J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.

Slides:



Advertisements
Similar presentations
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Advertisements

USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
ISIS Accelerator Division
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
CAT-KEK-Sokendai School on Spallation Neutron Sources 1 Rapid Cycling Synchrotron (I) CAT-KEK-Sokendai School on Spallation Neutron Sources K. Endo (KEK)
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
MW Upgrades for the ISIS Facility John Thomason. OptionCommentsBeam Power (MW) Neutron Yield 1(a)Add 180 MeV LinacTechnical Issues~ (b)Add 800.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Development of the beam loss monitor for beam halo measurement in the J-PARC RCS Masahiro Yoshimoto *, Hiroyuki Harada, Shinidhi Kato, Kota Okabe, Michikazu.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
FFAG Accelerators for Proton Driver Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
COMET Task Force 16/Oct/2008 J-PARC PAC meeting Satoshi MIHARA.
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
High power beam operation at J-PARC: status and future
J-PARC main ring lattice An overview
Injection and Extraction in the J-PARC RCS
1- Short pulse neutron source
Injector Chain General and more about p-RCS
Injector Chain General and more about p-RCS/i-RCS
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
A Design Study of a Compressor ring for
SLHC-PP kick-off meeting, CERN 9 April 2008
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade

Materials and Life Science Experimental Facility Hadron Beam Facility Neutrino to Kamiokande Nuclear Transmutation Facility 50 GeV Synchrotron (MR) 3 GeV Synchrotron (RCS) Linac (350m) J-PARC Facility

Linac structures and parameters Ion Source: Volume Production Type RFQ: Stabilized Loop DTL: Electro-Quad in DT, 3 tanks Separated DTL(SDTL): no quad in DT, short tank(5cells), 32tanks Annular Coupled Structure (ACS): axial symmetric Super Conducting Linac (SCL): wide aperture, high acceleration gradient particles: H - Energy: 181 MeV (RCS injection) 400 MeV (RCS injection) 600 MeV (to ADS) Peak current: MeV Repetition: 25 Hz (RCS Injection) 50 Hz(RCS Injection + ADS application) Pulse width: 0.5 msec

3GeV Synchrotron (RCS) To MR or MLF RF collimators From Linac Circumference348.3m Repetition25Hz(40ms) Injection Energy 180/400 MeV Output Energy3GeV Beam Power 0.6/1MW particles 0.50/0.83  ppp Harmonic2 Bunch Number2 Nominal Tune(6.72, 6.35) Transition  t 9.14 S.C. Tune Shift -0.2 Rapid Cycle (25Hz) Ceramics vacuum chamber stranded conductor coil for D,Q magnets High field MA loaded cavity long lived carbon foil for charge exchange injection

50GeV Synchrotron (Main Ring) Imaginary Transition  High Gradient Magnetic Alloy loaded RF cavity Small Loss Slow Extraction Scheme Both Side Fast Extraction for Neutrino and Abort line hands on maintenance scheme for small radiation exposure Circumference1567.5m Injection Energy 3GeV Output Energy30GeV (slow) 40GeV (fast) 50GeV (Phase II) Beam Power 0.75MW (Phase II) Particles 3.3x10 14 ppp Repetition0.3Hz Harmonic9 Bunch Number8 Nominal Tune(22.4, 20.8) Slow extraction Injection Ring Collimators BT Collimators RF abort neutrino C2 C1 M1 M2 M3 D1 D2 D3 E1c E2 E3 Injection dump

400MeV 600MeV Nuclear Transmutation Facility(ADS)  Linac 600MeV,50Hz Extension of Hadron and Neutron Facility MR 50GeV, 750kW Phase II day-1 stag Linac 180MeV, 30mA, 25Hz RCS 3GeV, 0.6MW MR 40GeV, 400kW Next Stage Linac 400MeV, 50mA, 25Hz RCS 3GeV, 1.0MW MR 40GeV, 670kW Phase I

Accelerator Schedule Linac beam commissioning 2006 Dec. ~ RCS beam commissioning 2007 Sep. ~ MR beam commissioning 2008 May ~ slow beam commissioning 2008 Sep. ~ Neutrino commissioning 2009 Apr. ~

Expected Beam Power 400MeV linac

0.17s 1.9s 0.7s 0.87s total 3.64s 50GeV extraction beam power: 750kW (400MeV Linac) beam current: 15  A RCS h=2, 2 bunches MR h=9, 8 bunches 50GeV original pattern (PhaseII) Magnet power supply upgrade Electric power storage system (fly wheel generator, SMES) MR injection

Beam Power Beam Power [kW] = energy [GeV]  beam current[  A] Beam current  number of particles  repetition Lower energy + higher repetition ---> same beam power

High Rep. Beam power 2MW Bdot: 2.3  50GeV original pattern (3.64s repetition) RF voltage: 2.3  present voltage electric storage system is necessary 50GeV 750kW original pattern peak power 50GeV, 750kW original pattern average power 0.54s0.81s1.08s1.35srepetition

Eddy current of dipole chamber Bdot: 2.3  50GeV original pattern  region < 8.1  Heat: 100W/chamber ----> acceptable SUS316L, 2mm thick

sadenv_mid_40gev_fast006 Acceptance 19.5  Emittance 3GeV 81  (54   1.5) 20GeV14.4  30GeV 10  40GeV 7.6  50GeV 6.1  x 0.98mrad Present Fast Extraction Scheme designed to extract 50GeV beam

sadenv_mid_30gev_fast x 1.55mrad 1.24 x 1.67mrad Kicker L=2.43m Large aperture and compact kicker using lumped capacitance proposed Larger acceptance orbit <30GeV (no thin septa) Extracted orbit acceptance 38 

2MW Summary Low energy high rep. scheme can give same high power beam as high energy scheme at the same Bdot. Merit: (1) has low average and peak electric power ----> saves operation cost and power supply cost drastically (2) damage due to accidental one shot beam loss is small. beam power/pulse is small beam size is large ----> heat deposit /volume is small, thermal stress is small (1) Extracted beam emittance is larger -->Extraction orbit with large acceptance has been designed. -->Kicker development with large aperture has started. (2) Sextupole field and heat due to dipole chamber eddy current is acceptable (3) high rep. --> Injected beam power is higher --> Upgrade of the transport and ring collimators may be necessary

For 4MW Beam Power ppp  2-3 in addition to 2MW scheme RCS h=1, MR h=9, 8 batches injection, ppp  2, t inj  2 barrier bucket injection, ppp  2-3, t inj  2-3 Injection time is not negligible for high repetition 50GeV, RCS h=1, MR h=9, 8 batches, Bdot  > ppp  2 space charge tune shift 0.16  2 50GeV, Bdot  1.9 barrier bucket injection, 12 batches --> ppp  3 space charge tune shift GeV, Bdot  2.8 barrier bucket injection, 12 batches --> ppp  3 space charge tune shift 0.16

add an accumulator ring(A. R.) in the MR tunnel RCS -> A. R. -> MR save injection time to MR Lower energy and higher repetition of MR can be possible. For 4MW Beam Power