ESGARD NETWORK ACTIVITIES L. Rossi AT Division - CERN Workshop on Advanced Accelerator Magnets Archamps, F, 17-18 March 2003.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
The Large Hadron Collider By Kathleen McKay. What is the LHC? The most powerful particle accelerator in the world. A synchrotron (ring-shaped particle.
CERN F. Ruggiero & W. Scandale CARE Steering Committee, Paris, 11/04/2006 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero.
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
Peter Paul 12/16/06e-A Collider concept1 Brief History of the e-A Collider Concept Peter Paul BNL/SBU.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Concept of a hybrid (normal and superconducting) bending magnet based on iron magnetization for km lepton / hadron colliders Attilio Milanese, Lucio.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
Future Accelerators at the High Energy Frontier
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
FCC kick-off meeting a summary for magnets L. Bottura
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
General Considerations for the Upgrade of the LHC Insertion Magnets
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
ECLOUD04, Panel Discussion, April 2004F. Zimmermann Panel Discussion future machines: higher intensity shorter bunch spacings and/or higher charge per.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
FCC-ee Interaction Region design
Thomas Schoerner-Sadenius DESY Hamburg, Germany
Instrumentation for Accelerators Technologies for the HL-LHC
The European Strategy for Particle Physics
CLIC-ILC BDS & MDI work.
Future Collider Projects at CERN
Why are particle accelerators so inefficient?
nuSTORM and the Physics Beyond Colliders workshop
HEHIHB - WP1 Accelerator Magnet Technology
Measurements, ideas, curiosities
1st HiLumi LHC / LARP Collaboration Meeting 2011 Nov 17th
High Energy High Intensity Hadron Beams
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

ESGARD NETWORK ACTIVITIES L. Rossi AT Division - CERN Workshop on Advanced Accelerator Magnets Archamps, F, March 2003

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking2 HEHIHB - 1 Networking Activity: N4 Topic: Coordination of studies towards a future High Energy High Intensity Hadron Beams after the LHC –first remarks: all studies devoted to field below 10 T must be addressed in a contest of an injector chain for a HE accelerator –second remark: LHC means present LHC (may be some studies relevant to reach the ult. perf.) Coordinator : Oliver Bruning (CERN, AB div) 5 years program

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking3 HEHIHB - 2 Establishing a road map towards a future high energy high intensity hadron collider –20-25 years from first conception of the LHC to colliding beams! –Even for luminosity upgrade 10 years are needed –design process is only possible if the technical limits are well understood. It is too early.

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking4 HEHIHB -3 General scope Potential future hadron collider after the LHC with centre of mass collisions above 14 TeV Peak luminosity values above those of the LHC ultimate (goal : ??) Experimental studies in existing machines to establish a roadmap for future R&D and give directions Generate R&D program to submit as JRP Favour international collaboration, including small laboratories and Universities Collect but also disseminate information Improve existing infrastructure

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking5 HEHIHB -4 Advantage for EU  Integrating laboratories on a European wide scale will provide a better exposure to the frontiers of high energy accelerator research and a more efficient use of the exiting infrastructures.  Integrating laboratories on a European wide scale will provide improved techniques and competence for the operation of existing accelerator facilities.  Integrating laboratories on a European wide scale provides a similar framework as it is currently set up by the US laboratories  Integrating laboratories on a European wide scale will stimulate the exchange of knowledge and expertise between research laboratories and industry and thus provide a stimulating effect on the European industry.  Identification of the most efficient solution for future high energy high intensity proton beams.

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking6 HEHIHB - 5 Management structure Co-ordinator: O. Bruning (CERN) ? Deputy co-ordinator: ? Work-package co-ordinators: –L. Rossi (CERN) –H. Reich (GSI) – H. Schmickler (CERN) – F. Willeke (DESY) –E. Tsesmelis (CERN)

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking7 HEHIHB - 6 Work package Advancemetns in accelerator magnet technologies. Abbreviation AMT ; Chaired by Lucio Rossi (CERN); Deputy Luca Bottura (CERN) Advancements in Vacuum Technology. Abbreviation AVT; Chaired by Hartmut Reich (GSI); Deputy Noel Hilleret (CERN) Novel Methods for Accelerator Beam Instrumentation. Abbreviation ABT; Chaired by Hermann Schmickler (CERN); Deputy ??? Accelerator Physics and Synchrotron Design. Abbreviation APD; Chaired by Ferdinand Willeke (DESY); Deputy Francesco Ruggiero (CERN) Machine Experimental Interface. Abbreviation MEI; Chaired by Emmanuel Tsesmelis (CERN); Deputy ???

