Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.

Slides:



Advertisements
Similar presentations
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Advertisements

0ATLAS Pixel Mechanics meeting at LBNL 13 April 2000 P.Netchaeva, INFN/Genoa Study of bump stresses The aim of this study is to check the effect of stresses.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
CALICE: WP4 Thermal and Mechanical Roger Barlow Cambridge 10 September 2005.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Low Mass Rui de Oliveira (CERN) July
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Interconnection in IC Assembly
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
Dec
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
ATHENA - Module Construction P. Riedler, J. Rochet.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Si Sensors for Additional Tracker
Berkeley status Aug 10th, 2012.
GRPC development in Lyon
T. Bowcock University of Liverpool
CALICE: Thermal, Mechanical and Assembly issues
ROX sensor packaging and mounting scheme for use on dilution STM sample plates Ben MacLeod Jan
Studies of Quad Pixel Module assembly using paper laminate
Hybrid Mechanical/Thermal Design ideas
Setup for testing LHCb Inner Tracker Modules
WP4 Dave Bailey 5th May 2006.
Presentation transcript:

Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4 update

Glue - About as sexy as insurance But too late to start worrying when production faults start - Are small no of faults the thin end of a long wedge? Atlas Barrel - Peek module mounting Brackets glued to Carbon Fibre cylinder CMS Tracker modules - Conducting Glue Bias connection to backplane Ray Thompson Calice meeting UCL 6 Mar 06

CMS tracker module glue problems Of 51 TOB modules built, we found 29 sensors with 1K to over 40M ohms higher than normal resistance in the bias connection.  Added strictly defined mixing procedures for the Tra-Duct  Applied epoxy immediately before sensor placement.  Switched to using Epotek silver epoxy. Evidence problem is glue to sensor interface, not glue to gold pad No effect - eventually decided to wire bond as well Tony Affolder, UCSB

Literature search Electronics industry experience Other Experiments - small no of tried glues Conducting Glues Silver filled 2 part epoxy ( no mass loss no voids) Ag has high conductivity, Silver oxide conducts realise conductivity ~1/1000 solid Ag -interconecting particles choose particle size, viscosity,,cure temp EPO-tek 4110 Areas of interest - resistance aging Interface problems oxide layer at Al/Ag interface Production wafers old CTE mismatch Si /PCB - glue flexible Glass transition temp CTE change 50 x10-6 to 150 x10-6 Corrosion/electro chemistry – Ok for N2 atmosphere Glue effects on wafer passivisation

Programmable Environmental chamber Resistance measurements either Keithley 2000 DVM Keithley 236 SMU Labview Glue test set up Ray Thompson Calice meeting UCL 6 Mar 06

Pc board / gold Silicon / al Resistance snake Tests 50 dots continuous monitoring Glue robot  R 0.1 ohm/50 dots

Temperature cycling Ray Thompson Calice meeting UCL 6 Mar 06 Temperature cycling deg/ min Upwards resistance rise Consistent with silver temperature coefficent On contraction Interfaces become loose?

Double sided Pc Silicon wafer Talking to Prague people about availability of wafer samples Duff wafers, Mechanicals, Test structures at edges Further stages Real stresses – info from steve on likely temperature distributions Automated assembly 85/85 tests standard 85C /85RH aimed mainly at corrosion problems Measure lots of pairs after cycling Ray Thompson Calice meeting UCL 6 Mar 06

Finish off writeup of literature search Test set Up taking data. Continuing with Prague samples etc Interface stuff only meaningful with final objects - Test Beam prototype – known dead channels? Electronics – at what point does glue resistance become noticable? Ray Thompson Calice meeting UCL 6 Mar 06

Assembly concepts Start thinking about on pick and place techniques for assembling detector planks Don’t reinvent the wheel Look at/ exploit existing stuff CMS/Atlas experience Generalised concept of a gantry with interchangable tools pattern recognition software Ray Thompson Calice meeting UCL 6 Mar 06

CMS tracker module assembly gantry Ray Thompson Calice meeting UCL 6 Mar 06

Interchangeable Vacuum pickup tool Ray Thompson Calice meeting UCL 6 Mar 06