Sprint 101 Review / Sprint 102 Planning February 25, 2013.

Slides:



Advertisements
Similar presentations
STORY TITLE 1 Lotus Domino IBM JCR Included Content Stores IBM FileNet* IBM CM* Other* Integration & Coexistence Connectors enable direct access from user’s.
Advertisements

An Overview. BizLink BizLink is a Social Networking platform for business. It allows colleagues to come together, ask questions, share resources, form.
Enhancement Request Process Improvements Update
CONNECT 4.0 Enhancing Health Information Exchange for Interoperability Success February 12, 2013.
First part: Objectives (15 minutes) Second part: Work groups (20 minutes) Third part: Proposal of work groups (10 minutes) REPORT OF WORK METHODOLOGY.
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
Query Health Business Working Group Kick-Off September 8, 2011.
VA Pain Coach (VPC) Mobile Applications (Apps) Phase Two (MAP2)
CONNECT 4.0 Technical Deep Dive February 19, 2013.
Sprint 114 Review / Sprint 115 Planning August 26th, 2013.
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
Software Development and Release Management By James Lawrence Software Development Manager.
Sprint 99 Review / Sprint 100 Planning January 28, 2013.
Global Customer Partnership Council Forum | 2008 | November 18 1IBM - GCPC MeetingIBM - GCPC Meeting IBM Lotus® Sametime® Meeting Server Deployment and.
Automate Blue Button Initiative Push Workgroup Meeting January 7, 2013.
Summary Report Project Name: OpenExchange Brief Project Description: OpenExchange platform provides standards based core infrastructure to exchange patient.
CONNECT Roadmap Updated version after June 27 th, 2013 Requirements and Prioritization Meeting 1.
Federal Health Architecture How to Prepare for an HIE Connectathon Adeola Odunlami, Senior Solutions Architect Health and Civilian Solutions Division 1.
Automate Blue Button Initiative Push Workgroup Meeting December 17, 2012.
Platform Upgrades As A Service Raj Nagarajan, Robert Enyedi.
Internet testing prior to the Connectathon Welcome!! Please must your line as you enter. We will have Q&A at the end.
CONNECT: Install Webinar for Code-A-Thon September 7 th, 2010.
VA Pain Coach (VPC) Mobile Applications (Apps) Phase Two (MAP2) Sprint 1 Demo/Review Report April 22, 2015.
Sprint 104 Review / Sprint 105 Planning April 8, 2013.
© Copyright 2011, Alembic Foundation. All Rights Reserved. Aurion: Health Information Exchange Technology Today Alembic Foundation OSCON 2011 July 27,
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
A DΙgital Library Infrastructure on Grid EΝabled Technology ETICS Usage in DILIGENT Pedro Andrade
CONNECT Roadmap Draft version as of February 4 th,
Sprint 103 Review / Sprint 104 Planning March 25, 2013.
By Rick Freeman THE HEALTHCARE INNOVATION ECOSYSTEM HiMSS 2015 & Development Sandboxes Update President & Founder iSalus Consulting June 19, 2015.
Proposal for the new group web infrastructure SFT Group meeting 3/7/2009 Yves Perrin.
Sprint 115 Review / Sprint 116 Planning September 9th, 2013.
0 Connectathon 2009 Registration Bob Yencha Webinar | August 28, 2008 enabling healthcare interoperability.
Sprint 158 Review / Sprint 159 Planning May 18 th – June 1 st 2015.
Electrical and Computer Engineering Klaus Kristo Clem Leung Adam Frieden Chris Davidson Faculty: Professor Ramgopal Mettu Project: iPlanAhead Final Project.
NMI End-to-End Diagnostic Advisory Group BoF Fall 2003 Internet2 Member Meeting.
Sprint 110 Review / Sprint 111 Planning July 1 st, 2013.
With a hint of HP Quality Center Agile development and functional testing: friend or foe? Tom Vercauteren, June 26th, 2009.
Sprint 102 Review / Sprint 103 Planning March 11, 2013.
Sprint 106 Review / Sprint 107 Planning May 06, 2013.
Sprint 108 Review / Sprint 109 Planning June 3 rd, 2013.
Visual Studio Online Visual Studio.NET Work BuildTest Deploy Insights Code Visual Studio Online.
Sprint 169 Review / Sprint 170 Planning Oct 19 th – Nov 2 nd 2015 – s169.
Jericho CSCI 7818 September 5, 2001 Carissa Mills.
Sprint 116 Review / Sprint 117 Planning September 23th, 2013.
Sprint 105 Review / Sprint 106 Planning April 22, 2013.
XIP™/AVT Project Plans 2012 A report to the caBIG® In-Vivo Imaging Workspace Lawrence Tarbox, Ph.D.. December 2011.
Sprint 107 Review / Sprint 108 Planning May 20, 2013.
Perfecto Mobile Automation
Sprint 170 Review / Sprint 171 Planning Nov 2 nd – Nov 16 th 2015 – s170.
Personal Training Assistant – Sprint#1 Group Gamma.
CONNECT CCB Meeting May 16, Balancing current + future needs CONNECT needs to support the current 2012 production and operational needs of the Federal.
Sprint 174 Review / Sprint 175 Planning Dec 28 th – Jan 11 th 2016 – s174.
Sprint 113 Review / Sprint 114 Planning August 12th, 2013.
Sprint 175 Review / Sprint 176 Planning Jan 11 th – Jan 25 th 2016 – s175.
Mobile Testing Overview. Agenda Mobile application quality poses a unique challenge Mobile changes the ALM cycle – Interoperability is unique to mobile.
Sprint 173 Review / Sprint 174 Planning Dec 14 th – Dec 28 th 2015 – s173.
TSSG Case Study: Using Free & Open Source Tools to Manage Software Quality EECS811: Software/IT Project Management Agile Integration Management Case Study.
ASUG SAP Adoption Influence Council Overview: The focus will be on how to increase awareness, adoption and implementation of SAP enhancements that are.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Globus online Delivering a scalable service Steve Tuecke Computation Institute University of Chicago and Argonne National Laboratory.
SUPPORT THE WARFIGHTER MPE Reference Architecture Development Kick-off Meeting Deputy Director Architecture & Interoperability Office of the DoD CIO Thomas.
Sprint 177 Review / Sprint 178 Planning Feb 8 th – Feb 22 nd 2016 – s177.
Release 4.7 Review Sep 8th Sprint Resource Pages For past sprint, visit: NHINProgress/Sprint+191+Progress+Summary.
Joonas Sirén, Technology Architect, Emerging Technologies Accenture
SCEC Drupal Website Development Overview and Status
Quality Control in the dCache team.
Leigh Grundhoefer Indiana University
Simplified Development Toolkit
Presentation transcript:

