ACS Current Status M.Sirianni TIPS Feb 15, 2007. Agenda : ACS Side-2 failure SBC reactivation ACS programs conversion.

Slides:



Advertisements
Similar presentations
SECTION 11 LEVEL B SUIT OUT. SECTION 12 AIR MONITORING.
Advertisements

1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
737 PNEUMATICS MENU PRINCIPAL.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
1 ACS Status Update STScI TIPS Meeting 19-October-2006 Ken Sembach.
GLAST LAT Instrument 1 Summary of Progress  Completed TVAC with no additional reboots  Ran refresh rate test showing that the refresh rate was not an.
ELECTRICAL SAFETY ISSUES DISCUSSION WITH SHUTTLE SMALL PAYLOADS PROJECTS (a.k.a. HITCHHIKER)
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
Product Introduction.
Freedom Combi Inverter
Fan Switch and Limit Switch Information. FAN Switch.
LIVE INTERACTIVE YOUR DESKTOP January 28, 2010 NASA/NSTA Web Seminar Series How Telescopes Have Changed Our View of the Universe Hubble’s Universe:
1 TIPS 2011 May Persistence in the WFC3 IR detector Knox S. Long.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
1 ACS Side-2 Performance Update STScI TIPS Meeting 20-July-2006 Ken Sembach.
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
TIPS presentation 19 July 2007Charles Proffitt COS-STIS TeamPage 1 STIS FUV MAMA Dark Current Charles Proffitt COS-STIS Team.
Hubble: Back in Business and Better Than Ever Dr. Frank Summers Space Telescope Science Institute September 9, 2009.
Printed by ACS 2 Gyro Mode Data Analysis Cheryl Pavlovsky, Marco Sirianni, Ken Sembach, ACS Instrument Team and the 2 Gyro Mode Team.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
CCDs in space: the effects of radiation on Hubble’s Advanced Camera for Surveys (ACS) Max Mutchler, David Golimowski (Space Telescope Science Institute),
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
Temperature and Bias Variation and Measurement in the NICMOS Detectors EddieBergeron, STScI.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
An Overview of the Recent HST Safings An Overview of the Recent HST Safings Ken Sembach TIPS Presentation September 20, 2007.
Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program –Geometric distortion program completed –ACS to FGS alignment.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
NICMOS Status 2014 Rodger Thompson - Steward Observatory, University of Arizona Calibration Workshop August 11, 2014 STScI.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
CODIF Status Lynn Kistler, Chris Mouikis Space Science Center UNH July 6-8, 2005 Paris, France.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
ACS STATUS Linda Smith (thanks to David Golimowski for providing the slides)
1 ACS Side-1 Anomaly Review Board Conclusions STScI TIPS Meeting 21-September-2006 Ken Sembach Subset of conclusions as summarized in the final ACS Side-1.
Torsten Böker TIPS May 2, 2002 NICMOS post-cooldown detector performance 1) SMOV status 2) Dark current 3) Quantum efficiency 4) “First light”, focus and.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
The WFPC2 WF4 Anomaly John Biretta 15 Dec Overview Discovery of the Anomaly Historical Evolution Imaging Impacts GO Science Impacts Image Repair.
STScI TIPS/JIM 18 September 2008 NICMOS/NCS Anomaly and Status Anton Koekemoer 1 NICMOS/NCS Anomaly and Status Timeline overview: NICMOS/NCS was commanded.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
NICMOS Calibration Challenges in the Ultra Deep Field Rodger Thompson Steward Observatory University of Arizona.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
1 JULIA ROMAN-DUVAL & COS/STIS TEAM AUGUST 12, 2014 MOVING COS/FUV TO LIFETIME POSITION 3 See also Poster by Proffitt et al.
1 WFC3 Science Data Volume  Data Volume Estimates for WFC3 Operations ISR WFC ; Lisse, Henry, Knezek, Hanley; 3/27/2001 ISR WFC ; Lisse,
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
TIPS (09/20/07)Ilana Dashevsky1 NICMOS Defocus Mode Status Ilana Dashevsky (Commanding)
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
Control Loops Tune a Fish. Control Loops Tuning of a control loop involves selecting loop parameters to ensure stable control under all operating conditions.
STIS Status TIPS July 16, STIS Status STIS MIE anomaly –What is known STIS CCD status before the anomaly STIS MAMA SMOV status.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
STIS STATUS Charles Proffitt TIPs May 21, STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
ACS WFC Flat-Field Changes Temperature change from -77 C to -81 C on July 4, 2006 leads to expected changes for flat fields. Are L-flat measures stable.
Marco Sirianni TIPS 12/18/2003 Anomalous scattered light in ACS/WFC Data Marco Sirianni D. Van Orsow, A. Welty, T. Wheeler R. Gilliland, R. van der Marel.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
SPM Users Basic Training August 2010 Lecture VIII – AC Imaging Modes: ACAFM and MAC Imaging methods using oscillating cantilevers.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Launch and On-orbit Checkout
Motorola Solutions Internal Information
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Presentation transcript:

