Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.

Slides:



Advertisements
Similar presentations
SAVANNA CITY - Gauteng’s largest privately initiated development Background information to the Premier.
Advertisements

Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Helen Bowden Nurses Home “Jewel of Granger Bay” PROVINCIAL REGENERATION PROGRAMME INVESTOR CONFERENCE 26 March 2014.
USAID Africa Bureau EIA Procedures for Sub-Projects
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.
November 7, 2013 Open House Manitoba Municipalities Modernization Act RM of Daly & Town of Rivers.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Presented by Christopher Msipu Phiri.  Location ◦ South Central part of Africa ◦ Landlocked Country with eight neighbors  Size ◦ Km2  Population.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
MUS pilot project in Honduras Testing guidelines for planning and implementation of multiple use services.
ADD NAME/TITLE HERE Report on the outcome of Harry Gwala Informal Settlements Constitutional case 02 June 2010.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
DEPARTMENT: RURAL DEVELOPMENT & LAND REFORM LAND AUDIT REPORT PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Rates Policy Review Presentation 2013 CITY OF JOHANNESBURG.
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Rental Housing Response to the Recommendations of the FFC on Rental Housing National Department of Housing 7 August 2009.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
MONDAY 2 DECEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
Moloto Road (R573) Safety Investigations
PRELIMINARY DRAFT not for circulation
AGENDA The current focus on housing Do we need older people’s housing? The role of planning? National Level Local Level Opportunities to influence Planning.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
HOUSING PERFORMANCE REPORT 07/08 (3rd Quarter)
PRELIMINARY DRAFT not for circulation
Architectural Drafting
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Application for Zoning Amendment
PRELIMINARY DRAFT not for circulation
Official Plan and Zoning By-law Amendment Application
PRELIMINARY DRAFT not for circulation
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Motivation for a Managed Land Settlement Programme
Presentation transcript:

Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan for KUWAIT 100

Feasibility and Review of Housing Plan KUWAIT 100 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel; Fax: Kantey & Templer PO Box Beacon Bay, 5205 Tel: IQ Vision 110 Sarel Cillier Street Strand 7140 Tel; EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) NXUBA LOCAL MUNICIPALITY Private Bag X350, Adelaide, 5760 Tel: (046) Fax: (046)

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9Future Plans of Other Sector Departments 2.10Approval by Council 2.11Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Extent of General Plan Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1 Ownership Annexure 2Title Deed Annexure 3Surveyor General diagram

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Kuwait 100 as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of ten Human Settlement Project feasibility reports for Nxuba Municipality. It is designed so that it can be part of a single document that includes the other nine projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner:Nxuba Municipality Property Description: Portion of RE/586, Lingelethu Title Deed Number:T17365/1979 Servitudes: N/A Site Size:8.94 Ha Kuwait 100 is situated in Adelaide within Nxuba municipality, east of the R344 and is currently an informal settlement, see figure According to Census 2011 data, a small number of 191 people reside on the invaded, previously vacant land earmarked as the HSP site. Adelaide is approximately 22.8kms and 37,6km from its nearest neighbours Bedford and Fort Beaufort respectively. The site is in close proximity to the water works, as well as Adelaide Hospital south of the site. It mainly comprises of dwellings of varying quality on vacant land next to the existing Old Lingelethu settlement, see figure Visual Survey. Future residential and public open space expansion has been identified by the 2011 Nxuba SDF to occur north of the settlement as well as on the east and west portions of land, see figure

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 9 Locality Plan Figure 2.1.1

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 10 Aerial Photograph Figure Water works

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd 3 April 2014 page 11 VISUAL SURVEY Figure a. Informal structures in Kuwaitb. Vacant, unserviced landc. Informal structures on unsurveyed plots

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 12

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 13 STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2 A project of 100 subsidies has been proposed for Kuwait. The proposed project’s delivery strategy and housing instrument is project linked housing subsidy into existing informal settlement. The waiting lists are awaited from the Department of Human Settlements. Therefore, the total beneficiaries are unknown until the waiting lists are verified. During the site visit on 23 October 2013, it was observed that the site is unserviced. KUWAIT 100 Population (Nxuba SDF 2011)Not specified Population (2011 Census)191 No. Households (2011 Census)64 Proposed Subsidies (EC DHS)100 Waiting List (Nxuba LM)Awaiting Figure 2.2.1Statistical Background

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land on which Kuwait 100 will be located is Erf 586, Lingelethu (S.G No. 3548/1978), see figure Some beneficiaries reside on this erf with no demarcated plots. The General Plan was approved in The registered owner is Nxuba Municipality stated in Title Deed T17365/1979, see Annexure 2. This erf was identified in the SDF (2011) for a infill housing and public open space, see section 2.8.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 15 Extent of General Plan Figure 2.3.1

