SJJPA and the San Joaquin Corridor. CIPR Leadership Coalition Update

San Joaquin Joint Powers Authority Item 9 Update on Intercity Transfer Agreement and Schedule Stacey Mortensen

 ITA discussions with CalSTA, Caltrans, OCTA.  Agreement on schedule with ITA complete and signed by end of  Provide additional time for public review of SJJPA Draft Business Plan. Recommendations:  Change Business Plan schedule to approve at the end of June (rather than May).  Cancel May and July SJJPA Board Meetings. Update on ITA and Schedule

Recommendations:  Schedule next SJJPA meeting in late June.  Poll members for their availability for a June 27, 2014 in Sacramento at 2 pm.  Item 3.2: Approve Next SJJPA Board Meeting Date/Location/Start Time Update on ITA and Schedule

San Joaquin Joint Powers Authority Item 10 Letters of Support for TIGER Grant Applications for Elk Grove Station, Hercules Station, and ACE Stockton Track Extension Dan Leavitt

 The Transportation Investment Generating Economic Recovery, or TIGER Grant Program provides the US DOT the opportunity to invest in transportation projects.  On Jan 2014, $600 Million was authorized for TIGER Grants. Grant applications are due on April 28,  TIGER funds must be obligated before September 30, Letters of Support for TIGER Grants

 City of Elk Grove is applying for a TIGER Grant application for the Elk Grove rail station which will serve the San Joaquins.  The location of the Elk Grove Multimodal Station was deemed appropriate by the California Department of Transportation, and Amtrak, due to the growing ridership on the San Joaquin. Providing direct rail access to this growing community of over 160,000 people. Letters of Support for TIGER Grants

 The City of Hercules is applying for a TIGER Grant for the Hercules rail station.  Combined with the $44 million that California and the region have already committed to the project, these TIGER funds will help to construct 8,000 feet of track that will be used as a passing track to benefit goods movement from the Port of Oakland when not in use as rail station track, and construct an intermodal transit center. Letters of Support for TIGER Grants

 The SJRRC is applying for a TIGER Grant for the Stockton Track Extension Phases 2-3 project.  This project completes the construction of a dedicated passenger track through downtown Stockton between the SJRRC Regional Maintenance Facility (RMF) and the joint Stockton ACE and Amtrak station.  While this is an ACE application, this project also benefits the San Joaquin service and freight operations. Letters of Support for TIGER Grants

RECOMMENDATION  Approve letter of support for the City of Elk Grove for their TIGER grant application.  Approve letter of support for the City of Hercules for their TIGER Grant application.  Approve letter of support for SJRRC for their TIGER grant application.  Authorize staff to submit other letters of support to the SJJPA Chairperson for San Joaquin related applications. Letters of Support for TIGER Grants

San Joaquin Joint Powers Authority Item 11 Administrative Matters or Announcements FY 14/15 Amtrak Agreement for the San Joaquins Correspondence Stacey Mortensen

 Recent letters of support for CIPR Program from City of Antioch, Alameda County Transportation Commission, East Bay Leadership Council, and Brotherhood of Locomotive Engineers and Trainmen (BLET).  Comments of Draft Business Plan from Kern COG, Hank Fung, and Carol Bender.  Received request for a Bakersfield Public Meeting on SJJPA Business Plan Correspondence

 Kern COG has offered use of their Board Room and will send out notification to their list.  SJJPA Draft Business Plan Public Meetings are currently planned to be held at Fresno, Sacramento, Modesto, and SF Bay Area. Recommendation:  Hold an additional SJJPA Draft Business Plan Public Meeting in Bakersfield at Kern COG. Correspondence

San Joaquin Joint Powers Authority Item 12 Board Members Comments

San Joaquin Joint Powers Authority Item 13 Adjournment

March 28, 2014 Board Meeting