HALL B TUNNEL NAVIGATION Allen Ellis 5-October-2012 version 2 I have measured the Hall B truck ramp (tunnel). The smallest area is the entrance from the.

Slides:



Advertisements
Similar presentations
Construction Explanation.
Advertisements

Code Analysis:Accessibility Colleen MacEachern & Stephanie Novak.
Steel Outlet Boxes Crouse-Hinds Training Module. Outline z Applications z Types of Steel Boxes y Options z Uni-Mount TM Cover z Pre-Fabricated Boxes z.
Hoist Lifting it Right.
Assembled Vehicle Inspection (AVI) Process
Light Weight Portable Cranes
Architectural Drawing
Service Technician Training
Search and Rescue Trailer Bungay Fire Brigade 2013.
© Easy Guides Australia National Edition START PRESENTATION QUIT PRESENTATION.
STATESMAN Campers, Raising the standards. STATESMAN XP- 3.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
Squidget Pop Top (PT) Tiny Travel Trailer
Johanna Mikitka AE-390 October 13, 2004
Vehicle Lifting and Hoisting
STATESMAN Campers, Raising the standards. STATESMAN XP- 1.
STATESMAN Campers, Raising the standards. STATESMAN XP- 2.
Key Terms, and Concepts Mr. Paules.  Sole Plates – Lowest horizontal strip on wall and partition framing.  Walls are laid out on two plates  Top and.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Elevations.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
Design Considerations for Telecommunications Pathways and Spaces
Exploring CAD - Architectural Electrical Design. OVERVIEW TWO COMPONENTS –POWER –LIGHTS Power to House –Meter –Distribution Panel Box.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Investigator Casualty Guide Identifying & Assessing Damage “Looking Deeper” March 2013.
Rqmt. # Functional Decomposition Function Detailed FunctionEngr. Requirement Unit of Measure Marginal Value Ideal Value Status S1Provide Safe ExperienceWheelchair.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Wall Framing Grimsby Secondary School Technology Dept.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Design Progress Allen Ellis 18-September
Vehicle Lifting and Hoisting 18 Introduction to Automotive Service James Halderman Darrell Deeter © 2013 Pearson Higher Education, Inc. Pearson Prentice.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
HOW TO BUILD YOUR OWN BED 2008 Heavy Duty Truck Rally HDT Rally. October Hutchinson, KS.
Pouch Stacker & Boxer DR Mark Smith October 8,
Chapter 2 Special Considerations in Design Special Populations The American with Disabilities Act of 1990 (ADA) Landmark Civil Rights case that represents.
Sketch Model Review Small scale agriculture Tree Trolley.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
To discover the Pythagorean Theorem by exploring right triangles and the squares built on each side To apply the Pythagorean Theorem to real-world problems.
Mayor’s Office on Disability City and County of San Francisco Discussion of Common Design and Construction Errors.
Competency: Draw wall sections and details
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
The proposed trailer will have the capability to be pulled by a GSA pick-up and LMTV. The new trailer will also be wired with the proper type of electrical.
Warehouse Safety Is This You????.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Accessory Range In Car Entertainment Comfort Safety & Security Exterior –Styling –Utility Interior –Styling –Utility.
Kitakami Side AHCAL Assembly or anywhere in any detector.
WALL TYPE IDENTIFICATION
Competency: Draw wall sections and details
VEHICLE LIFTING AND HOISTING
Dump Transport from Dump Hall to XSE (updated Version)
// DEALER LOGO HERE INTERIOR SOLUTIONS FOR HOSPITAL BED STORAGE
MAINTENEANCE AND REPAIR OF STARTING SYSTEMS
Integration and IR Hall
SIDE MIRRORS WHAT YOU SHOULD SEE
Competency: Draw wall sections and details
ActivRAC® Layout Considerations
Wood Frame Construction
Epuni Primary School LED Lighting Trial 2016 Final Report
Wall and Ceiling Construction
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
Green arrows show main exit routes for people leading to congestion
Rail & Truck Handling, Loading, and Securement Standards for Shipping the NEW Jeep Compass 2017 February 21, 2017, Version 5 This form outlines the mandatory.
Presentation transcript:

HALL B TUNNEL NAVIGATION Allen Ellis 5-October-2012 version 2 I have measured the Hall B truck ramp (tunnel). The smallest area is the entrance from the tunnel to the hall. The HTCC shown herein has released drawings for parts defining its size. The list of requirements for the Transport Cart are: 1.4 lockable swivel wheels 2.Ground clearance for a future exterior flood gate thresh hold and transitions at slope 3.45 degree fit up for HTCC 4.Mounting pads located for load bearing areas of HTCC 5.A trailer hitch to control descent Truck ramp is rough and should have plates laid down for the cart wheels. Cart to support HTCC at 7,330 lbs. HTCC contains a sensitive mirror and must be moved without jolts or impacts.

ELECTRIC BOXES RUN FULL LENGTH OF TUNNEL P/A LOUD SPEAKERS (IN BACKGROUND)

P/A LOUD SPEAKER APPROXIMATELY 8” CLEARANCE AT CONICAL FACE

P/A LOUD SPEAKER (NO INTERFERENCE) CEILING IS 9 INCHES HIGER THAN INTERIOR DOOR HEADER (LIGHT FIXTURE MAY BE CLOSE)

3.36” AT SOLENOID NOTCH 1.6 “AT CART BUMPER 1.6” AT CART BUMPER 3.36” AT DNSTREAM RING PLATE 1.12” AT HOIST BLOCK 6” or less AT CONICAL FACE Current design does not allow for removal of Hoist Blocks without compromising containment vessel. HTCC shown with front Mount Channels removed. Current design accommodates this without compromising containment vessel. Only studs protrude in a clear space.

CART BUMPER (cart design not complete) CART BUMPER (cart design not complete)

STATUS : HTCC fits through door CONCLUSION