Workforce Development SEA Managed Process 2.1.1 Job Skills & Cross Training Process Presented July, 2010 www.garkenyon.com Phone: 1(203)729-4900 Email:

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Nevada Commission on Tourism Strategic Planning Session January 21, 2015.
How to Document A Business Management System
HIGH LEVEL 4-YEAR CYCLE FOR RE-ACCREDITATION (ACCORDING TO HD RE-ACCREDITATION YEAR) This document is a high-level overview of the 4-year re-accreditation.
October 15, 2012 Jose Chavez Jr, Quality & Technical Services Engineer.
1 Module PLANNING AND ORGANIZING EXTERNAL QUALITY ASSESSMENT.
ISO 9000 Certification ISO 9001 and ISO
Product and Process Measures Drive Continuous Product Quality and Business Improvement Angelo G. Scangas, President Quality Support Group, Inc
Recruiting Metrics for Improved Performance Presented By Tom Darrow September 11, 2008 NC SHRM State Conference Copyright 2008 Talent Connections. All.
SQA Work Procedures.
Release & Deployment ITIL Version 3
How to Write a Successful Application Dial-in Number: Access code: # Go to: Use the JOIN A SESSION button.
Professional Development Programs
SC21 Project Plan Overview. What is SC21? SC21: Is an industry change programme designed to accelerate the competitiveness of the aerospace, defence and.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
GWS SMS INTRODUCTION MSM Manual. 3. MISSION STATEMENT AND CORE VALUES OF THE COMPANY  MISSION  Our Mission is to provide expertise in the fields of.
INTEGRATING MANUFACTURING & SPECIAL PROCESSING KAIZEN PROCESS
Nick Sykes Lean Six Sigma Black Belt 01/21/13. Company Overview  Awarded SEA’s Leadership & Culture, Leadership Excellence, Supply Chain Innovation,
Performance Management Open Information Session for Individual Contributors.
Chart Your Course to Business Success On Target Business Intensive: Session 6 May 1, 2012 Advisors On Target 1.
Roberts Tool Company, Inc Strategic Planning Presented at SEA Webex January 10, 2011.
1 SEA Process Owners Forum CI Management September 13, 2011.
Industrial Engineering Roles In Industry
Performance Management  Performance Management Cycle  Organizational Success  Shared Responsibilities  Setting Goals and Expectations.
1.1.2 Leadership Communication Supplier Excellence Alliance April 8, 2013 Presented by John Cristman Director, Corporate Quality Integrity Aerospace Group.
Leadership and Culture SEA Managed Process Continuous Improvement Process Presented May 24, Phone: 1(203)
Graco Supply & Integrated Services Organizational Performance Review May 9, 2011 Robert Steffner.
Items Required for Process Hand-off
March 12, About MPC Industries  Flat sheet polishing  Formed Parts polishing  Grinding, Sheet & Plate Backed by over 40 years experience and.
Copyright 2005 Talent Connections. All Rights Reserved. Presented By Tom Darrow Recruiting Methods for Improved Performance.
Presented By Tom Darrow October 3, 2001 Recruiting Methods for Improved Performance.
Strategic Planning Process
Background Management Council (MC) was briefed on approach in early Feb 2003 and approved it Agreed that every Service Group (SG) will participate in.
MAP-IT! Review Meeting 5 March Brussels Intermediate results Jordan INNOVA.
CASE STUDY PRESENTATION FORMAT IT CAN BE SHARED WITH ALL. USE THIS FORMAT FOR GIVING CASE STUDY PRESENTATION AT LEAN KAIZEN MELA 2015 Put your Company.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
1  Established in 1964  Located in Escondido, Ca Company Vision: To be the most dependable, diversified and efficient job shop, dedicated to unbeatable.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Jose Chavez Jr, Quality & Technical Services Engineer Hugo Razo Process Owner.
Nick Sykes Greg Gannon Lean CoordinatorProduction Manager 12/05/11.
QUALITY MANAGEMENT STATEMENT
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
March 5, 2012 Continuous Improvement Management SEA Roadmap Process NTS PIPELine: Process Improvement Execution Dan Cannon NTS Corporate Director.
CASE STUDY PRESENTATION FORMAT It can be shared with all. Use this format for giving Case Study presentation at 3 rd Lean Kaizen Mela Gemba Owners 20 th.
Presented by: Kelly Conrad March 21, 2011.
Performance Management Training October , 2015 Grace Gorenflo, MPH, RN Principal Gorenflo Consulting, Inc.
Graco Supply & Integrated Services Strategic Planning January 9th, 2012 Tim Holland, CEO/President Aman Sangha, Business Analyst/CI.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Process Owner Forum November 5, 2012 Workforce Development Workforce Development Process Job Skills & Cross-Training Certification Process
Nick Sykes Lean Coordinator Process Owner: 3.1.1
1 IEEE Computer Society SAB Vitality Report November 2, 2005 By Claire Lohr SAB Vitality Chair.
Posted on: April 27, 2009 Closed on: May 1, 2009, 5pm Reports to: Training Manager Employment Status: Exempt Job Grade: B1 Submit application to: Alabang.
Nick Sykes Lean Six Sigma Black Belt 10/01/12. Company Overview  Awarded SEA’s Leadership & Culture, Leadership Excellence, Supply Chain Innovation,
Paramjit Sharma building a balanced scorecard. Paramjit Sharma Imagine an excellent scorecard built by a staff executive or middle management without.
Performance Management  Shared Responsibility  Performance Management Cycle  Gonzaga’s Performance Review Process 2 Session Agenda.
1.1.4 Continuous Improvement Process Owner: Bill Christensen.
State IT Agency Briefing on Annual Report 2014/15 to Parliamentary Portfolio Committee on Telecommunications and Postal Services 16 October 2015.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Chapter 5 Planning. Setting goals and deciding how to achieve them. Coping with uncertainty by formulating future courses of action to achieve specified.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
Proposal and Company Information Document CONTENT About Indagatio Research Our Research Offerings Why Indagatio Research Our Work Process Project Snapshot.
Graco Supply & Integrated Services Continuous Improvement Management Process June 4, 2012 Tim Holland, CEO/President Aman Sangha, Business Systems.
The Performance and Staff Development Program
Enterprise / Production System Interface Expand Internally/Externally
Implementation Strategy July 2002
Enterprise Improvement LEAN Initiative Presentation
Strategic Plan Implementation July 18, 2018
Presentation transcript:

