CONSTRUCTION 05.02.2013 1 Andrea d'AURIA PH / DT-DI / GAS.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Module 6 : Flow control valves
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
SchedulingProducingControllingSchedulingProducingControlling.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th february 2011 CERN1 Straw Material and development.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
MKT May 2012 C850: Fast sliding gate operator. MKT May 2012 Summary  Why a fast slider operator?  USPs  Applications  Details  Technical specifications.
SUMMER TRAINING AT UCAL FUEL SYSTEM LIMITED, GURGAON 1.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Compressor status AWAKE Technical Board meeting 19 August 2015.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
SchedulingProducingControllingSchedulingProducingControlling.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
 Students will be able to: ◦ Define and apply theorems about parallel and perpendicular lines ◦ Relate parallel and perpendicular lines.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
PREZENTACJA WSPÓŁFINANSOWANA PRZEZ UNIĘ EUROPEJSKĄ ZE ŚRODKÓW EUROPEJSKIEGO FUNDUSZ SPOŁECZNEGO W RAMACH PROJEKTU MBM – KIERUNEK ZAMAWIANY.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
SchedulingProducingControllingSchedulingProducingControlling.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
PLAN PRESENTATION ABSTRACT. INTRODUCTION This system has been devised and developed by T.D.Williamson Inc. to enable pipeline operators to carry out maintenance,
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
DCal-ALICE integration and installation plan and status A. Tauro.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Single Spoke Resonator SSR1 Construction Status P.N.Prakash Inter-University Accelerator Centre, New Delhi, INDIA.
LBNF CAD models, Drawings and Component list
Internship final presentation
Ti/SS transitions A.Basti INFN-PISA*
new straw end plug: D=10.6 mm straws support frame Levan option
Enrique Calvo Alamillo DAEGU
Status of the CO2 Cooling Project
Flexible lines assembly
Update on Junction Box Design
BMXP Operation Memo Taper Cutting --Laid abnormity.
Cryostat design Mechanical design: Thermal screens: Specifications:
Status of the PANDA Solenoid Magnet Production in BINP
Teleconference ACS – FREIA 20th February 2018
On the accuracy of port assembly at Wendelstein 7-X
Manufacturing Production Planning
UPPSALA UNIVERSITY_GERSEMI PROJECT
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS

 Status of orders  Drawing for construction  Construction  Control and validation  Expected delivery Andrea d'AURIA PH / DT-DI / GAS 2

We sent since June 2012, more than 70 orders for an amount exceeding 300’000 chf. All main component have been tested before. The choice and the purchases of certain component has been long, due to their technical specifications: -40 degrees, pressure around 160 bars etc… But today we have received all the component Some pictures of components : Manifold pneumatic valve Safety valve Plant Pneumatic valve Andrea d'AURIA PH / DT-DI / GAS

4 The 3D drawing are not adapted for the construction. To support the construction N. Siegrist designed and quoted from the CATIA model all the different pieces of the 2 modules. In total more than 60 drawings 2D have been created to start the construction : Andrea d'AURIA PH / DT-DI / GAS

5 We started the construction 2 months ago, separating in 2 modules The project: Andrea d'AURIA PH / DT-DI / GAS The plant The manifold

6 Each module are composed of 2 sets : The support and box The component and piping Plant Manifolds Plant

7 The 2 boxes have been sent to an external factory for machining holes : Sise: 1360 x 1000 x 1040mm Sise: 1200x900x2000mm During this time we built the 2 internals support Andrea d'AURIA PH / DT-DI / GAS

8 Considering the number of component received. We started to built the manifold. Andrea d'AURIA PH / DT-DI / GAS Manifolds Plant The frame has been built by Lyon Institute.

9 We started to put the components on the support and weld the pipes. We built a temporary template, fixed on the top of the support to install and adjust the pipe in the final position. Andrea d'AURIA PH / DT-DI / GAS

10 Andrea d'AURIA PH / DT-DI / GAS

11 One supply assembly Andrea d'AURIA PH / DT-DI / GAS

12 Andrea d'AURIA PH / DT-DI / GAS

Andrea d'AURIA PH / DT1 / GAS 13

14 The security decided that 100% of the welding should have a visual check and 10 % of each size should have a x ray control. To be sure that all the welding are correctly controlled, we have created a numbering of each pipe. Andrea d'AURIA PH / DT-DI / GAS A drawing of each pipe has been done. Each drawing contain all the welding with their numbering

15 Main drawing for each pipe with numbers Andrea d'AURIA PH / DT-DI / GAS

16 All the data are put in a common table where we found all the numbers and date of control TUBE N° SOUDURE N° DATE TAILLE TUYAUX CONTRÔLE VISUEL REPARATIONX-RAY 6 mm 12 mm 1"OKNOKOKNOKOKNOK CSMC_TIF_SA CSMC_TIF_SB CSMC_TIF_SC CSMC_TIF_SD Andrea d'AURIA PH / DT-DI / GAS

17 Andrea d'AURIA PH / DT-DI / GAS