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking8 AMT1 – Stability and Quench Limit of LHC-ultimate and LHC-upgrade Studies of stability and quench limits for super conducting magnets. For given cleaning efficiency the LHC should operate at the quench limit of the super conducting magnets. A thorough understanding of these quench limits will be important for pushing LHC performance to its present ultimate limit and to assess the possibility of a further upgrade. Theoretical studies should be complemented by experimental tests, as far as possible. A comparison of the various approach to quench and stability studies and a list of the various codes available in different laboratories will help to understand where are the area already covered and the areas where an effort of research is to be addressed. Eventually, by favoring the integration of various quench codes.

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking9 AMT2 – Magnets for an SPS upgrade The following activities investigate the possibility to increase the LHC injection energy by introducing a fast cycling super conducting booster ring in the SPS tunnel (3 to 5 tesla ? 10 s cycle ?) Minimum 2xSPS a. Magnet specifications for low cost fast cycling super conducting dipole magnets that fit into the SPS tunnel together with the existing SPS machine (minimum required cross section, dimensions, peak field and field quality). b. Specification of the minimum required cryogenics for such a super conducting booster ring c. Analysis of the required transfer line upgrades

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking10 AMT3 - Magnets for a booster ring in the LHC tunnel The following activities investigate the possibility to increase the LHC injection energy by introducing a slow cycling compact, inexpensive, low field super conducting ring in the LHC tunnel. This LFR serves as booster of the present SPS to increase of a factor 3 to 4 the injection in a SuperLHC. a. Specification of a magnet design for a low cost ring based on fast cycling super conducting dipole magnets that fit into the LHC tunnel together with an high field ring (minimum required cross section, dimensions, peak field and field quality) b. Specification of the minimum required cryogenics for such a super conducting booster ring, by best use of possible 20 K cryogenic surplus (MgB2 ??)

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking11 AMT4 – High Field Magnet Design To go beyond the present LHC magnets with high performance conductors (A15 or eventually others) and special magnet design are required to reach the technical goal. So main area of development and of theory and data comparison are: a. cable design with high current and current density, large temperature margin, acceptable magnetization b. coil geometry and stress analysis of high field magnets in different configurations; comparison among different computing codes. c. optimization of the coil aperture for coil construction and global system costs

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking12 AMT5 - Optimisation of the overall cost of the magnet system for a high energy hadron collider The various parameters can be cost-optimized according to two hypothesis i) fixed ring (existing LEP-LHC tunnel) ii) new tunnel of “free” radius and the following points are to weighted: a. required cryogenics b. required tunnel diameter and dimensions c. required service infrastructure My goal : 5 k€/d.Tm TOTAL

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking13 AMT6 - Handling of synchrotron radiation in a superconducting environment The increased load from radiation may become the actual limiting factor for future hadron colliders making use of magnets at very low temperatures. Put together the world-wide experience and try to compare various solutions and new designs is essential to face this complex factor. a. special magnet designs b. masks and absorber integration in the magnet design c. possible cooling options

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking14 N4-AMT : deliverables The proceedings of each workshop, published in electronic form with the system of the peer review. In particular, the last one should give solid indication for the possibility of a TeV/beam proton collider in the LHC tunnel. The student/stagist is to work on the topic of the workshop of the year, to collect documentation and compare different hypothesis. He/She will also act as scientific secretary of the workshop. An annual report (the last year will be also the final report) indicating the progress of the integration activity among various laboratories and asddressing each single work package and a global assessment of the progress toward HE- HI hadron collider beyond LHC present energy. The report must reflect the line given at the annual general meeting. An initial ORACLE data base site, accessible via Web, with some instruments for basic analysis. The idea is create a system to point to collection of data already present in single laboratory adding a suffcient description to render data usable with perennity.

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking15 Link persons

WAAM - Archamps, 18 March 03 L. ROSSI - Esgard Networking16 Activities and people 1 stagist per year (5 months) 1 fellow for the data base 2 years Target 450 k€ for 5 years, 53 people involved