Hydrograph Modification Management in Contra Costa County Dan Cloak, P.E. Dan Cloak Environmental Consulting.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
Discussion Topics Brief history of structural stormwater management The Low Impact Development (LID) alternative to ponds, ponds, ponds… LID for Hydromodification.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Preparing a Stormwater Control Plan Stormwater C.3 Guidebook 6 th Edition.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
What’s New in the Fifth Edition Dan Cloak Environmental Consulting May 23, 2011.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Leah Johanson, Water Environment Services
Anne Arundel County Department of Public Works. OBJECTIVE MINIMIZE OR ELIMIINATE FLOODING FROM FREQUENT SMALL STORMS Storms of 1- to 2-year frequency.
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
Where are the regulations going? Dan Cloak Environmental Consulting May 23, 2011.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Low Impact Development for Stormwater Treatment and Hydrograph Modification Management in California Dan Cloak, Principal Dan Cloak Environmental Consulting.
Storm Water Management and Erosion/Sediment Control Storm water management reduces quantity, and improves quality, of runoff in the watershed Site based.
Why and How; What’s Working and What Isn’t.  How Low Impact Development can mitigate effects of urban drainage  Applying design criteria for bioretention.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
1 Quantifying Hydromodification Impacts and Developing Mitigation Using a Four Factor Approach Judd Goodman CASQA Conference November.
Western Washington Hydrology Model Version 3
C.3 in MRP 2.0 What to Expect (as of March 17, 2015) Dan Cloak.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
6 th Edition CCCWP Management Committee February 15, 2012.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
HYDROMODIFICATION: AN INTRODUCTION AND OVERVIEW Presented by Jeffrey Haltiner, Ph.D., P.E. Philip Williams & Associates, Ltd. San Francisco, CA May2006.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Balancedgrowth.ohio.gov Ohio Balanced Growth Program Kirby Date, AICP, Cleveland State University Chris Riddle, Ohio Lake Erie Commission.
Background and Overview Stormwater NPDES Compliance For New Developments.
Dan Cloak, P.E. 18 September 2007 to achieve water quality benefits in Contra Costa County Implementing Low Impact Development.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
ODOT 2015 Geo-Environmental Conference
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Discussion of Proposed MS4 Permit Design Standards Language.
Stormwater Treatment and Flow Control Dan Cloak, P.E. Presentation to the San Diego Region Co-permittees Hydromodification Workgroup December 6, 2006 Contra.
MRP Steering Committee Meeting April 24, 2006 New and Redevelopment Performance Standards Sue Ma S.F. Bay Regional Water Quality Control Board.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Low Impact Development for Compliance with NPDES Treatment and Hydrograph Modification Management Requirements in Contra Costa County Tom Dalziel, Assistant.
Countywide Model SUSMP July 17, Topics SUSMP Timeline Goals Approach to Compliance NPDES Permit Requirements NPDES Permit Requirements Model SUSMP.
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
LOW IMPACT DEVELOPMENT APPROACHES
From the Beginning Design Standards and Other Post-Construction Program Elements.
Western Washington Hydrology Model 2005 AWRA Annual Conference Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
Addressing the Sediment Problem in Sonoma Creek Watershed Rebecca Lawton 1, Deanne DiPietro 1, Laurel Collins 2, Arthur Dawson 1 1 Sonoma Ecology Center,
STORMWATER MANAGEMENT
Sizing Stormwater Control Facilities to Address Stream-Bank Erosion Control Anthony M. Dubin, PE Brown and Caldwell Anthony M. Dubin,
Stormwater and GIS Eastern Panhandle WV GIS User Group Meeting September 2, 2015 Jennifer Klages - Sebastian Donner -
Christie Beeman and Jeff Haltiner Philip Williams & Associates Hydrograph Modification: An Introduction and.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Hydromodification Compliance in the Bay Area
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Christie Beeman, Andrew Collison, and Mike Liquori Philip Williams & Associates Options for Flow-Control Compliance.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Sacramento County Stormwater Quality Program
Northern California LID Hydrology and Hydraulics
Alternative Compliance for New Developments
Doug Beyerlein, P.E., Clear Creek Solutions, Inc.
What we have developed is…
Sacramento County Stormwater Quality Program
Presentation transcript:

