Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.

Slides:



Advertisements
Similar presentations
RF Specification discussion MICE RF workshop 16 th April 2012.
Advertisements

L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Marc Ross The Normal-Conducting Linear Collider preparation - status and plans.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Next Linear Collider 8-Pack Project D. Atkinson System Review, April 3 The 8-Pack Project at NLCTA An overview of the status and schedule for the project.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
L-band test stations in End Station B Richard Swent.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
SunSatFriThursWedTuesMon January
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Linear Collider For Japan-US HEP Program Committee April 2004 Nobu Toge (Accelerator Lab., KEK)
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Copyright 2007, Toshiba Corporation. Prospects of X-band Klystron Based on Experience of High Power Klystron Development in TETD 31 st /Jan./2013 Toshiba.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
The status of RF components G. Riddone, M. Filippova RF development meeting on
Presentation CERN SPAIN | ITALY | FRANCE | GERMANY | MEXICO | USA | BRAZIL | UAE | QATAR | OMAN | SAUDI ARABIA jema.es.
ILC Power and Cooling VM Workshop
Chris Adolphsen Sergei Nagaitsev
12 GHz High Power RF components requirements for CEA activities
X-band Facilities and High Gradient Tests Stands Around the World
CLIC Drive Beam Klystron Modulators
Linac LLP Outline LINAC Long Lead Procurements
Presentation transcript:

Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002

Status of PPM-3 Status of PPM-3 KEK PPM-3 klystron (JFY2001) Goal:  60% efficiency by installing two 2nd-harmonic cavities.  Revision of water cooling system at the penultimate cavity area. High power testing started in March A feedback system was also installed at the testing set-up to speed up the conditioning process. Observations  The efficiency is slightly lower than PPM-2. 2nd-harmonic cavities suspected.  The Kazakov windows-3 show far better performance than the previous ones. Almost no light emission at 60MW. Very fast conditioning at long pulse.  The improved water cooling system helps to reduce the temperature rise in the penultimate cavity region. Below 30 degree rise at 100Hz operation.

Just after ISG8 in June, PPM-3 achieved Output power65MW Output power65MW Pulse length1.5  s Pulse length1.5  s Efficiency53% Efficiency53% Repetition rate50Hz Repetition rate50Hz However, we suffered from one problem after another since then… Modulator power supply failed in June Pulse transformer broke down in June RF discharge in the load dragged the conditioning out through the fall  BINP load started to degrade and the stable operation became difficult to maintain due to the reflected power from the load.  After exchange to the “dry loads”, a right window broke down, seemingly by a too high voltage at the window due to the reflected power from the loads.  We did monitor the reflected power from the load, but did not feed back it to the input power to TWT.

Status of Other PPMs Remodeled PPM-2 PPM-2 has shown the best performance so far. To explore its performance, PPM-2 was remodeled with  Kazakov-3 windows (= PPM-3)  Improved water cooling system (=PPM-3)  Retuned output cavity (=PPM-3) PPM-2 was shipped to SLAC for further testing and will be installed to NLCTA if available. KEK PPM-4 (JFY2002) Temporarily cease the quest for higher efficiency at 56% and direct efforts to high repetition rate. Combination of the RF design of PPM-2 and the mechanical design of PPM-3.  No 2nd-harmonic cavity  Further improved water cooling system  Kazakov window-3  Stick to the integrated PPM stacking It is schedule to be delivered to KEK in early January 2003.

Other Activities Loads We need new robust loads to test PPM-4 at KEK  Two rectangular loads are expected from SLAC soon (in December or early January?)  Two TE01 loads available at Toshiba (left-over from SLAC 50MW PPM). Two mode-converters (HP) are being built for the new Kazakov TE01- window. We need just tapers to connect them. New TE01-window Just for the case that more robust windows are needed, we are developing a new TE01-window.  Kazakov’s talk High power testing facility in the AR south For testing of structures and other RF components, we are investigating a possibility to upgrade the existing but unused high power testing facility in the AR south to produce pulses with  MW output power  400ns pulse length  25-50Hz rep. rate

Items to be discussed When will SLAC loads arrive at KEK? Their performance A possibility to buy two more in next FY How long and how much should we test PPM-4 at KEK before shipping it to SLAC? 3 months? Till 75MW, 1.6  s, and 50Hz achieved? Precise plan and schedule of PPM-2 and PPM-4 testing at SLAC. February (PPM-2) and June (PPM-4). Check the preparation status for PPM-2 PPM-2 and its all magnets (PPM and electric) were shipped to SLAC already. Main lead shield will be shipped in December. The rest (small stuffs) will follow as well. Check the plan, schedule and preparation status for installation of PPM-2 and 4 to NLCTA. Set up milestones for 2003 and Contingency and back-up plan Marc says that “do not worry” January till the end of April SLAC TE01 window spare KEK TE01 window spare Test At SLAC New date