SuDS Approval Bodies. Floods and Water Management Act 2010 The Flood and Water Management Act 2010 received royal assent in April 2010, and it implements.

Slides:



Advertisements
Similar presentations
Special Recognition Cheryl Wilson, State Auditor and Inspectors Office Presented by Ann Embree and Sherri Schieffer County Training Program and Oklahoma.
Advertisements

Code for sustainable homes Water efficiency and surface water runoff Jonathan Reed Atkins Water & Environment.
SuDS Kerrie Ginns, Andrew Leadbetter & Paul Burrows Environment Agency
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Azerbaijan Republic State Committee on Property İssues Unified State Cadastre of Real Estate is the Foundation for transparent registration in Azerbaijan.
I2I2 Integrating Intermodal The Port of Huntington Tri-State Global Trade Center.
Rushcliffe Borough Council Development Management Process Changes to Planning Legislation Andrew Pegram Service Manager, Communities February 2015.
Adapting the city. Water Infrastructure & Climate Change Chris Matthews.
Highway Adoption Implementation Stage Highway Adoption Implementation Stage Steve Johnson Head of Network Management.
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Planning Permission Process and Procedures
1 Water Services Planning J.McGowan Senior Engineer May 2014 Kildare County Council Water Services.
Surface Water Drainage Latest policy and practice in respect of surface water drainage and delivery of competitive solutions August 2013 Claire Cornmell.
City of Murrieta C5 – Water Efficient Landscape Ordinance City Council.
Renfrewshire Council Interreg III B NWE Urban Water Project Strand No 3 Spatial Management of Water Infrastructure Regeneration.
Members Seminar 15 September 2014 Flood Risk Christina Harrhy – Chief Officer, Neighbourhood Services Stephen Jarrett, Andrew Villars, Mark Strickland.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Introduction to Public Hospital Districts April 25, 2002 Association of Washington Public Hospital Districts.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Trail Funding Sources & General Information
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Climate Change and the Planning Process Michael Jenkins Principal Sustainable Development Officer.
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
ROAD ADOPTION PROCESS TOPIC GROUP OVERVIEW OF HCC ROAD ADOPTION PROCESS DAVID HUMBY 24 TH & 25 TH FEBRUARY 2010.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
2 nd Annual meeting Athens, January 2006 Legal Protection of Transitional Waters in Greece Dr. Petros Patronos / Dr. Vivi Roumeliotou Nomos + Physis.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Managing flood risk Sustainable Drainage Systems Graham Brown, Flood and Water Manager Thursday 20th August 2015 Swaffham Town Council.
Welcome and overview SuDS delivery and the Standards.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Planning After the Localism Act.
A wide range of clients Housing associations 3 rd sector bodies Private companies supplying services to the public sector Colleges and government bodies.
Management of road adoption of active and historic road schemes Steve Johnson Head of Network Management.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Using The Local Land & Property Gazetteer Using The Local Land & Property Gazetteer.
INFORMATIONAL MEETING AGGREGATE OPERATION PROPOSAL Add picture.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
ITTS Freight in the Southeast Conference Charlotte, North Carolina February 9, 2011.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
 Section (2), Florida Statutes, requires each local government to maintain a comprehensive plan of the type and in the manner set out in this.
Introduction to sustainable drainage
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Industry Dialogue on xoserve Services 14 th September 2007.
 Section (2), Florida Statutes, requires each local government to maintain a comprehensive plan of the type and in the manner set out in this.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Department of Environmental Quality Life-of-Site Permitting Required Changes to Solid Waste Management Rules 15A NCAC 13B March 10, 2016.
ROAD INFRASTRUCTURE SAFETY MANAGEMENT DIRECTIVE (RISM) Harry Cullen SPM Road Safety, National Roads Authority, Ireland Chairman of CEDR Technical Group.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
LONDON SUSTAINABLE DRAINAGE ACTION PLAN Kevin Reid Principal Programme Manager Greater London Authority 11 May 2015.
CHARTER REVIEW COMMITTEE Chatham. Charter Review Committee Section 8-2 Periodic Charter Review  At least once every five years a special.
Nwlpp Northumbrian Water Limited 9 October nwlpp Flooding - water company perspective Geoff Hartis Sewerage Operations Manager.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
Community Improvement Districts County Counselors Association of Kansas Annual Meeting November 15, 2010 Janet S. Garms
How to Protect the Local Environment
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
Introduction to Planning
Sanitation is Business
Elections – Dispensing with Primaries
Code Governance Review UNC Modification Proposals
Public Information Centre
Are Tiered Conservation Rates Valid?
AUTHORS: JUAN GARCIA RYAN CHERRINGTON LEE McMELLON.
Presentation transcript:

SuDS Approval Bodies

Floods and Water Management Act 2010 The Flood and Water Management Act 2010 received royal assent in April 2010, and it implements a number of recommendations for the Pitt Review that followed the devastating 2007 floods. Schedule 3 of the Act, which is likely to be commenced in October, is concerned with SuDS.

SAB With regards to SuDS and surface water drainage, the Act calls for the establishment of a SuDS Approving Body (SAB) to be set up in either county, county borough or unitary local authorities. The SAB is to sit within the Highways and Transportation as we are the Lead Local Flood Authority

SAB The Act also amends Section 106 of Water Industry Act (1991) to make the right to connect surface water to public sewers conditional on the SAB approving the drainage system as meeting the National Standards.

SAB the SAB will be responsible for approving, adopting and maintaining drainage plans and SuDS schemes that meet the National Standards for sustainable drainage. Any drainage scheme will need to be approved prior to the commencement of construction work, so the SAB approval process will run in parallel with general planning applications

Who is the SAB Highways and Transportation Development Control Building Control Landscape Development Regeneration Officers Legal Services Streetscene Services + others

What is required Developers will have to talk to the SAB early in the design stage, the following will have to be taken into consideration Overland Flows Exceedance flows Run-off destination Peak flow rates Volume Water quality

Local requirements The SAB will be able to set its own local requirements however these will have to be published. These can be related to the provision of biodiversity and amenity. Construction method statements Maintenance plans

The Process SAB applications will be sent in either as a stand alone or combined with a planning application. This will be done via the planning portal. Applications will have to be validated with in 5 days however if part is missing then applicant will have a further 7 days to make good. If application is very poor it shall be returned to applicant with fee. An application fee will be charged, these have been laid down by the Government

The Process The SAB will have 12 weeks to determine the application Statutory consultees – Environment Agency – Northumbrian Water Limited – Highways Authority

The process The SAB can place conditions for Non performance bonds Inspection fees Maintenance period Legal agreements will be needed for adoptions

The Process Inspections will be taken during construction Upon completion any SuDS on private properties will need to be designated via a local land charge SuDS will also have to be placed on the asset register