Hydrograph Modification Management in Contra Costa County Dan Cloak, P.E. Dan Cloak Environmental Consulting

Region 2 Requirements NPDES permittees must propose a plan Manage increases in flow and volume where increases could: ● Increase erosion ● Generate silt pollution ● Impact beneficial uses Post-project runoff may not exceed pre-project rates and durations Option: “Equivalent Limitation” ● Account for expected stream change ● Maintain or improve beneficial uses

Contra Costa HMP Ready to be implemented now Succinct standards, with compliance options Encourage Low Impact Development Integrated Management Practices (LID IMPs) Allow proposals for stream restoration in lieu of flow control where benefits clearly outweigh potential impacts No exemptions for: ● Project size (>1 acre impervious area must comply) ● Infill projects in highly developed watersheds ● Project cost

Four Compliance Options 1.Demonstrate project will not increase directly connected impervious area 2.Implement pre-designed hydrograph modification IMPs 3.Use a continuous simulation model to compare post- to pre-project flows 4.Demonstrate increased flows will not accelerate stream erosion

Option 2: Use IMPs Program has designs, specs and sizing factors for: Flow-through planter In-ground planter Vegetated/grassy swale Bioretention basin Dry well Infiltration trench Infiltration basin

Why Use LID IMPs? Treatment and hydromodification management Integrate treatment facilities into landscaping, easements & setbacks Aesthetically attractive Low maintenance No standing water

Flow-through Planter

Vegetated (“Dry”) Swale

9-acre, mixed use Multi-family Residential Retail nursery Retail Restaurant Clay soils Flat grades Max. use Storm drains Setbacks

Swale “C-2” 6' to 10' width fits into setback Underdrain/ overflow to storm drain below

Area “C-2” Follow roof peaks and grade breaks Area size determined by site layout Use valley gutters instead of catch basins

15 areas; 15 swales

Flow-Through Planter: Flow Peak Control

Flow-Through Planter: Flow Duration Control

What is potential impact of underflow on streams? Scenario 1: Partially built-out watershed ● Only a small portion of watershed produces underflow ● No potential impact Scenario 2: Entire watershed equipped with IMPs ● Avoid routing storm drains directly to streams ● Use landscape buffers around riparian areas Program has proposed further modeling of watershed-scale scenarios

Four Compliance Options 1.Demonstrate project will not increase directly connected impervious area 2.Implement pre-designed hydrograph modification IMPs 3.Use a continuous simulation model to compare post- to pre-project flows 4.Demonstrate increased flows will not accelerate stream erosion

Option 4: No Impact to Streams Categorize development project as posing a high, medium, or low risk of accelerating stream erosion “Low Risk” ● Report showing all channels between project & Bay are hardened, tidal, or aggrading

Option 4: No Impact to Streams “Medium Risk” ● Could be applied to streams where Sensitivity of boundary shear stress to flow is low (e.g. high width-to-depth ratio) Resistance of channel materials is high ● Could be applied to smaller projects in partially built-out watersheds ● Mitigation project plan and supporting analysis ● Support for the mitigation project from regulatory agencies having jurisdiction

Option 4: No Impact to Streams “High Risk” ● Presumed that increases in runoff flows will accelerate bed and bank erosion ● Comprehensive analysis required to determine design objectives for channel restoration ● Comprehensive program of in-stream measures to improve habitat functions while accommodating increaed flows ● Requirements determined case-by-case in consultation with regulatory agencies

Summary: Contra Costa’s Approach Protect urban watersheds from ongoing hydromodification ● Requirements apply to infill projects and projects as small as 1 acre—or less Use IMPs for treatment and flow control Assist applicants to comply ● Provide designs and sizing factors Solve existing stream problems in lieu of flow control where it makes sense to do so Case-by-case approach to large projects

Acknowledgements Tom Dalziel Contra Costa Clean Water Program Contra Costa Clean Water Program C.3 Technical Work Group Jeff Haltiner Philip Williams & Associates Christie Beeman Philip Williams & Associates Steve Anderson Brown & Caldwell Tony Dubin Brown & Caldwell More info, including the final HMP, at: