44095: IT for Management Review & Part 2 Requirements By:Ian Perry Room: C41C Tel: 01723 35 7287

Slides:



Advertisements
Similar presentations
BA 301 Operations Management Spring 2003 Inventory Management Chapter 12.
Advertisements

Business Planning using Spreasheets-2 1 BP-2: Good Spreadsheet Practice  There is always the temptation to rush in and start entering data.  However.
Inventory Modeling Concepts
Tutorial 10: Performing What-If Analyses
Chapter 3 Economic Order Quantity. Defining the economic order quantity.
Prepared by Hazem Abdel-Al 1 Inventory Planning, Control & Valuation.
12 Inventory Management.
Chapter 9 Inventory management 库存管理. AIMS OF THE CHAPTER UNDERSTAND why organizations hold stocks ANALYSE the costs of holding stock CALCULATE economic.
MANAGEMENT OF OPERATIONS
5.6 Production Planning The last one!!. The cost of STOCKS Stocks are materials and goods required to allow the production and supply of products to the.
Computer Studies Systems Development. Systems investigation Systems analysis Systems design Systems implementation Systems testing Systems evaluation.
And Learning TEAL Consulting Limited a a Meeting Customer Demand in Challenging Times July 2010.
44221: Information Systems Lecture 5 (Week 6) Review & Ass 1 Requirements By Ian Perry
Process Modelling Using Data Flow Diagrams - Building and Levelling Them; Process Modelling Using Function Decomposition CSE Information Systems.
Nonlinear Pricing Models
INVENTORY MANAGEMENT IN EXCEL The purpose of inventory management is to Control the inventory operations and to ensure that proper record of all items.
Slide 1.1 Boddy et al., Managing Information Systems, 3 rd Edition, © Pearson Education Limited 2009 MIS – Boddy et al. Ch1. Information systems and organisations.
Costs & Break-Even GCSE Business Studies tutor2u™
Prepaired by: Hashem Al-Sarsak Supervised by: Dr.Sanaa Alsayegh.
Lecture Roger Sutton CO357 Computing for Business and Accounting 7: Spreadsheet Documentation 1.
Unit 3 – Problem Solving Vale Market Research is a large market research company who provides market research solutions to high profile blue chip companies.
44220: Database Design & Implementation Logical Data Modelling Ian Perry Room: C48 Tel Ext.: 7287
Chapter 12 Inventory Models
44221: Information Systems Introduction to Module By:Ian Perry Room: C41C Tel:
44095: IT for Management Introduction to Spreadsheets (Basic/Complex Formulae & Worksheets) By:Ian Perry Room: C48 Tel:
Week 5: Business Processes and Process Modeling MIS 2101: Management Information Systems.
44221: Information Systems Lecture 8 (Week 10) Spreadsheet Automation By Ian Perry
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Table of Contents CD Chapter 18 (Inventory Management with Known Demand) A Case Study—The.
MOS - Spreadsheets CTE – IT Performance Task Spring, 2014.
44221: Information Systems Worksheets & Named Ranges By:Ian Perry Room: C41C Tel:
Administrative Software Chapter 7 Teaching and Learning with Technology.
44222: Information Systems Development Operational & Information Systems Ian Perry Room:C41C Extension:7287
A GENERIC PROCESS FOR REQUIREMENTS ENGINEERING Chapter 2 1 These slides are prepared by Enas Naffar to be used in Software requirements course - Philadelphia.
44095: IT for Management Introduction to Module By:Ian Perry Room: C41C Tel:
Systems Analysis & Design
1 Performing Spreadsheet What-If Analysis Applications of Spreadsheets.
CHOOSING a Unit 3 Assignment Spreadsheet Design TASK 1 Read through the introductions to the 3 different assignments. Choose which one you will do. Write.
44221: Information Systems Intro to Spreadsheets By:Ian Perry Room: C48 Tel:
44221: Information Systems Lecture 3 (Week 4) Systems Concepts 2 By Ian Perry
Hierarchy of Production Decisions
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 1 Project Statement of Work Outline.
Systems Life Cycle. Know the elements of the system that are created Understand the need for thorough testing Be able to describe the different tests.
44222: Information Systems Development Documenting a Solution Ian Perry Room:C41C Extension:7287
44221: Information Systems Systems Concepts 2 By:Ian Perry Room: C48 Tel:
University of Sunderland ISIC 1 Data Flow Diagrams - Part 2 Hierarchical DFDs.
44221: Information Systems Lecture 6 (Week 8) Introduction to Spreadsheets By Ian Perry
44221: Information Systems Lecture 1 (Week 2) Introduction to Module By Ian Perry
© All Rights Reserved Module Information and the Organisation Well Designed Interfaces.
Tutor2u ™ GCSE Business Studies Revision Presentations 2004 Purchasing & Stock Control.
44095: IT for Management Systems Concepts 2 By:Ian Perry Room: C48 Tel:
44221: Information Systems Lecture 3 (Week 4) Systems Control Concepts By Ian Perry
44221: Information Systems Lecture 2 (Week 3) Information Systems Concepts By Ian Perry
Excel 2007 Part (3) Dr. Susan Al Naqshbandi
44221: Information Systems Review & Assignment 1 By:Ian Perry Room: C41C Tel:
Databases 101 © Dolinski What you will learn How relational databases work What are the components that make up a database How to create each component.
Software AS Module Heathcote Ch. 22. Importance of Information  Information technology is fundamental to the success of any business  The information.
Multiplication of Common Fractions © Math As A Second Language All Rights Reserved next #6 Taking the Fear out of Math 1 3 ×1 3 Applying.
Stock Control. Why hold stock? Simple manufacturing organisation No need to hold stock All goods manufactured on demand However Need to hold stock so.
FACTORS AFFECTING THE EFFICIENCY OF DATA PROCESSING SYSTEMS.
44222: Information Systems Development Documenting a Solution Ian Perry Room:C49 Extension:7287
44220: Database Design & Implementation Introduction to Module Ian Perry Room: C41C Ext.: 7287
F C3. Financial systems, procedures & IT application C4. The relationship between accounting & other business functions Designed to give you knowledge.
CIS 115 All Exercises Devry University (Devry) FOR MORE CLASSES VISIT CIS 115 All Exercises Devry University.
CH-7-Inventory Management Assist Prof Banu OZKESER December, 2015.
44220: Database Design & Implementation Review & Assignment 2 Ian Perry Room: C41C Tel Ext.: 7287
National 4/5 Business Management
Block 5 Section 2 Part I How is performance measured within organizations? Prepared by Hanady Ali Osman.
BASIC INFORMATION ABOUT DATABASE MANAGEMENT SOFTWARE
LO2 - Be Able to Design IT Systems to Meet Business Needs
Memory management Explain how memory is managed in a typical modern computer system (virtual memory, paging and segmentation should be described.
Presentation transcript:

44095: IT for Management Review & Part 2 Requirements By:Ian Perry Room: C41C Tel:

Ian PerrySlide : IT for Management: Review & Part 2 Requirements IT4M: Learning Outcomes? Understand the distinction between data, information & knowledge. Relate theoretical information technology models to business organisations, in order to understand business needs. Assess an organisation, to identify the role of IT-based support systems in a given business context. Use software tools to produce a working example of an IT-based support system which addresses specific business needs.

Ian PerrySlide : IT for Management: Review & Part 2 Requirements IT4M: Assessment Method? A single assignment, in two-parts, based upon the ‘EZPC’ Case Study scenario. Part 1 a)Analyse the current information system, as presented by the Case Study, using appropriate systems diagrams. (30 Marks) b)Where, and how, might Information Technology (IT) be used to improve the efficiency and/or effectiveness of Case Study organisation’s information system? (20 Marks) Part 2 Build a software tool that can help improve a specific aspect of the information system for the Case Study organisation. (50 Marks)

Ian PerrySlide : IT for Management: Review & Part 2 Requirements EZPC – Case Study EZPC assemble PC Systems for sale to customers such as PC World, Dixons, Currys, etc. Each PC System is ‘made-to-order’ (as a result of a request from a specific customer), based on a limited set of ‘Standard’ PC Configurations. The computer components (i.e. Processors, Hard Disks, Memory, etc.), from which the PC systems are assembled, are purchased from a number of suppliers. EZPC also sells computer components directly to the same Customers. The components, either waiting to be assembled into PC Systems, and/or to be passed on directly to EZPC’s customers, are stored at one of three different warehouse locations, i.e.: Leeds, Newcastle, & Reading The Leeds Warehouse acts as the Head Office for EZPC; all dealings with suppliers are controlled from the Head Office. -- SNIP --

Ian PerrySlide : IT for Management: Review & Part 2 Requirements EZPC – Continued At each Warehouse -- SNIP –- A fourth group of staff control the warehouse operations; ordering & receiving components from suppliers, -- SNIP –- How things work? -- SNIP –- If a ‘work order’ can not be completed, due to a lack of components, then the Warehouse must raise a ‘purchase order’ (via the Head Office) with one of EZPC’s Suppliers. -- SNIP --

Ian PerrySlide : IT for Management: Review & Part 2 Requirements EZPC – Problems? -- SNIP –- Each of the Warehouses is quite small, and can only hold a small stock of computer components and assembled PCs, so ‘work orders’ often become ‘purchase orders’ (once again a manual calculation). Raising a ‘purchase order’ with one of EZPC Suppliers can result in a delay of up to 10 days for the delivery of the computer components. Often, even when Warehouse is almost full of computer components, a ‘work order’ cannot be completed; as these are the wrong components with which to satisfy a specific customer ‘request’.

Ian PerrySlide : IT for Management: Review & Part 2 Requirements Stella, the Manager in charge of purchasing stock for EZPC, often ‘gets it wrong’, i.e.: buys too many of those components for which the demand is low. does not buy enough of those components for which the demand is high. At a recent business seminar, someone told Stella that all she needs to do is to work out the Economic Order Quantity (EOQ) for every component that EZPC stocks. This person kindly provided Stella with a ‘simple’ formula (see next slide) for working out EOQ, but she is having trouble using it. Case Study Update - 1

Ian PerrySlide : IT for Management: Review & Part 2 Requirements Economic Order Quantity?  The kindly person also said that it is not always prudent to order the exact EOQ that is indicated by the above formula; and suggested that it might also be wise to create an EOQ Optimisation Table & Chart (see next 2 slides), for a range of possible re-order amounts.  A ‘simple’ EOQ Formula

Ian PerrySlide : IT for Management: Review & Part 2 Requirements EOQ Optimisation Table You need to build a table of calculations, for a variable range of Re-order Amounts (R); e.g. 5, 10, 15, 20, etc. Then calculate the following for each value of R: Annual Holding Cost (AHC) = HC x (R/2) Annual Ordering Cost (AOC) = OC x (D/R) Total Annual Cost (TAC) = AHC + AOC And present them in a table like this:

Ian PerrySlide : IT for Management: Review & Part 2 Requirements EOQ Optimisation Chart Producing a line chart of the data from the EOQ Optimisation Table; should result in something like this: NB. The Point at which the AHC and AOC curves cross is the EOQ, however; the TAC curve is usually relatively flat either side of this point, which shows how much more, or less, can actually be re-ordered without having a major effect on the TAC.

Ian PerrySlide : IT for Management: Review & Part 2 Requirements What you have to do? The spreadsheet you develop should be as easy to use as possible, so: use multiple worksheets; in order to separate input, lookup & output areas. use named ranges & simple macros; in order to automate the process of moving between worksheets, and printing specific sections of worksheets. make your data entry worksheet as ‘bullet- proof’ as possible; as mistakes in data entry are the biggest cause of error with any IT-based ‘solution’.

Ian PerrySlide : IT for Management: Review & Part 2 Requirements The Assignment & Deadline? A single assignment, in two-parts, based upon the ‘EZPC’ Case Study. Part 1 Analyse the current information system, as presented by the Case Study, using appropriate systems diagrams. (30 Marks) Where, and how, might Information Technology (IT) be used to improve the efficiency and/or effectiveness of Case Study organisation’s information system? (20 Marks) Part 2 Build a software tool that can help improve a specific aspect of the information system for the Case Study organisation. (50 Marks) Assignment Deadline Monday, the 12 th of May, 2008.