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 16 ENGINEERING (Kantey and Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 17 Engineering (Kantey and Templer) Figure Await K&T

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 18 ENVIRONMENT 2.5 The project is an in-situ upgrade with existing plots. The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. The site falls within CBA 2 as per SANBI data (2007) and therefore is subject to BLMC 2 guidelines according to the ECBCP. BLMC 2 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are not recommended for these areas, however this must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project. Cultivated land can be found to the south of the settlement, south of the R63 and Koonap River. Housing development needs to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). Should the development require a buffer less than 32m, a basic assessment will be required for: The expansion of: (i)jetties by more than 50 square metres; (ii)slipways by more than 50 square metres; or (iii)buildings by more than 50 square metres (iv)infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 19 Environment Figure 2.5.1

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 20 GEO-TECH (Kantey and Templer) 2.6 In terms of the geotechnical information available the following is extracted from a report by Outeniqua Geotechnical Services cc, Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 21 Geo-tech(Kantey and Templer) Figure The Site

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 There is one hospital and one clinic located south of the site which is within the 1km buffer area. This means that these health facilities are within walking distance of the site, see figure There are primary schools just outside the 1km walking distance of the site in New Lingelethu. The site is within 2km of the main town of Adelaide where more facilities are found, including the nearest school facilities. When social facilities are measured against the population threshold of the Adelaide, Lingelethu and Bezuidenhoutville area, according to the SDF, the facilities that were needed in 2011 were 1 primary school and 2 police stations. (Nxuba SDF 2011, pg 39) There is not an appropriate level of social facilities within the 1km walking distance from the site for the number of residents in Old Lingelethu. These should be provided between Old Lingelethu and Adelaide CBD. Residents must travel to the nearby Adelaide CBD in order to access higher order health, police and education facilities. Developing the Kuwait 100 project will not in itself require more facilities as the beneficiaries are already existing residents. However, there is a need for better located facilities closer to Old Lingelethu and it is suggested that the proposed primary school, identified in the SDF, be located between Old Lingelethu and Adelaide CBD.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 23 Distribution of Social Facilities Figure 2.7.1

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 The 2011 Nxuba SDF makes the following proposals for Adelaide: Future residential extension is proposed to grow to the west, east and central parts of Adelaide (see figure 2.8.1). The proposed site of the Kuwait 100 project is earmarked for infill housing, business and public open space. The main intersection with the R65 forming part of the site is proposed as a local business node. The majority of the SDF’s residential expansion proposals are to the north, around the Bezuidenhoutville area (1 641 units) and infill housing at Lingelethu to the east over a total area of Ha, which at 25du/Ha contributes to 904 units. The proposed Human Settlement Project is in line with the SDF.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 25 Current Spatial Development Framework Figure (Source: Adelaide SDF, Nxuba Spatial Development Framework, 2011) The Site

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 26 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the IDP Note : Projects may not be in the settlement itself, however if they were taking place within the same ward, they were noted. No budget was reflected in the IDP for some projects.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 27 APPROVAL BY COUNCIL 2.10 Await council resolution

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 28 SUMMARY AND RECOMMENDATIONS SUMMARY The site was inspected on 23/10/2013 and the conclusions below ground-truthed. The ownership of the land on which Kuwait 100 and its environs are located is registered to Nxuba Municipality. A general plan, erf diagram and title deeds will have to be prepared for the new extension. There are adequate engineering services shown on the SDF. Using ECBCP guidelines in determining the BLMCs that apply to the CBA that covers the site, settlements are not recommended for the site. It is recommended that the site be assessed by a qualified Botanist to verify and ground-truth the CBA nature of the site prior to the Human Settlement Project implementation. A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. The rocky ground on which the current informal settlement is located may cause problems for the provision of services. The project comprises of 100 housing subsidy units onto vacant, invaded land and formal plots on abutting residential extensions. The beneficiary list is still to be verified. No new facilities are required to support the proposed Human Settlement Project. The Human Settlement Project is in line with the SDF, as proposed infill housing is indicated on the site RECOMMENDATIONS The project is feasible, pending a technical assessment by a Botanist to verify the CBA nature of the site.

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 29

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 30 ANNEXURE 1: OWNERSHIP PRINTOUT

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 31

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 32 ANNEXURE 2: TITLE DEED

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 33

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 34 ANNEXURE 3: SURVEYOR GENERAL DIAGRAM

KUWAIT 100 FEASIBILITY STUDY CNdV africa (Pty) Ltd1 November 2015 page 35