Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.

Slides:



Advertisements
Similar presentations
Liquid Nitrogen and Cryogenics Training Program
Advertisements

Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS INTRODUCTION TO RELIEF
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
EBIS Accelerator Readiness Review Hazards and Controls for Pressure Systems May 4-7,
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Installation of the T600 at Fermilab CSN2, September 22,
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Overview of Main Linac Cryomodule (MLC)
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Numerical modelling of cold helium safety discharges from the cryogenic distribution line Jonathan Persson MSc. Engineering Physics AD and ICS Retreat.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
UITF ODH Assessment UITF Safety Review May 10, 2016.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Overview of the ESS Linac Cryogenic Distribution System
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Preliminary Hazard Analysis of the ESS Cryomodules Nuno Elias Cryogenics Engineer Engineering an Integration Support Division Safety review of Spokes and.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
2 K Coldbox Safety and ESH
ILC Cryogenic Systems Draft EDR Plan
ESS elliptical cryomodule
Helium collector CFD analysis
WP11: CDS-SL CDR Overview
Cryogenic behavior of the magnet
Parker domnick hunter. Safety of Electrical and
Presentation transcript:

Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears

Safety Requirements and Regulations Responsibility for safety oversight is carried out by safety committees within CLASSE and by Cornell’s Department of Environmental Health and Safety (EH&S). 10/3/20122Safety Requirements & Regulations James Sears

Safety Requirements and Regulations CLASSE has over four decades of experience designing, building and collaborating on SRF and Cryogenic systems 10/3/20123Safety Requirements & Regulations James Sears

Cryostat Safety Issues Personal safety & Equipment protection 10/3/20124Safety Requirements & Regulations James Sears

Cryostat safety issues Oxygen deficiency hazard Over pressurization 10/3/20125Safety Requirements & Regulations James Sears

Oxygen deficiency hazards No Liquid Nitrogen used for cooling Potential oxygen deficiency hazards will be mitigated by excluding liquid nitrogen from the tunnel and moving the tunnel air at 400 feet per minute so that in the event helium is released, it does not pose a hazard to personnel spaces in the tunnel. In addition, only a limited amount of helium will be present in the tunnel. Even if both helium return lines and the ventilation of the tunnel failed, loss of all the helium contained in one of the linacs would only drop the oxygen availability by a maximum of 40 percent. While this does not satisfy the OSHA standard for 8 hour occupancy, it will not cause loss of consciousness thus allowing any personnel in the tunnel to leave safely. 1 10/3/2012 Safety Requirements & Regulations James Sears 6

Oxygen deficiency hazards Liquid helium will be stored in the 640 meters of superconducting linac sections mounted in the proposed looped tunnel. There will be a total of 64 crymodules, each approximately ten meters in length and arranged end to end and divided between two cryogenically independent linacs. Each cryomodule will have an inventory of 168 liters (44 gallons) of liquid helium for a total of 5,400 liters (1,420 gallons) of liquid per linac. 1 10/3/2012 Safety Requirements & Regulations James Sears 7

Over pressurization The inventory of helium which might be evaporated has been minimized by compartmentalizing the helium inventory and designing each of the helium vessels surrounding the accelerating devices to be just large enough to transport the heat generated in the accelerators and no larger. The pipes that will bring the helium to and from the cryomodules have been sized so that the pressure generated by a sudden evaporation of helium will not overpressure them dangerously. Backup relief valves will also be installed. 1 10/3/2012 Safety Requirements & Regulations James Sears 8

Over Pressurization 10/3/2012 Safety Requirements & Regulations James Sears 9 a.Over pressurization of Helium supply and return lines will be dealt with at the Cryo plant. There are no burst inside the MLC b.Helium leaks into MLC. Pressure relief install on Standard 5.3”ID auxiliary port. c.Accidental loss of insulation or cavity vacuum

Over Pressurization CLASSE is not a DOE lab and not subject to same stringent pressure vessel code rules but we are concerned about these requirements we are trying to design a system that will meet these codes. The MLC Module is based on the DESY XFEL design which was designed to meet European PED as well as ASME code. DESY XFEL model has approximately same helium inventory in one of vacuum section as one of Cornell's MLC modules, both are ~300 meters long. DESY conducted a series of experimental test of fault condition during cryogenic operations 2 so lets look at will look at their test for a) Helium supply leak b) Accidental loss of insulation or cavity vacuum 10/3/2012 Safety Requirements & Regulations James Sears 10

XFEL test For a realistic worst case scenario DN100 (4inch) flanges at the vacuum vessel and the beam tube connection of the module were chosen for venting. For these tests the venting air flow was monitored by an Air Flow Measurement Device with a 3 inch orifice for the first 4 test and through the 4 inch opening for the 5 th test A fast acting vacuum valve was used for triggered venting. Only minor damages occurred after venting the insulating vacuum of the cryomodule with no measurable consequences for the performance. Their conclusion was the robust cryomodule design could be validated and “Hence, the consequences for the layout of the cryogenic systems, which were derived from the simulations, can be considered as safe”. 10/3/2012 Safety Requirements & Regulations James Sears 11

10/3/201212Safety Requirements & Regulations James Sears Supply and return Pressure are same for MLC and XFEL

10/3/201213Safety Requirements & Regulations James Sears

10/3/201214Safety Requirements & Regulations James Sears

10/3/201215Safety Requirements & Regulations James Sears

CONCLUSIONS 1)Oxygen deficiency hazard should not be a problem 2)Over pressurization of Helium Supply and return lines should be handle outside of MLC 3)Helium leaks into Vacuum vessel can be handed by appropriately sized Cryostat pressure relief valve 4)From XFEL test over pressurization of Vacuum vessel from air leaks to vacuum vessel or beam line should not cause a problem. 10/3/2012 Safety Requirements & Regulations James Sears 16

references 1) ERL DEIS appendix P2-117 / ) EXPERIMENTAL TESTS OF FAULT CONDITIONS DURING THE CRYOGENIC OPERATION OF A XFEL PROTOTYPE CRYOMODULE Boeckmann T., et : Deutsches Elektronen Synchrotron, Hamburg, Germany 10/3/201217Safety Requirements & Regulations James Sears