19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.

Slides:



Advertisements
Similar presentations
TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.
Advertisements

CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
The Tracker Dry Gas system was initially designed as a standalone unit meant to be operated through manual and pneumatically driven valves. The selection.
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Detector Cooling Project Thermosiphon Project Status Report
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
André Augustinus 16 September 2002 Safety issues.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
1 1 KPS Leak Detection No maintenance and perfect for retro-fit.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
60kW Thermosiphon control system
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
G. Bolla For the CMS Pixel Group 2/25/20161 Status at P5 and infrastructures (mainly cooling) Status at P5 and infrastructures (mainly cooling)
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
Installation of the T600 at Fermilab CSN2, September 22,
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
E.Focardi1 Tracker cooling plant Plant description Operational experience Upgrade project.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Demineralised water cooling system
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Forum on Tracking Detector Mechanics - Bonn, May 2016
EN-CV Progress EHN1 Extension Project
Tracker cooling loop “check out” draft for discussion
M. Battistin CERN EN/CV/DC 9th July 2009
Preparation of the activities for the LHC Long Shutdown 2
Teleconference ACS – FREIA 31st October 2017
COMPONENTS OF SOLAR WATER HEATER
Overarching Commissioning Plan
LEBT water cooling system
Presentation transcript:

19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready to go cold –Preshower smooth operation –Thermal Screen ready to operate Water systems –Castor/Totem cooling plants under construction –Filter cleaning campaign on Al demineralized circuits –Upgrade of Muon/RPC primary heat exchanger under study CMS cooling: status and plans Detector cooling project, 19 May 2009

19 May 09P. Tropea2 Fluorocarbon systems: what’s been done SS1 Copper piping between cooling plant and Tracker (1-23 Apr) New air purge system installation (27 Apr) Pneumatic connections (27-29 Apr) Tank and plant pressure test (28 Apr) Leak test (29 Apr-15 May) Checkout of pneumatic connections (7-8 May, EN/CV) New sensor installation and cabling (4 May) Sensor connection and checkout (14 May, EN/CV) Filling of the tank (15-18 May, EN/CV)SS2 Copper piping between cooling plant and Tracker (25 Apr- 13 May) New air purge system installation (15 May) Pneumatic connections (19 May)Pixels New cabinet insulation (13-15 May) Pipe insulation (18 May)Monitoring All sensors installed, cables pulled to PLC

19 May 09P. Tropea3 Fluorocarbon systems: what comes next SS1 Commissioning (EN/CV) Balancing DCS testSS2 Pneumatic connections (May 19) Tank and plant pressure test (May 19) Leak test (May 25) Checkout of pneumatic connections (EN/CV+CMS) Sensor connection and checkout (EN/CV) Filling of the tank and plant (EN/CV) Commissioning (EN/CV) Balancing DCS test Both x SS1 & SS2 Both x SS1 & SS2 : insulation and cabinet doors (in 3 weeks)Monitoring New cabinet installation Sensor connections and checkout DCS implementation

19 May 09P. Tropea4 Possible improvements and open issues Lack of communication/tracking of activities: 18 Mar: filling of Pixels plant: nobody recorded batch numbers and real qty of fluid put into the plant May: missing labels/electrical schemes for CMS sensors, no communication on unplugged sensors: 1 day additional work before commissioning on SS1 for EN/CV 11 May: Pixels plant stop (announced), when re-starting very low T inside detector, no alarm, panic mode btw users… Pending issues Pending issues: Piloting of manifold valves from PLC/DCS Approval of PLC requirements on EDMS SCY file: details and planning for DCS implementation Monitoring: planning and DCS implementation Procedure for filling cooling loops Leak-trough valves on manifolds/filters