Sprint 101 Review / Sprint 102 Planning February 25, 2013

Sprint Resource Pages For this sprint, visit: ogress/Sprint ogress/Sprint+101 For next sprint, visit: ogress/Sprint ogress/Sprint+102 For information on the CONNECT 4.0 release, visit: CT40/CONNECT CT40/CONNECT+4.0 2

Sprint Community Contributions Open forum for community members to share o Their work of the last two weeks o Their needs from CONNECT o Ideas and suggestions Community contributions o CMS - CONNECT 4.0 Alpha 1 / WebLogic WebLogic FIPS Installation Instructions o UPMC - CONNECT 4.0 Alpha 1 / WebSphere o ONC VLER Support Beta IV&V Progress 3

Sprint 101 Summary - Cumulative Flow 4

Sprint 101 Summary - Burndown Chart 5

Sprint 101 Summary – Sprint Stats Points committed = 35 Points remaining (unclosed) at end of sprint = 5 Points completed in sprint (velocity) = 6

Sprint Themes & Tasks Themes: CONNECT 4.0 Implementation Support HIMSS ’13 Interoperability Showcase Preparation Direct Connect-A-Thon CONNECT 4.1 –CI and Build optimizations –Corelib optimization –Component technology upgrades 7

Sprint What We are Showing Today CONNECT 4 Implementation Support CONNECT 4.0 Implementation Support –Forums + Community Support CONN Performance Testing - additional testbed information CONN Contributing Code documentation page does not render CONN Complete WebLogic Performance TestingCONN-135Complete WebLogic Performance Testing CONN Test Summary Report CONN test Direct functionality on WLCONN-142test Direct functionality on WL CONN test Direct functionality on WSCONN-143test Direct functionality on WS –Webinars Business Overview (CONN-11 - As a CONNECT adopter, I want a presentation/webinar on the 4.0 release from a business perspective so that I understand the business value of the features in this release.)CONN-11 - As a CONNECT adopter, I want a presentation/webinar on the 4.0 release from a business perspective so that I understand the business value of the features in this release. Technical Deep-Dive (CONN-12 - As a CONNECT user, I want a presentation/webinar on the 4.0 release from a technical perspective so that I understand how to implement the features in this release. )CONN-12As a CONNECT user, I want a presentation/webinar on the 4.0 release from a technical perspective so that I understand how to implement the features in this release. 8