ACS Current Status M.Sirianni TIPS Feb 15, 2007

Agenda : ACS Side-2 failure SBC reactivation ACS programs conversion

Timeline: January 27, :29:12 – ACS began WFC observation, shutter was closed because of a GSACQ failure 12:34:17 – Initial spike in HST structure current 12:34:21 – Begin a 7-second ramp-up of HST structure and load bus current 12:34:28 – ACS PDU-2 fuse blows, ACS telemetry goes to zeros 12:34:33 – ACS suspended because of invalid mode 12:34:37 – NCS pressure sensor detects a pressure burst, initiating HV protection and NCS safing 12:34:38 – ACS safed because of invalid mode 12:34:42 – HST enters Inertial Hold January 29 – ACS Hybrid LEI team given “go” to prepare for Side-1 switch pending ARB recommendation and HST Project approval January 31 – ACS Side-2 ARB Kickoff Meeting. Goal: “Assess the risks of recovering SBC Operations on ACS Side-1” February 5 – ARB Status Briefing #1 to HST Project February 9 - ACS heater zone B switched to Side-1 February 13 – ARB Status Briefing #2 to HST Project February 15 - Flight Readiness Review

HST was recovered from Inertial Hold Safemode DOY 028 –Health and Safety SMS intercept at 028/07:00 –HGA communications restored at 028:07:55 Safing System is in its Nominal Operational Configuration –Neon Leak Safemode Test was re-enabled 028/17:45 UT Battery performance is nominal –Battery temperatures are below 0degC since event and converged –System SOC increased 3-5 A-H TPS reporting nominal pressures FHSTs and FGSs powered back on –Temperature and performance are as usual NCC was returned to its operate configuration on DOY 030/01:09 UT NICMOS was recovered to SAA Operate on 032/15:48 UT –Subsequent filter wheel checkout was nominal –Resumed science observations - NGC 4639 WFPC2 resumed nominal science operations – Calibration image of Omega Cen, a globular cluster

Structure current elevated in two events separated by ~3.5s –First event persisted for ~1.5s and peaked at ~6A –Second event persisted for ~7s, increased gradually, was very noisy, peaked at ~18.6A, and ended abruptly Main Bus current elevated during both events –First event approximately tracked structure current –Increase during second event peaked at ~37A PDU-2 current elevated only during second event, increase peaked at ~13.6A ACS input current monitor saturated at 12A during peak of second event and returned to zero when event ended ACS input voltage sagged by ~1.5V during peak of second event and dropped to zero when next sampled after drop in currents What was observed: NCS/ESM Total Pressure Sensor measured peak pressure of 1.0E-4 torr –Pre-anomaly reading was 1.6E-7 After the overcurrent event finished, the gas pressure decreased exponentially

Possible origin of fault: 1.MEB1- LVPS2 (Side-2) 2.Auxiliary Power Box (APB) 3.Harnesses between LVPS2 and APB Most likely cause of the fault: Exploding/burning tantalium capacitor The ARB is still investigating ways to rule out origin of the fault. So far the primary goal of the ARB has been the assessment whether SBC can be safely operated under side-1.

