Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.

Slides:



Advertisements
Similar presentations
Task: Promotion/Demotion To see this in PennWorks...click herehere Task Definition: Promote or demote an employee. Steps – From the Task drop-down list:
Advertisements

P2 – RMS Interface May P2 – RMS Interface P2Local RMS CRMS On demand Or scheduled Nightly.
Status Report #4 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.
Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.
ODOS The Office of the Dean of Students. Projects Interactive Campus Map Global Positioning System - Device for the Visually Impaired Adjustable Table.
BAJA STATUS UPDATE September 27, 2011 FRAME & SUSPENSION Research Phase 100% completed Design Phase 75% completed – Frame Design (CAD) – Suspension Design.
Natasha Benko, Kevin Jacobsen, Marcus LaRose, Scott Timme October 14, 2009 Our design will automatically calibrate your speedometer according to tire size.
Task: Terminate To see this in PennWorks...click herehere Task Definition: Terminate an employee record. Steps – From the Task drop-down list: Select Terminate.
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Status Report #8 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 04/06/2011.
Description: Construction of a device and application to detect the failure of the lighting system. Delfino Amador Melissa Martinez Miguel Ramirez Sergio.
Status Report #3 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/6/2012 Design of an electronic system to track.
Performance Management Reporting: Quarter 4 Guide to Q4’s reporting Overall performance for Q4 Key Service Priorities Other performance indicators Next.
Task: Transfer Home ORG To see this in PennWorks...click herehere Task Definition: Transfer an employee record to another Home organization. Steps – From.
RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS Automatic Monitoring.
STATUS REPORT # 3 RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS.
THE AUTO-REMIND USB FLASH DRIVE March 31, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #6 Hector Silva Gustavo.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #3 February 6 th, 2012 Objective: To create an automated.
MB race T ech mB 1 Antonio DeMendonca Albert Lopez Lourdes Alvarez Antony Acha 19 September, 2011 mB 1 is a bracelet connected to a cellular phone via.
Status Report #1 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect September 17,
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Status Report #07 AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection.
THE AUTO-REMIND USB FLASH DRIVE January 25, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #2 Hector Silva Gustavo.
Status Report 3 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 9/15/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
Status Report 4 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 9/22/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
WCMS Report Web Advisory Committee April Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
ENL1819T Progress Report Confidence in Our Success.
{ Lost Object Locator Status Report #2, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application.
SMART ENVIRONMENTAL CONTROL SYSTEM (S.E.C.S) John Ayers Tanner Ricks Jason Stange Jacqueline Ortiz An intelligent HVAC control system that efficiently.
April 14, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #8 Hector Silva Gustavo Diaz Ernest Tolliver Matt Ford.
Start Typical student project Advanced student project Level of final response.
THE AUTO-REMIND USB FLASH DRIVE January 25, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #2 Hector Silva Gustavo.
Darren Jordan Adam Huck Daniel Ortiz September 22 nd, 2010 Our design is to install an automated fire suppression system in a vehicle and in the act of.
THE AUTO-REMIND USB FLASH DRIVE April 7, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #7 Hector Silva Gustavo.
Status Report # 3 Commhut – Home Security Wire Protection System Team 7 Ronald, Orlando, Robert, Jaime An interfacing module to communicate with previously.
RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS Automatic Monitoring.
THE AUTO-REMIND USB FLASH DRIVE February 15, 2010 “Reminds users they’re leaving their Flash Drive in the USB Port.” Status Report #4 Hector Silva Gustavo.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #4 February 13 th, 2012 Objective: To create an automated.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
Texas e-Grants Status Report, Phase I Find Funding Opportunity Information May 22, 2007.
Senior Design Team Kirby Wigton Kirby Wigton Joseph Haggberg Joseph Haggberg Nate Perkins Nate Perkins Rosemary Peters Rosemary Peters Advisor Advisor.
Status Report #2 Walking Charger By: Carlos Benitez, Meryem Fennich, Srinath Kota, Jacksario Rosario September 15 st 2010 Description: Battery charger.
Chapter 2 Project Management Methodologies. A project life cycle PlanDesignDevelop Integrate (including test) DeployMaintain They can be iterative and.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
Status Report #4 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/13/2012 Design an electronic system to track the.
Group A. Kevin O’Connell  Graduated Manhattan College 2014 Civil Engineering  Recently began working in scheduling  Sports: Jets Mets Knicks Rangers.
{ Lost Object Locator Status Report #3, Josues Gonzalez Russell Pool John Jenkinson Miguel Alvarez Tracking device with phone application.
Status Report #8 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
Status Report 6 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 10/13/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
CMAST I MPROVEMENT P ROJECT Update for the CMAST Advisory TG September 19, 2013.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Status Report #6 March 19 th, 2012 Objective: To create an automated system that will monitor and enforce personal.
Proximity-Triggered Dog Training Collar Status Report #4 Distance detecting behavior correction dog collar 2/13/2012 Team 10: Hamad Aldossary Yagoob Alsarouj.
Status Report #1 Self sustaining living system using methane Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 1/23/2011 Design of an electronic.
Plaistow BOS Meeting 7/24/2017
The Auto-Remind USB Flash Drive
a next generation event engine for princeton
Status Report 7 CAPS Cynthia Reyna David Rodriguez Cynthia Salas
Task: Transfer Home ORG
Description Tab (cont’d)
To see this in PennWorks...click here
The U.S.S.E Status Report #3 February 16th, 2009
Children’s Hospital Update
The U.S.S.E Status Report #1 February 2nd, 2009
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
Presentation transcript:

Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing LCD screen including but not limited to physical damage.

Overall Need: Improve current LCD Design  Excessive failure/breakage rate  Look at current design and research alternatives.  Research parts needed  Enter design phase  Implement and test design  Redesign (if needed) and Finalize

Recent Tasks completed:  Met with engineers at KCI  Obtained materials needed to test durability of existing screens.  Completed and updated Project Schedule

Ongoing/Pending tasks  Began construction of Website  Weekly meetings with engineers at KCI  Isolating issues with screen damage  Testing possible design alterations

Upcoming Tasks  Order alternative parts  Follow up with Engineers at KCI for project advancement  Screen simulation code

Project Schedule

Project Schedule (contd.)