Sprint What We are Showing Today HIMSS ’13 Interoperability Showcase Preparation HIMSS ’13 Interoperability Showcase Preparation –CONN-53 - As an Exchange interoperability showcase participant. I go to a CONNECT web app, enter in my endpoints, synch up my cert, and enter in the basic demographic data about MY patients, so I can demonstrate my use of Exchange technology.CONN-53As an Exchange interoperability showcase participant. I go to a CONNECT web app, enter in my endpoints, synch up my cert, and enter in the basic demographic data about MY patients, so I can demonstrate my use of Exchange technology. –CONN-54 - I'm an Exchange interoperability showcase participant, I want to go to a CONNECT web app, enter in my endpoints, synch up my cert, and look up the basic demographic data from other participants, so I can exchange with them.CONN-54I'm an Exchange interoperability showcase participant, I want to go to a CONNECT web app, enter in my endpoints, synch up my cert, and look up the basic demographic data from other participants, so I can exchange with them. –CONN As an Exchange interoperability showcase participant. I need an UDDI to store Exchange addresses.CONN-136As an Exchange interoperability showcase participant. I need an UDDI to store Exchange addresses. 9

Sprint What We are Showing Today Direct Connect-A-Thon Direct Connect-A-Thon –CONN-16 - As a CONNECT developer, I want to participate in the Direct Virtual Connect-A-Thon so that I can test the Direct feature with other Direct instances and understand scalable trust, trust bundlesCONN-16As a CONNECT developer, I want to participate in the Direct Virtual Connect-A-Thon so that I can test the Direct feature with other Direct instances and understand scalable trust, trust bundles 10

Sprint What We are Showing Today CONNECT 4.1 CONNECT 4.1 –CONN-63 - As a CONNECT developer, I would like to see the default build take less than 5 minutesCONN-63As a CONNECT developer, I would like to see the default build take less than 5 minutes –CONN CONNECTCoreLib: No Findbugs ProblemsCONN-130CONNECTCoreLib: No Findbugs Problems –CONN As a CONNECT developer, I can build core libraries and services independently from each otherCONN-126As a CONNECT developer, I can build core libraries and services independently from each other –CONN As a CONNECT developer, I run wsdl2java generation as few times as possible during normal CICONN As a CONNECT developer, I run wsdl2java generation as few times as possible during normal CI –CONN As a CONNECT developer, I would like to have a profile that would disable the SOAPUI tests.CONN As a CONNECT developer, I would like to have a profile that would disable the SOAPUI tests. –CONN CONNECT deploy using ant failsCONN CONNECT deploy using ant fails –CONN As a CONNECT developer, I would like the interoperability dashboard collector program updated to provide test diagnostic information.CONN As a CONNECT developer, I would like the interoperability dashboard collector program updated to provide test diagnostic information. –CONN As a CONNECT tester, I want the regression test ready to run at regular intervals in the CI environmentCONN-137As a CONNECT tester, I want the regression test ready to run at regular intervals in the CI environment –CONN-44 - As a CONNECT adopter, I want CONNECT to use Apache CXF 2.7.3, inorder to fix some security vulnerabilities found in CONN-44As a CONNECT adopter, I want CONNECT to use Apache CXF 2.7.3, inorder to fix some security vulnerabilities found in –CONN As a CONNECT Developer, I want to Increase Cobertura coverage for Patient Correlation and Doc repository packages by at least 20% in line, method, and branch statistics so that code quality is improvedCONN-133As a CONNECT Developer, I want to Increase Cobertura coverage for Patient Correlation and Doc repository packages by at least 20% in line, method, and branch statistics so that code quality is improved 11

Sprint Proposed Themes HIMSS ’13 Interoperability Showcase Preparation & Attendance CONNECT 4.1 –CI and Build optimizations –Corelib optimization –Additional component technology upgrades CONNECT 4.0 Community Support (Forums, etc.) Multi-Spec DQ Investigation & Analysis ( CONN-46, CONN-15, CONN-215 ) CONN-46 CONN-15 CONN-215 Product Backlog ?selectedProjectId=

CONNECT 4.0 Community Announcements CONNECT Awareness –Open sprint review and planning meetings  Next sprint meeting will be Mar 11 th –CONNECT 4.0 Blogs and Forum posts upcoming –CONNECT 4.0 user group meeting being planned for Spring 2013 –HIMSS 2013 Mar. 3 rd - 7 th 13

Questions and Discussion 14