Hold Circuits Side-1 TEC Calibration Lamp Controller Hold Power 2 Heater Power 2 28V Spacecraft Input Power (PDU) TEC Power 2 CEB Power 2 Operate Power 2 Mechanism Power 2 Calibration Power 2 CEB MEB Side-2 Mechanisms Side-2 Hold Circuits Side-2 Zone A2 SBC Anneal Power Hold Power 1 Heater Power 1 28V Spacecraft Input Power (PDU) TEC Power 1 CEB Power 1 Operate Power 1 Mechanism Power 1 Calibration Power 1 MEB Side-1 Mechanisms Side-1 Anneal Power 1 Anneal Htrs Side-1 Anneal Htrs Side-2 Powered Units Unpowered Units Previously Failed Unit Zone B2 Zone A1 Zone B1 ACS Current Situation

Hold Circuits Side-1 TEC Calibration Lamp Controller Hold Power 2 Heater Power 2 28V Spacecraft Input Power (PDU) TEC Power 2 CEB Power 2 Operate Power 2 Mechanism Power 2 Calibration Power 2 CEB MEB Side-2 Mechanisms Side-2 Hold Circuits Side-2 Zone A2 SBC Anneal Power Hold Power 1 Heater Power 1 28V Spacecraft Input Power (PDU) TEC Power 1 CEB Power 1 Operate Power 1 Mechanism Power 1 Calibration Power 1 MEB Side-1 Mechanisms Side-1 Anneal Power 1 Anneal Htrs Side-1 Anneal Htrs Side-2 Powered Units Unpowered Units Previously Failed Unit Zone B2 Zone A1 Zone B1 ACS Side-1 powered on for SBC Operation

ACS Side-1 Checkout Programs –Filter Wheel Check (#11094, 2 internal orbits, P.I. = C. Cox) Commands the SBC filter wheel to each of its positions (in both directions) Verifies proper motion of wheel through encoder readout Test has been used previously (e.g., Side-2 switch) –SBC MAMA Recovery (#11048, 4 internal orbits, P.I. = C. Cox) Initial MAMA turn-on and recovery from anomalous shutdown –SBC was off when ACS was safed, so this is a conservative procedure Brings the MAMA back to operating condition while watching for possible problems –Signal processing check –Intermediate high voltage ramp-up –Full high voltage ramp-up Fold analysis provides detailed performance information –Measures charge cloud size on anode and gain Darks and flats obtained during test Test has been used previously (e.g., Side-2 switch)

–Three Stage Contamination Check/Monitor Modification of Internal Flatfield Program (#11052, P.I. = R. Bohlin) –D 2 flat for all 6 filters (6 orbits) –Subset of filters (2 orbits) each week to monitor until external (NGC6681) observation is obtained (maximum of three weeks) Modification of SBC Flux Calibration Program (#11056, P.I. = J. Walsh) –Single orbit ASAP on white dwarf standard WD (visible now) »F122M, F165LP, PR110L PR130L –Second orbit one week later UV Contamination Monitor (#11050, P.I. = R. Gilliland) –Observation of NGC6681 (1 external orbit) –NGC6681 becomes visible ~ February 28 –Comparison against historical data –Exposures in all 6 filters and 2 darks (in occultation period) –Repeat up to 4 times

Conversion of ACS programs SPD and HST MO have asked INS to review existing cycle15 ACS proposals to identify candidates for a conversion to WFPC2 or NICMOS ~ 120 programs are receiving a double technical review by INS. An internal Feasibility Review panel will asses science and time with guidance from the technical reviews. Most of the PIs will be notified in early March. (PI can/will appeal Review of phase-1s is coordinated by L.Smith. Phase-2s will be processed following the usual procedures (with limited reviews).

Backup Slides

WFPC2: Omega Cen - f814W (after anomaly event)

MEB 1 LVPS 2 MEB 2 LVPS 1 CEBs SBC APB Physical Isolation Debris possible in LVPS2 and APB Side 2 Physical Isolation Fuse Open Hold Power presently active Fuse OK Only new powered state in vicinity of anomaly suspects is MEB1 CS/SES sections; Physical Isolation is provided

STIS MEB

ACS, Side-2 with panels removed APB is mounted to truss; here shown unsecured and resting in cavity

WFC Dark Current WFC Hot Pixels The new the temperature setpoint brought dark Current and hot pixels back to the level after only 18 months on orbit.