Designing and Implementing an Output- Based Aid (OBA) Project in the Bank Patricia Veevers-Carter, Program Manager Global Partnership on Output-Based Aid.

Slides:



Advertisements
Similar presentations
21 July 2005 UNDG Policy Network On the MDGs UNDG Policy Network on the MDGs.
Advertisements

Good governance for water, sanitation and hygiene services
Public Private Partnerships and Development Razvojni program ujedinjenih nacija.
Financial Management in projects involving Output- based Aid Xavier Chauvot de Beauchêne GPOBA SDN Week Washington, DC February 27, 2008.
PUBLIC PRIVATE PARTNERSHIPS Taking a Balanced Look…. Development Equity Associates Inc. Nov. 14,
Leveraging Community Capacity Financing Civil Society at the Local Level World Bank-InterAction Workshop Samantha de Silva, HDNSP March 02, 2006.
Company LOGO Performance- or Output-Based Procurement (PBP): Basics and Applications in Bank Projects Patricia Baquero
International Procurement Agency BV USE OF PROCUREMENT AGENTS IN PUBLIC PROCUREMENT ADB REGIONAL SEMINAR SEPTEMBER 5 - 7, 2012 Presented.
Flowchart on Procurement Guidance for a proposed OBA scheme Is the project involving an existing service provider (SP) ? YES NO PROJECT PREPARATION Are.
With an application to primary schooling William D. Savedoff and Ayah Mahgoub World Bank - Washington, D.C. - June 14, 2010 Cash on Delivery: A new approach.
Ray C. Rist The World Bank Washington, D.C.
“Vouchers for Services and Supplies ” Christine Namayanja, Programme Director, Marie Stopes International Uganda 28 th May| Reproductive Health Supplies.
GLOBAL LESSONS: DESIGNING CDD OPERATIONS Samantha de Silva HDNSP April 2005.
A Delegated Management Model to Improve Water Supply Delivery within Informal Settlements: Lessons learned from Nyalenda, Kisumu. Alain MOREL Sr Water.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
ARMENIA: OBA SCHEME FOR PROVISION OF GAS AND HEATING GPOBA SDN week Washington D.C. February, 2008.
World Bank Infrastructure Response to the Crisis World Bank Infrastructure Response to the Crisis Overview.
Financing Urban Public Infrastructure
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
AN INTRODUCTION Country Systems. Outline 1. What are Country Systems? 2. What does it mean to use country systems? 3. Why does the ‘use of country systems’
11 A Conversation with Our Grantees Water, Sanitation & Hygiene Initiative Bill & Melinda Gates Foundation 5 th World Water Forum Istanbul, Turkey March.
Designing Output-Based Aid Projects. Designing OBA and SIB Projects Basic Elements A. A.Determining the output: What service is to be provided? B. B.Reaching.
A Microfinance Solution for Water, Sanitation, and Health in Peri-Urban and Rural Areas Presented at the Fifth World Water ForumDr. Richard E. Thorsten.
Agricultural Risk Financing Ramiro Iturrioz Senior Agricultural Insurance Specialist Insurance for the Poor Program The World Bank Agricultural Insurance.
Legal Issues in design, preparation and implementation of projects involving Output-based Aid Legal Issues in design, preparation and implementation of.
Prof. Valeria Termini AEEGSI Commissioner CEER Vice-President CEER DSO WG co-Chair The Future Role of European DSOs 1.
Innovative funding for infrastructure services: the use of Output Based Aid in the Honduras water sector Cledan Mandri-Perrott Infrastructure, Economics.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Private involvement in education: Measuring Impacts Felipe Barrera-Osorio HDN Education Public-Private Partnerships in Education, Washington, DC, March.
Results-based financing Why? What? How?. Jagaman district just erected a new health center and the health workers have started work. What are health workers.
Krakow, Poland September 24-26, 2014 Results-Based Financing Approaches.
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
Development of PES conceptDevelopment of PES concept Development of PES programDevelopment of PES program ImplementationImplementation OperationOperation.
Mainstreaming OBA in the Bank: Urban and Energy Examples Patricia Veevers-Carter Program Manager Global Partnership on Output-Based Aid (GPOBA) Finance,
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
OBA to date: Lessons, Challenges and Mainstreaming Yogita Mumssen Infrastructure Economist Global Partnership on Output-Based Aid (GPOBA) Finance, Economics.
Kiichiro Fukasaku Development Centre
Anne Lyche Solheim, Senior researcher, Norwegian Institute for Water Research (NIVA) World Bank Group and the Private Sector, CMI seminar 14th June 2005.
RBM at an Agency Level Cedric Saldanha Melbourne (613)
Output Based Fund for improved infrastructure investment Cledan Mandri-Perrott Fiduciary Forum (March 25-28) A strategy for targeted, transparent and sustainable.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
Financing Alternatives in WSPs Patrick Nduati Mwangi, WASPA Conference, September 2011 Water and Sanitation Program.
1 Implementing a Private Sector Arrangement Penelope Brook The World Bank.
FM for Specialized Operations Fiduciary Forum’08 Washington DC.
DELIVERING ECONOMIC INFRASTRUCTURE USING PUBLIC PRIVATE PARTNERSHIPS – CAN TRANSPORT SHOW THE WAY? The OECD estimates that $53tn of investment is required.
OUTPUT BASED AID (OBA) Financial Management Perspective Saidou Diop Financial Management Specialist Senegal and The Gambia Co AFTFM The World Bank Washington.
April Why a New Instrument? Change in client demand: Clients want Bank support for government’s own programs and increased focus on results. This.
A conceptual framework for the design, implementation, and monitoring of a sub- national government capacity building strategy Options, Strategies and.
GPOBA and Conclusions Patricia Veevers-Carter, Program Manager Global Partnership on Output-Based Aid (GPOBA) Finance, Economics and Urban Development.
FINANCIAL SUSTAINABILITY OF WSPs: Overcoming the Barriers Eng. PETER NJAGGAH WASREB, Kenya Innovative Water Sector financing.7 th – 12 th November 2011,
Raising finance for a ULB Strengthening Urban Management ASCI / WBI Workshop, January 21, 2003.
ARMENIA: OBA SCHEME FOR PROVISION OF GAS AND HEATING Washington D.C. March 8, 2006 Energy Week.
Public versus Private Provision of Public Services Philip Gray PSAS Presentation to Poverty Day October 17 th 2002.
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
Copyright © 2009 International Water Association Public-public partnerships: Potential and constraints of WOPs Tom Williams, Programme Manager, IWA.
PAS Project 1 Benchmarking of urban water and sanitation in emerging economies Introduction CEPT UNIVERSITY.
11/06/20161 Transport sector - Preparing for next programming period: SEA as part of ex-ante conditionality and ex-ante evaluation Adina Relicovschi Senior.
Delivering Global Goals in human settlements and city regions by 2030 with data partnerships #roadmap rd May 2016 WMO, Geneva Stephen Passmore Head.
Procurement Issues in Structuring OBA Projects: Guidance Note for Staff Procurement Issues in Structuring OBA Projects: Guidance Note for Staff Xavier.
Patricia Baquero, Sr. Procurement Specialist February 27, 2008
State of efficiency in the WASH sector Status quo is not an option
Sewerage and Sanitation Policies in Indonesia
Bangladesh access to sanitation
Descriptive Analysis of Performance-Based Financing Education Project in Burundi Victoria Ryan World Bank Group May 16, 2017.
April 2011.
Program for Results Financing The European Social Fund Committee
progress of the water reform in bulgaria
The Role of Private Sector in Capital Budgeting
ACCESS TO SUSTAINABLE ENERGY PROJECT
Presentation transcript:

Designing and Implementing an Output- Based Aid (OBA) Project in the Bank Patricia Veevers-Carter, Program Manager Global Partnership on Output-Based Aid Finance, Economics and Urban Department World Bank SDN Week Washington, DC February 27, 2008

2 Agenda 1. Introduction“What is OBA”; experience to date; how OBA has evolved in the Bank; Lessons Learned Patricia Veevers-Carter, GPOBA 2. Bank Processes and OBA Procurement, Financial Management, Disbursement (incumbents vs. greenfields, flow of funds/fiduciary agents, etc) Procurement: Patricia de Baquero, OPCPR LEG: Edith Ruguru Mwenda, LEGAF LOA: Junxue Chu, LOAFC FM: TBD 3. OBA Case Study Senegal On-Site SanitationSylvie Debomy, AFTU2 4. GPOBA and Concluding Remarks GPOBA and ConclusionsPatricia Veevers-Carter

3 What is Output-Based Aid? Output-Based Aid (OBA) is one method for improving the delivery of basic services – such as water and electricity– when the inability of users to pay full cost would justify performance-based subsidies to complement or replace user fees. Under OBA, service providers are for the most part paid after delivery of the agreed output. Therefore the disbursement of the subsidy is linked to the delivery of a specified output.

4 OBA Core Concepts Explicit subsidies: Ensures transparency -- who provides subsidies for what. Lends easily to targeting the poor. Payment on output delivery: Shifts performance risk to provider by making him accountable. Innovation and efficiency : Predetermined subsidy paid on agreed outputs instead of inputs provides incentives for innovation and efficiency; competition or bench-marking could lead to value-for-money Mobilizing the private sector: Encourages private sector to serve targeted (usually poor) customers; opportunity to leverage private finance and expertise for non-subsidized customers as well. Monitoring: Internalizes tracking of results Sustainability: Subsidies that minimize distortions in consumption; stresses final results and source of future funding

5 Example of a typical OBA Project Municipality Provider Poor Communities not yet connected OBA Fund Financial Intermediary Subsidy (4) Output Delivered = Connections Installed, service delivered (2) Greenfield or Incumbent Provider (private or public) Water or Sanitation Services, for example Concession contract or other form of Legal mandate Verification Agent (3) One-off connection subsidy Consumption Transitional subsidy Consumption subsidy Pre-finance (1)

6 OBA Experience To Date (as of Dec 31, 2007) OBA Projects by Sector Water 32% Transport 14% Energy 22% Telecom 19% Social 13%

7 Analysis Of Some Initial Projects Evaluation Criteria Pilot results Targeting:- Mostly geographic targeting to poor communities Accountability- Mostly ex post connection payment tied to service contract Innovation & efficiency - Providers paid bid price but free to design (meeting quality specs) - Competitive bidding on lowest subsidy required, or, benchmarking, when incumbents Mobilizing private sector - Local private sector playing a larger role - Extent of “leveraging” dependent on sector and country/region Sustainability- Most projects involve a one-time connection subsidy (but part of payment with-held until several months of service delivered)

8 Key Emerging Issues/Challenges Who has the incentive to deliver outputs? Is the sector amenable to OBA? Access to finance to pre-finance outputs key constraint Need a supportive regulatory framework Minimizing subsidy payment risk once outputs delivered is critical Method/accuracy targeting beneficiaries Monitoring of outputs -- local capacity, corruption A new way of working, and initial start-up costs –Initial transactions costs due to “learning” –mostly pilots (small by definition)

Thank you. Please visit us at