Workforce Development SEA Managed Process Job Skills & Cross Training Process Presented July, Phone: 1(203)

Gar-Kenyon Technologies is a leader in the design and manufacture of hydraulic and pneumatic aerospace components..

Gar-Kenyon has been designing and manufacturing Aerospace and Defense products for over 50 years. Gar-Kenyon’s origins trace back to 1950 when Kenyon Instrument merged with Gar Precision’s Valve Division. Military programs initially dominated Gar-Kenyon’s revenues, including the A-6, A-10, F-4, F-14, F-15, F-16, F-18, C-130, C-5 and P-3 aircraft. During the 1980’s Gar-Kenyon became more closely affiliated with General Aviation aircraft manufacturers. In the 1990’s Gar-Kenyon partnered in the development of components used in various Regional Jet aircraft.

Gar-Kenyon’s products are designed to meet specific customer requirements. We specialize in hydraulic, pneumatic and mechanical devices. Including: Bleed Valves Check Valves Flow Fuses Manifolds Master Brake Cylinders Parking & Emergency Brakes Relief Valves Restrictors Shimmy Dampers Shuttle Valves Toe Brakes Water Fill Valves Flow Gauges

Well Known in Aerospace Industry Gar-Kenyon has produced products for over 100 different aircraft. We supply products to many of the major aircraft and aircraft systems manufacturers.

Job Skills & Cross Training Description Job Skills & Cross-Training Certification Process - How is job skills training and certification accomplished? How does your organization ensure that processes selected are linked to key priorities for improvement? How is cross-training accomplished? How is the team of master trainers maintained and expanded? How is the training and cross- training program reviewed?

