Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date.

Slides:



Advertisements
Similar presentations
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Acquisition and.
Advertisements

Space Bank & Freeze the Footprint May 22, 2013 Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
Ivan Graff Office of Acquisition and Project Management Oak Ridge, TN March 27, 2014 Applying the Memorandum on Data Related to Operations and Maintenance.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Office of Management, Office of Engineering and Construction Management DATA ELEMENT UPDATE Gary R. Horn Facilities Engineer, LEED AP Office of Engineering.
U.S. Department of Veterans Affairs Veterans Health Administration Supportive Services for Veteran Families (SSVF) Program SSVF Grantee Uniform Monitoring.
Cleveland School District Gerald Finley, Property Manager Friday, July 27, 2012.
FIMS/Real Estate Workshop June 16, 2011 The IFI Crosscut and You How FIMS Data Supports the Budget Process Cindy Hunt, PE, LEED AP, CCE, CFM Office of.
D&D: DEFINITION AND DISCUSSION Ivan Graff Office of Acquisition and Project Management March 25, 2014.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Auditing Systems Development, Acquisition and Maintenance
Cohort 8 Grant Closeout Procedures HEIDI SCHULTZ DEBRA APPLETON.
Asset Inventory & Financial Reconciliation Project Kick-off Meeting May 2, 2005 Boulder City, NV.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Chapter 12: Sales Comparison Approach. The Sales Comparison Approach is Useful When:  An active market exists  Comparable sale are highly similar to.
WEBINAR Presentation for Fleet Coordinators October 3, 2006.
Facilities Information Management System Data Validation Update for FY15 U.S. Department of Energy Argonne National Laboratory Annual FIMS Comprehensive.
FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual.
ANNUAL FIMS COMPREHENSIVE TRAINING Y- 12 NEW HOPE CENTER OAK RIDGE, TN MARCH 25, 2014 GAYLE SMITH Accomplishing FRPP Reporting and Improving Data Quality.
SEASONS OF THE ASSET: FIMS AND THE LIFECYCLE Ivan Graff, P. E. Office of Asset Management May 7, 2015.
Office of Acquisition and Property Management Proposed Changes to Attachment G FY 2011 – FY 2015 Five Year Plan.
National Laboratory Operations Board Infrastructure Assessment Subgroup Real Property Background Carmelo Melendez.
Facilities Information Management System (FIMS) Data Validation Outbrief [Program] [Site] date.
Arkansas Association of Federal Coordinators September 23, 2011.
Office of Management Office of Engineering and Construction Management 6/2/2009 Beyond the President’s Management Agenda & FRPC Update Gary R. Horn Facilities.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
Laboratory Operations Board Enhancements Mark Gordy & Gayle Smith March 25, 2014 Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN.
2014 FIMS Annual Training Oak Ridge, TN March , 2014 Presented by: Michael Kohut, DOE Headquarters (GCI)
Physical Inventory Why? 1 Barbara A. Finnegan, CPPM CF.
DOE ASSET MANAGEMENT PLAN
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Proposed FIMS Data Elements for Removal FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy Energy Enterprise Solutions.
1 FIMS Lease Management and More 2009 FIMS/Real Estate Workshop Memphis, TN June 3, 2009 Prepared by: Gayle Smith, Energy Enterprise Solutions.
FRPP Data Issues FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy & Gayle Smith Energy Enterprise Solutions.
Office of Management Office of Engineering and Construction Management 6/2/2008 President’s Management Agenda & FRPC Update Gary R. Horn Facilities Engineer.
FIMS Standard Report Enhancements FIMS/Real Estate Workshop Palm Springs, CA June 2 – 6, 2008 Mike Kohut Gayle Smith FIMS Technical Support Presented.
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Asset Management.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
Mark Gordy Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
1 FIMS Data Validations And Lessons Learned Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure Team FIMS.
ANNUAL FIMS COMPREHENSIVE TRAINING ARGONNE NATIONAL LABORATORY MAY 6, 2015 GAYLE SMITH Federal Real Property Profile Reporting.
Project Management Basics
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure.
1 DOE Excess Elimination an Dispositions Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
FIMS Workshop June 2-6, 2008 Jolie Macier. A subcommittee of individuals comprised of Field Office users, including DOE contractor personnel, that recommend.
Replacement Plant Value (RPV) Dollars in Billions.
Lease Acquisition FIMS / Real Estate Workshop Tom Geronikos, Senior Realty Officer, OECM Office of Management June 5, 2008.
Mark Gordy, PMP Energy Enterprise Solutions, LLC 2013 Property Management Workshop May 22, 2013.
R ICHLAND O PERATIONS O FFICE Hanford Site 2008 FIMS/Real Estate Workshop.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Mark Gordy, Headquarters (EES) Facilities Information Management System Data Quality and.
Mark Gordy Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Freeze the Footprint Update March 25, 2014 Presented for Monja Vadnais Facilities & Infrastructure Division (MA-652) Office of Acquisition and Project.
1 Chicago Office. 2 FACILITIES INFORMATION MANAGEMENT SYSTEM (FIMS) & REAL ESTATE WORKSHOP FIMS POPULATION QUERY DEMONSTRATION June 2 – 6, 2008 Palm Springs,
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Status of FIMS at Los Alamos National Laboratory.
OMB Status 09/30/04 Monday, November 15, 2004 OMB Progress 09/30/04 Vicki Novak Tom Luedtke Gwen SykesPat DunningtonSteve Isakowitz Best in Government!
May 7, 2015FIMS / Real Estate Training 2015 FIMS / Real Estate Training FY 2015.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Gayle Smith, Headquarters (EES) Facilities Information Management System Upcoming FIMS Enhancements.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
1 of 32 Performance Measures and the State of Our Facilities Eric Haukdal MA-50 Office of Asset Management.
FIMS Data Validation Update for FY16 FIMS Annual Comprehensive Training May 10 – 12, 2016 Presented by: Gayle Smith.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
How to conduct Effective Stage-1 Audit
Federal Real Property Asset Management Initiative
Capital Assets Through the Eyes of an Auditor
Presentation transcript:

Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date

2 Agenda Introductions Objective Measure of Success Validation Process FIMS Data Elements and Performance Measures Reviewed Schedule Rating Charts Deliverables Issues/Questions

3 Validation Team –Name, Organization Introductions

4 Gage the robustness of the FIMS data –Validate that asset data is being identified and captured correctly in FIMS –Confirm a 90% confidence level of accuracy of the asset data –Generate recommendations for FIMS data improvement Macro-Level –Federal Real Property Council (FRPC) data requirements –The Department’s financial reports Micro-Level –Transfer validation technique to sites –Support Site Facility Improvement Programs –Enhance TYSP development Objective

5 We will be successful if we –Review/validate a statistically random set of FIMS owned building/trailer/OSF assets –Review/validate 100% of all DOE leases –Review/validate no more than 25 land assets –Review/validate no more than 25 disposed assets –Generate either agreement (or documented disagreement) why a specific element in a FIMS record is accurate or inaccurate –Walkthrough a set of the random buildings/trailers/OSF and examine condition and utilization –Understand how FIMS data is being maintained and managed –Document other notable facts and data –Develop recommendations to correct any identified deficiencies Measure of Success

6 Validation Process Paper review of a random sample of owned records, DOE lease records and land records –FRPC data elements in FIMS –Other critical FIMS data elements –Review of source documents comparing source document values with FIMS values Other review procedures –Perform limited building/trailer/OSF walkthroughs –Interview / discussions with FIMS administrators –For sites that have bridges, verify bridge safety inspections meet required inspection frequencies

7 FIMS Data Elements and Performance Measures Reviewed For DOE Owned Assets Ownership Usage Code Property Type Status Size –Gross Sqft (buildings and trailers) –Primary Qty (OSF) Asset % Utilized (buildings and trailers) Replacement Plant Value Deferred Maintenance Operating Cost (site level) and Annual Actual Maintenance (asset level) Mission Dependency Historic Designation Using Organization Main Location Location City/State/County/Zip Code Location Congressional District Excess Indicator Estimated Disposition Year Total No of Federal Employees (buildings and trailers) Total No of Contractor Employees (buildings and trailers) Total No of Other Personnel (buildings and trailers) Total No of Occupants (buildings and trailers) Outgrant Indicator Initial Acquisition Cost Total Adjustment Cost Inspection Date GREEN – Performance Measures

