Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

INTERNATIONAL FINANCIAL CONSULTING EGTT Workshop, September 27-29, 2004 Montreal, Canada Are Export Credit Agencies and Other Traditional Sources of Infrastructure.
Introduction to Public Private Partnerships
1 Creating Opportunities with World Bank Guarantees Banking and Debt Management (BDM) World Bank Treasury January 7, 2010.
UK and Rwanda Trade & Investment Forum 22 nd October 2014 Confidential Changing the Game for Africa.
US-Africa Infrastructure Conference Private Equity Workshop Washington, DC October 7, 2008.
Mobilizing Institutional Investment in Africa Stockholm, 22 th October 2014 Changing the Game for Africa.
What is the ADF Partial Risk Guarantee? Partial Risk Guarantees (PRGs), also known as political risk guarantees, cover private lenders and investors against.
Understanding the different Bank Group Guarantee Instruments
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
The World Bank Group Instruments
The World Bank Group Instruments. The World Bank World Bank Group financing and risk mitigation instruments IBRD/IDA MIGAIFC IBRD Loan for middle income.
World Bank Infrastructure Response to the Crisis World Bank Infrastructure Response to the Crisis Overview.
1 Role of the African Development Bank in Developing Clean Investments Mrs. Hela Cheikhrouhou – Manager Infrastructure Finance, Private Sector Operations,
The EU Investment Plan and ESI funds S TRUCTURED D IALOGUE WITH ESIF PARTNERS GROUP OF EXPERTS B RUSSELS, 23 A PRIL 2015.
1 Hela Cheikhrouhou Manager, Private Sector Infrastructure Finance Africa Carbon Forum, Nairobi, March 2010 African projects and programs: Developing enhanced.
Regional Policy "Off-the-shelf" financial instruments July2013.
Financing Urban Public Infrastructure
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Possible Modalities of Government Support for Private Clean Energy Investments/Financing Government support could be in different forms depending on types.
UNDP & the Business SectorBureau for Resources and Strategic Partnerships Business, sustainable development and the MDGs: A changing landscape.
IFC Power March 2009 Sarajevo, Bosnia and Herzegovina.
MULTILATERAL INVESTMENT GUARANTEE AGENCY WORLD BANK GROUP 1 MIGA: Managing Risk in a Challenging Environment Pristina, Kosovo, May 2013.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
SOLAR PARK TP Nchocho Group Executive: Investment Banking Division 28 October 2010 Development Bank of Southern Africa.
Financial Sustainability: Importance, Progress and Emerging Issues Jamal Saghir Director Energy, Transport and Water The World Bank Istanbul March 18,
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
Policies in promoting private finance For Local Government Infrastructure Washington, 01 October 2004 Policies in promoting private finance For Local Government.
Private Sector Operations The AfDB as a Development and Business Partner July 20, 2011.
1 ABSTRACT PRESENTATION OF THE FINANCIAL STRATEGY FOUNDER OF INSFRASTRUCTURE SUSTAINABLE DEVELOPMENT RK B.O.T PROGRAM.
Public support from the Netherlands to the financial sector Wiert Wiertsema, Senior Policy Advisor, Both ENDS.
Legal Issues in design, preparation and implementation of projects involving Output-based Aid Legal Issues in design, preparation and implementation of.
Forum on Sustainable Energy, Good Governance and Electricity Regulation The Need for an Effective Regulatory Regime: The Case for Increasing Clean Energy.
Innovative funding for infrastructure services: the use of Output Based Aid in the Honduras water sector Cledan Mandri-Perrott Infrastructure, Economics.
Seite 1 REETA Planning Workshop, Georgetown 11./12. February 2014 Developing Public-Private Partnerships for Sustainable Energy.
Financing Opportunities through the EBRD. What is the EBRD?
III Astana Economic Forum. Ensuring Sustainable Economic Growth of Countries in Post-Crisis Period July 1-2, 2010 JSC «Kazakhstan public-private partnership.
Financing for Development United Nations Risk Mitigation for Mobilizing Private Sector Investments in Infrastructure in Developing Countries Pradeep Singh.
Doing Business With OPIC. OPIC’s Mission Statement “To mobilize and facilitate the participation of the United States capital and skills in the economic.
:: February 2005 :: :: presentation to :: Global Water PPPs : Meeting the Challenge Richard M. Temple Hogan & Hartson One Angel Court London EC2R 7HJ Tel:
Public Private Partnerships (PPPs) and The World Bank
International Seminar on Energy Cooperation in Northeast Asia : Directions and Implementation Korea Energy Economics Institute Financing of Energy Infrastructure.
1 European Investment Bank Africa EU Workshop, Addis Ababa, 6 October 2009 Accessing EIB Resources EUROPEAN INVESTMENT BANK.
Designing and Implementing an Output- Based Aid (OBA) Project in the Bank Patricia Veevers-Carter, Program Manager Global Partnership on Output-Based Aid.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
Agence Française de Développement – AFD – Page 1 Alexis BONNEL Sector Operations Agence Française de Développement Infrastructure Trust Fund.
-0- June 2006 EU Infrastructure Trust Fund. The EU - Africa Partnership on Infrastructure and the Trust Fund Antonio Garcia Fragio Head of Division Transport,
Mainstreaming OBA in the Bank: Urban and Energy Examples Patricia Veevers-Carter Program Manager Global Partnership on Output-Based Aid (GPOBA) Finance,
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Oesterreichische Entwicklungsbank AG - OeEB Austrian Business Circle Belgrade – Sabine Gaber / Head of Investment Finance Department OeEB.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
OBA to date: Lessons, Challenges and Mainstreaming Yogita Mumssen Infrastructure Economist Global Partnership on Output-Based Aid (GPOBA) Finance, Economics.
National Planning Department. Mobilizing private investment for low carbon development October 14 th, 2015.
Session IV: Finding the Right Instruments, and Using them Correctly Hiroto ARAKAWA Executive Director Japan Bank for International Cooperation (JBIC) July.
Financing Alternatives in WSPs Patrick Nduati Mwangi, WASPA Conference, September 2011 Water and Sanitation Program.
IFC AT A GLANCE FINANCE OPPORTUNITIES FOR THE PRIVATE SECTOR.
MEDEF MEETING March 7, 2012 A.T. Shaukat Chief Engineer Global Infrastructure & Natural Resources.
THE WORLD BANK History Since inception in 1944, the World Bank has expanded from a single institution to a closely associated.
Ideas to engage GEF and carbon finance under GEF-5 Input from IDB Washington D.C. 15 November 2010.
Energy Transition: Reforms, Investment and the Post-Paris Agenda Dr. Robert Ichord CEO, ICHORD VENTURES, LLC February 4, 2016.
Fostering Infrastructure in LAC IDB Infrastructure Fund Inter-American Development Bank Federico Basañes Infrastructure Fund Coordinator.
Engaging National and Regional Finance Wolfgang Mostert SE4All workshop, Danida/UNEP-Risoe Copenhagen,
1 European Investment Bank EIB's support for Energy Efficiency & Renewable Energy Investment in cities and regions - European Local Energy Assistance (ELENA)
Supporting Scaled Up Private Investments in Clean Energy Infrastructure. Washington, D.C., October 6&7, 2014.
Changing the Game for Africa IISA Conference July 2016.
Kamleshwar Khelawan, Senior Energy Specialist,
Elena Petkova Yasen Andreev 76324
The Changing Landscape for Renewable Energy Financing and Support
The New Bank and Private Sector Activities
Scaling up Partial Risk Guarantees:
Presentation transcript:

Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and emerging trends Addis Ababa, June 30-July 1, 2011 UNECA-KEEI High Level Workshop

Summary  Presentation discusses approaches and instruments to support significantly increased private sector investment in generation and access.  For delivering generation  Project preparation issues  Project structuring and risk mitigation  Delivering access  Funding/risk mitigation mechanism 2

Delivering generation: key issues  Project leadership  Sector and project preparation  Project structuring/risk mitigation 3

Preparing bankable project packages requires significant preparation activities/funds  Policy & regulatory support  Project specific preparation  Definition of project package goals  Project design  Feasibility studies: social, economic, financial, technical, environmental and administrative.  Cost benefit analysis  selection of sponsor  transaction advisors – legal, financial, technical (to help deliver fair & equitable deal) 4

Currently significant fragmentation in project preparation funding sources  For key projects in Africa, estimated need for c. USD 1.3bn (ranging from USD10-200m per project).  Size limits of preparation funds from each facility tend to be low in comparison with project needs.  Need for significant extra funds.  Need for coordination and consolidation between sources of project preparation funds. 5

MDBs work to deliver financial closure and project implementation  Specific financing instruments to support transaction:  Loan to government creating government equity contribution to PPPs  Loans to private sector  Partial Risk Guarantees  Political Risk Insurance 6

Partial Risk Guarantee structure 7 Partial Risk Guarantee Indemnity agreement Loan Agreement Implementation Agreement Government Commercial Lender Government Utility PPA payments Project Company Project Agreement

PRGs are instrumental for leveraging in private sector on large projects  For the Lao PDR Hydropower project (Nam Theun 2):  private sector indicated that project only possible with a risk mitigation package backed by the World Bank.  Package needed to mitigate the political and regulatory risks of investing in the power sector in Laos and dependency on revenues from neighboring Thailand (due to exports of power).  The World Bank provided an IDA PRG of USD42m, a MIGA debt guarantee of USD91m and a MIGA equity guarantee of USD150m.  USD1.17bn of private capital was mobilized. 8

Delivering access: key issues  Institutional arrangements  Funding/risk mitigation mechanism 9

Mechanism to encourage private sector Service Providers: Output-based Aid 10 Municipality Provider Poor Communities not yet connected OBA Fund Financial Intermediary Subsidy (4) Output Delivered = Connections Installed, service delivered (2) Greenfield or Incumbent Provider (private or public) Water, Sanitation, Electricity, Telecoms or Transport Services Concession contract or other form of Legal mandate Verification Agent (3) One-off connection subsidy Consumption Transitional subsidy Consumption subsidy Pre-finance (1)

OBA supports the delivery of access  Determine the service to be provided (the output)  End recipients are targeted (low income)  Subsidies set at an efficient level  Designed on case-by-case basis with sustainability in mind. Process for determining what the level of subsidy should be.  Based on competitive process or efficient unit price discovery – not actual cost.  Design appropriate institutional arrangements – independent verification  Projects continually monitored and regularly improved upon.  Everything is designed up front & can be monitored 11

Significant experience with OBA  2002: 32 projects identified - $1.5 billion WBG funding  2010: 131 projects identified - $3.5 billion WBG funding (excl. $2.8 bn government financing)  66 projects identified outside the WBG  51 Global Partnership on Output-Based Aid (GPOBA) projects, mainly in water, health and energy, of US$153 m value (committed)  Evidence base is increasing (34 projects closed, 78 under implementation)  So far $1 of subsidy has leveraged $2 of private financing; varies by sector and region 12

Mustafa Zakir Hussain Senior Infrastructure Finance Specialist The World Bank More info on Guarantees: More info on Output-based Aid: 13

14