Preparation Obtain: Annual Workforce Development Plan created in Job Skills Objectives Training Records Management Quarterly Report. Process Maturity Listing. Strategic Plan Champions Process Owners Master Trainers Collect Data Compile data for review Training Objectives Process Analysis Process Owner feedback Feedback Collect Feedback. Improve Process. Reviews Review training, cross- training, and certification progress and feedback. Review Master Trainer status. Compare training objectives to training activities. Review course outlines Review process metrics and process owner feedback. Review Strategic Plan goals Monthly Review Meeting of Goals, Targets, Action Plans, Champion Reports and training updates Job Skills & Cross Training Process Quarterly Employee Meetings to review company performance, goal status, training progress and obtain employee feedback. Training Plans

Agenda for Job Skills & Cross Training Meeting Objectives of Meeting Review status of current training and certification progress Review Strategic Plan Define objectives Analyze processes Identify SME's Obtain Process Owner feedback Review Master Trainer team status Participants: Process owners and Process Champions. Preparation: Meeting Owner to send out agenda to participants 5 days prior to meeting. Request Process Owners and Champions have current progress updates on training activities. Obtain Process Owners Reports from Monthly Meetings.

GAR-KENYON STRATEGIC PLAN FY2010 Vision Statement We will increase revenue 50% by 2012 using lean processes company wide to become the preferred source for custom engineered fluid power aerospace components Eliminate Escapes Champion: Peter E. Metrics: Escapes, DPMO Actions 1. Establish Metric Definitions & Methodology (Peter by 1/15/10)‏ 2. Implement reporting (Peter by January Meeting)‏ 3. Analyze root cause and corrective actions for 3Q & 4Q escapes (Peter by 2/28/10)‏ 4. Plan for Standard Work and Training (Peter by 3/31/10)‏ Monthly Management Review on 2 nd Monday of Each Month Chair: Steve F. Attendee's: Steve F, Tom T, Jon F, Jane P, Grace L, Peter E and others by invitation Agenda to be distributed 5 business days prior to meeting. Agenda to include: Goal Reports by each Goal Champion including metrics, analysis & root cause, status against action plans. Performance Improvement Plan review. Customer Scorecard review. Communications Plan and Training Plan. Kaizen reports and newspapers as required. STRATEGIC GOALS On Time Delivery Champion: Jon F. Metrics: Cust. OTD Chart Actions 1. Establish Metric Methodology (Peter by 12/31/09)‏ 2. Implement Reporting (Peter by 1/31/10)‏ 3. Analyze 10 latest each month using Root Cause Analysis, Trends, Actions (Jon for each monthly meeting)‏ 4. Level Load Assy & Test Kaizen (Jon by 3/31/10)‏ 5. Overhaul & Repair Kaizen (Tom by 5/31/10)‏ 6. Develop labor reporting plan (Jane by 2/28/10)‏ New Business Development Champion: Steve F. Metrics: RFQ's / Proposals Actions 1. Establish Metric Methodology (Steve by 1/31/10)‏ 2. Implement Metric Reporting (Steve by February Meeting)‏ 3. Develop Strategic Marketing Plan (Steve by 2/28/10)‏ 4. Kaizen PMA Process (Steve by 7/31/10)‏ S.E.A.Stage 1 Certification Champion: Peter E. Metrics: S.E.A Metrics Actions 1. Self Assessment (Current State)‏ (Peter by 1/31/10)‏ 2. Establish Action Plans (Peter by 3/31/10)‏ 3. Employee Site Visits (Steve by 3/31/10)‏ 4. Submit New Change Management Plan to S.E.A. For Comment (Peter by 1/15/10)‏

1st Piece Inspection Inspector will review documents and then inspect part in accordance with the applicable drawings, specifications and other requirements. If Inspection discovers nonconformities, the inspector will review findings with programmer / setup person. A new 1 st piece will be submitted and inspected. This process will continue until part is accepted for production.

Employee Review Agenda Strategic Objectives Performance Scorecard SEA Activity Continuous Improvement Activity Training Activities Quality Employee Feedback Closing Comments

THE END