US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
MEG Review at BNL, Jan. 18, 2006 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
US CMS Silicon Tracker : Overview J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
MEG Review at FNAL, Jan. 28, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara Status and schedule CMS Weekly Meeting Fermilab May 14, 2004.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager DOE/NSF Review of CMS Detector.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
The Finnish CMS Collaboration Helsinki Institute of Physics S. Czellar, A. Heikkinen, J. Härkönen, V. Karimäki, H. Katajisto,R. Kinnunen,T. Lampén, K.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Vertex ‘99, 6/21-25/1999 p. 1 CDF Run II SiliconAlan Sill, Texas Tech University CDF Run II Silicon Tracking Projects 8th INTERNATIONAL WORKSHOP ON VERTEX.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
An Overview of the FPIX Detector Upgrade – CMS Experiment
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
B01.2- Outer Tracker Gino Bolla, L3 Manager, January 31, Director's Progress Review – Outer Tracker.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Si Sensors for Additional Tracker
Detector building Notes of our discussion
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
TK Upgrade report.
Tracker Outer Barrel Silicon
On behalf of the US TOB testing group
Results from module testing
On behalf of the US TOB testing group
FNAL Hybrid Testing Status
US Module Testing Progress Report
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002

A bit of history u End of 1999 – CDF and DØ silicon detectors (~10 m 2 of silicon, ~2M channels) out of SiDet to be installed in collision halls u December 1999 – CMS made a decision to go with all silicon tracker = u 68m 2 (inner barrel and disks) + 164m 2 (outer barrel and disks) = 232m 2 u 5.1 M M = 10.7 M channels CDF SVX installation A natural decision for US institutions to join the silicon effort.

 Fermilab u B. Flaugher, R. Lipton, P. Rapidis, L. Spiegel, S. Tkaczyk  Kansas State University u T.Bolton,R.Demina,W.Kahl,S.Korjenevski, u W.Reay, R.Sidwell, N.Stanton  Northwestern University u D. Buchholz  Texas Tech University u A. Sill  University of California, Riverside u Gail Hanson  University of California, Santa Barbara u C.Campagnari, D. Hale, J.Incandela  University of Illinois, Chicago u L. Chabalina, C. Gerber  University of Kansas u P. Baringer, A. Bean, L. Christofek, X. Zhao  University of Rochester u R. Eusebi, E. Halkiadakis, A. Hocker, P. Tipton Si Tracker Group Two new groups Will provide important support for the UCSB production line

Silicon tracker in Spring 2000 u Single sided, low resistivity silicon sensors as a baseline technology qextensively tested by RD20 – rad hard to >10 Mrad qSeveral vendor qualified (6” production lines) u Working front end chip – APV25, some issues to be resolved with multiplexer chip – MUX PLL u Hybrids – two technologies considered u Mechanics in excellent state – a lot inherited from MSGC’s u Plan to start production in fall 2001

Outer Barrel Space Frame Spring 2000

Outer Barrel Rods Silicon modules Spring 2000

Automated assembly 3 TOB modules/ 30 min Gantry at CERN Spring 2000

SiTrkr Organization

Schedule Issues Schedule slipped by ~ a year qHybrid schedule is a concern  Decision on technology was made in September 2000  prototyping was semi- successful  might change the technology qFEDs  Initial models for testing of large quantities of FE hybrids and modules expected to be ready in late 2002  Optical models for rod testing will be available 6/03 qOptical hybrids for assembly of modules into Rods will be available in late 2002 Other critical items are performing better qGantries qPC based test stands qProbe stations qSensors

FE Hybrid status Industrial hybrid (V0 – unpackaged chips on ceramics) production started with 1 st Producer. 160 Hybrids delivered (yield 65%) They also say that “the feature size” of hybrid is too small for mass production.Industrial hybrid (V0 – unpackaged chips on ceramics) production started with 1 st Producer. 160 Hybrids delivered (yield 65%) They also say that “the feature size” of hybrid is too small for mass production. The 2 nd producer has still problems with shorts.The 2 nd producer has still problems with shorts. Design of the V1 version of the hybrid (packaged chips on ceramic- easier to produce) done. Send order to 1 st producer.Design of the V1 version of the hybrid (packaged chips on ceramic- easier to produce) done. Send order to 1 st producer. 40 substrates hybrids V2 (packaged chips on FR4) received, some 10 populated. Hybrids and substrates distributed for mechanical and electrical tests. They look ok. Likely change in technology choice.40 substrates hybrids V2 (packaged chips on FR4) received, some 10 populated. Hybrids and substrates distributed for mechanical and electrical tests. They look ok. Likely change in technology choice.

HIP and pinhole effects on APV25 u Highly Ionizing Particles qproduced in nuclear interactions, a rare phenomenon) qcan saturate entire APV for ~200 ns qResults in inefficiency of ~1.3% u Pinholes qLeakage current directly into APV25 qTypically disconnected from readout qSignal inefficiency of >=2 connected pinholes/APV qRate of new pinhole development <10/(few 100 wafers=1000 APV’s) u Fixes  Change resistor value on hybrid (100   50  ) qAPV inverter off – reduces dynamic range PSI test beam planned at the end of May to further study the effect US to provide modules

TOB Module ~20 cm Build 6,000 TOB modules Current plan 2/3:1/3 at FNAL:UCSB 2 sensors bonded together  PA  hybrid (4 APV25 chips)

CMS module production u Sensors probed at K-State u Automated module assembly system – Gantry - is fully commissioned at Fermilab u Placement accuracy <5um u 4 (+3) fully functional modules were delivered to CERN for test beam studies at PSI.

Module Testing at FNAL ARCS CMS DAQ Two test systems are now in operation at SiDet

From R&D to Production R&D CMS Tracker production