8 FIMS Data Elements and Performance Measures Reviewed For DOE Owned Assets Roads – Public Access Miles Roads – Public Access Lane Miles Hours of Operation Per Week Sustainability (buildings/trailers) Year Built Year Acquired Meters Determination Date for DOE Disposal GSA Notification Submitted GSA Notification Accepted

9 FIMS Data Elements and Performance Measures Reviewed For DOE Leased/GSA Assets Ownership Usage Code Property Type Status Size –Rentable Sqft (buildings and trailers) –Primary Qty (OSF) Asset % Utilized (buildings and trailers) Replacement Plant Value Annual Actual Maintenance Mission Dependency Using Organization Main Location Location City/State/County/Zip Code Location Congressional District Estimated Disposition Year* Total No of Federal Employees (buildings and trailers) Total No of Contractor Employees (buildings and trailers) Total No of Other Personnel (buildings and trailers) Total No of Occupants (buildings and trailers) Outgrant Indicator* Inspection Date* Hours of Operation Per Week* Meters* Expiration Date Annual Rent Lease Authority* Year Built* GREEN – Performance Measures* Validated for DOE Leased Only

10 FIMS Data Elements and Performance Measures Reviewed For Land Assets GREEN – Performance Measures Ownership Usage Code Property Type Status Size –Acreage Mission Dependency Historic Designation (owned only) Using Organization Main Location Location City/State/County/Zip Code Location Congressional District Excess Indicator Estimated Disposition Year Outgrant Indicator Expiration Date (leases only) Annual Rent (leases only) Lease Authority (leases only) Year Acquired

11 FIMS Data Elements and Performance Measures Reviewed For Disposed Assets Disposition Date Disposition Method Net Proceeds

12 Schedule Tuesday (replace with appropriate day) –Inbrief –Extract data from FMIS to be validated –Desktop validation for DOE owned, DOE leased, Land assets, and disposed assets –Review bridge safety inspection records, if applicable –Arrange walkthroughs Wednesday (replace with appropriate day) –Complete desktop validation –Perform walkthroughs –Perform existing asset check –Verify dispositions –Finalize validation forms and Scorecard –Outbrief A third day may be needed for larger sites

13 Data Element Rating System A variance is a difference of 10% or more for numeric data or any difference for non-numeric data. Red, yellow and green ratings are assigned to each data element based on the frequency of material variance in the random sample: –RED >10% frequency of material variance –YELLOW >5% frequency of material variance but no more than 10% frequency of material variance –GREEN – 5% or less frequency of material variance

14 Rating of Status An overall Status rating of RED i s received if: –One or more of the performance measures result in a red status –Or, two or more of the other data elements are red Historic designation, property type, status, etc. A rating of YELLOW is received if: –Any performance measure is yellow –Or, any one data element is red A status rating of GREEN is received if: –All performance measures are green –And no red data elements Performance Measures: RPV, Deferred Maintenance, Asset % Utilized, Operating Cost (site level) and Annual Actual Maintenance

15 Rating of Progress RED – indication that red status will not improve or yellow status will decline –Lack of attention and urgency –Corrective action plan not being met YELLOW – indication that limited, positive efforts are being taken that may improve the data –Insufficient attention being given –Corrective action plan in place but progress is slipping GREEN – results-oriented plan in place with goals and necessary resources –Clear level of attention and demonstrated sense of urgency –Frequency of material variance is going down –Typically, a site that is green in status by default is green in progress

16 Deliverables One Scorecard report of key findings / recommendations for DOE owned buildings/trailers/OSF’s One Scorecard report of key findings / recommendations for DOE leased and GSA assets (if applicable) One Scorecard report of key findings / recommendations for Land leased assets (if applicable) One Scorecard report of key findings / recommendations for DOE dispositions between FY12 and FY14 (if applicable) Discussion of next steps

Issues / Questions? Inbrief